ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2017, Vol. 37 ›› Issue (10): 1334-1340.DOI: 10.3973/j.issn.1672-741X.2017.10.019
Previous Articles Next Articles
CAI Bao, SHI Kunju, ZHU Wenhua
Received:
Revised:
Online:
Published:
Abstract:
Blockings usually occur to cutterhead and cutter box during tunneling of composite earth pressure balance (EPB) shield. As a result, the rationalities of cutterhead and cutter arrangement are studied in terms of cutting effect; the dynamic cutting simulation method of cutter group and disc cutter group is adopted; the evaluation indices for soil mass variation and cutterhead loading are put forward. The simulation results show that: 1) In soft soil stratum, the cutting effect of the cutter group with inner angle is obviously better than that without inner angle. 2) The small cutter overlap should be adopted when tunneling in soft stratum; and large cutter overlap should be adopted when tunneling in hard stratum. The study of cutter group layout can provide a method to solve practical engineering problems and the finite element simulation results can provide reference for the design of cutterhead and cutter group of EPB shield.
Key words: multiple geological conditions, composite earth pressure balance (EPB) shield, cutterhead, cutter layout, dynamic cutting simulation, cutter group
CLC Number:
U 455.3
CAI Bao, SHI Kunju, ZHU Wenhua. Study of Cutting Simulation of Shield Cutter Group Based on ABAQUS[J]. Tunnel Construction, 2017, 37(10): 1334-1340.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2017.10.019
http://www.suidaojs.com/EN/Y2017/V37/I10/1334
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure