Development and Application of Key Technologies to Quasirectangular Shield Tunneling

ZHU Yaohong1, ZHU Yanfei2, HUANG Dezhong2, YANG Zhihao3, LIU Xian4, LIU Shuang2   

  1. (1. Ningbo Rail Transit Group Co., Ltd., Ningbo 315101, Zhejiang, China; 2. Shanghai Tunnel  Engineering Co., Ltd., Shanghai 200232, China; 3. Shanghai Tunnel Engineering & Rail Transit Design and Research Institute, Shanghai 200235, China; 4. Tongji University, Shanghai 200092, China)
  • Received:2017-04-17 Revised:2017-08-25 Online:2017-09-20 Published:2017-09-28

Abstract:

The management mode of scientific researchdesignconstruction integration is adopted in Line No. 4 project of Ningbo Metro; and the technical system of railway transit quasirectangular shield tunnel is developed. By adopting the abovementioned technical system, the problems of segment design and structural optimization have been solved. The fullface cutterhead and driving system, shield hinging and sealing technology and ringarm segment erector have been developed. The simultaneous grouting technology, segment erection simulation and technical optimization and shield axial line control have been studied. A new kind of singletube doubleline tunnel will appear to solve the problem of limit underground space in core districts of cities in China.

Key words: quasirectangular shield, lining structure design, full workface excavation, ringarm segment erector, segment assembling, simultaneous grouting

CLC Number: