[1] |
DONG Zhiming, GUO Baode, XU Zeqi, ZHANG Xiaoqin, CAO Jiantao.
Research and Application of Light Environment of
Highway Tunnel Portal Based on BIM Technology
[J]. Tunnel Construction, 2021, 41(S2): 144-150.
|
[2] |
XU Youjun, LI Degong, SUN Hongbin.
BIMBased Automatic Acquisition and
Intelligent Control Method for Pipeline
Installation Schedule for Auxiliary Works of Subway Station
[J]. Tunnel Construction, 2021, 41(S1): 375-.
|
[3] |
LYU Gang, LIU Jianyou, ZHAO Yong, YUE Ling.
Key Technologies for Intelligent Construction of
Tunnels on Beijing-Zhangjiakou
High-speed Railway
[J]. Tunnel Construction, 2021, 41(8): 1375-.
|
[4] |
ZHU Yongxue, ZHANG Xiangjun, ZHANG Jiabao, SUN Lei, SHI Yong, TAN Denghong.
Parametric Modeling of Highway Tunnel Based on Civil
3D + Revit + Dynamo
[J]. Tunnel Construction, 2020, 40(S2): 109-115.
|
[5] |
ZHU Deqing, LI Tao, YAO Jian, DUAN Yunsheng, DUAN Chunpeng.
Development and Application of a BIMbased
Informationized Management System for Mountain Tunnel
Construction
[J]. Tunnel Construction, 2020, 40(S2): 216-224.
|
[6] |
LI Xiaojun, TIAN Yinxue, CHEN Shuwang, WANG Anmin.
Application Status and Analysis of Building
Information Model (BIM) Technology
in Tunnel Engineering
[J]. Tunnel Construction, 2020, 40(7): 953-0963.
|
[7] |
WU Xianguo, WANG Lei, CHEN Hongyu, ZHANG Limao, ZHANG Kainan.
Design and Realization of Health Monitoring System for
Operation Metro Structure Based on BIM based Internet
of Things
[J]. Tunnel Construction, 2020, 40(6): 905-914.
|
[8] |
XU Litong, QI Xiangcheng, CUI Yanji, LU Kai, CHEN Xiaowei.
Application of BIM to Mountain Tunnel Based on Autodesk Platform
[J]. Tunnel Construction, 2020, 40(2): 267-275.
|
[9] |
HUANG Qiming, QIU Wenge, WAN Shifu, ZHAO Hailin, DUAN Dongya.
Parametric Modeling of Hatbrim
Slanting Cut Tunnel
Portal Based on MicroStation
[J]. Tunnel Construction, 2020, 40(11): 1602-1606.
|
[10] |
SU Liyong, ZHOU Yi, ZHANG Zhiwei, LU Qingquan.
Application Research of Urban Rail Transit Accessory
Integration Project Based on BIMGIS Technology: a Case Study on
Phase 1
Project
of Beijing Metro Line No. 19
[J]. Tunnel Construction, 2020, 40(11): 1541-1551.
|
[11] |
LU Yaobang, ZHUO Yue, SI Jingzhao, ZHANG Jianshe.
Research on BIM Construction Application in
Gaoligongshan Tunnel on
DaliRuili Railway
[J]. Tunnel Construction, 2020, 40(10): 1516-1524.
|
[12] |
SU Liyong, ZHOU Yi, ZHANG Zhiwei, LU Qingquan.
Research and Thinking on Application of BIM Technology in Rail Transit Engineering: a Case Study on Phase 1 Project
of Beijing Rail Transit Line No.19
[J]. Tunnel Construction, 2020, 40(10): 1399-1407.
|
[13] |
宋神友, 陈伟乐, 金文良, 夏丰勇, 付佰勇.
深中通道工程关键技术及挑战
[J]. Tunnel Construction, 2020, 40(1): 143-152.
|
[14] |
DING Hao, LIAO Jun.
Design and Research of Tunnel Engineering Information Platform Based on BIM Technology
[J]. Tunnel Construction, 2019, 39(S2): 60-68.
|
[15] |
YANG Quanrong, WANG Yu, HE Yuechuan.
Integration Application of a Construction Monitoring System of Urban Rail Transit Based on BIM and GIS
[J]. Tunnel Construction, 2019, 39(S2): 345-351.
|