| [1] |
YU Li, GUO Xiaohan, WANG Mingnian, LIU Yuan, LI Junqi.
Design of Evacuation and Rescue in Underwater Railway Shield Tunnels Based on Evacuation Psychology and operational safety
[J]. Tunnel Construction, 2026, 46(S1): 397-405.
|
| [2] |
LIN Chungang, LI Jielin, ZHOU Zhibin, YANG Chengye, ZHANG Danfeng.
Development of Intelligent Construction System and Its Management Platform for Railway Tunneling With Drilling and Blasting Method
[J]. Tunnel Construction, 2026, 46(9): 1846-1860.
|
| [3] |
LI Xu, DUO Shengjun, REN Chenning, WANG Huiwu, HUANG Pengli, ZHOU Mingliang.
Line Fitting for Emergency Repair of Tunnels Crossing Active Faults After Seismic Displacement Based on Objective Optimization Using Nondominated Sorting Genetic Algorithm Ⅱ
[J]. Tunnel Construction, 2026, 46(9): 2001-2010.
|
| [4] |
LIAN Jie, YANG Jixiang, TIAN Siming, XING Peigang, CHEN Xiwu, GUO Quan, SHI Zhengying.
Automated Recognition and Management System for Railway Tunnel-Construction Processes
[J]. Tunnel Construction, 2026, 46(6): 1208-1219.
|
| [5] |
ZHANG Tian, FU Bingxian, GAO Yaming, NIU Yabin, ZHANG Lixia.
Prefabricated Composite Lining Structure for Reinforcing Railway Tunnel Linings and Its Construction Technology
[J]. Tunnel Construction, 2026, 46(5): 1121-1132.
|
| [6] |
TIAN Siming, ZHANG Yiteng, LI Shucai, LIU Dagang, LI Xu.
Construction and Intelligent Design of a High-Performance Active Support System for Railway Tunnels
[J]. Tunnel Construction, 2026, 46(4): 790-803.
|
| [7] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [8] |
ZHAO Yong, TIAN Siming, GONG Jiangfeng, CAO Yong.
Statistical Analysis of Railway Tunnels in China by the End of 2025 and Achievements in the 14th Five-Year Plan Period
[J]. Tunnel Construction, 2026, 46(4): 877-892.
|
| [9] |
AI Wenkai.
Large Deformation Characteristics of Layered Rock Masses and Deformation Control of Asymmetric Support in High-Speed Railway Tunnels
[J]. Tunnel Construction, 2026, 46(2): 371-382.
|
| [10] |
WANG Shuaishuai, QIU Wenge, SHI Jingfeng, XU Yong, SUN Xiangdong, WANG Yongshi, CHEN Haozhe, DUAN Dongya.
Shrinkage Restraint Cracking Mechanism and Anticracking Optimization Measures for Lining of High-Altitude Tunnels
[J]. Tunnel Construction, 2026, 46(1): 168-182.
|
| [11] |
SONG Xiaokai.
Application of Continuous Circumferential Milling-Type Chiseling Trolley for Operating Railway Tunnel Lining
[J]. Tunnel Construction, 2026, 46(1): 204-213.
|
| [12] |
ZHANG Wenming, ZHANG Lifeng, WANG Fei, LU Hailiang, YU Haitao, LI Junqi.
Primary Technology Innovation and Application of Underground Utility Tunnel Construction in Xiong′an New Area, China
[J]. Tunnel Construction, 2026, 46(1): 214-223.
|
| [13] |
LIU Bin, JI Lei, LI Changpeng, LUO Yanbin, GE Qiang, CHEN Jianxun, LI Hai.
Stability Analysis of Surrounding Rocks of Horizontally-Layered Mudstone With Weak Interlayer in Single-Track Railway Tunnels
[J]. Tunnel Construction, 2025, 45(S2): 150-162.
|
| [14] |
WU Kui, SU Yanxin, SUN Fengbiao, LI Zhongzhi, CHEN Lei.
Passive Source Seismic Wave Detection in Shield Tunneling: A case study of Suzhou East High-Speed Railway Tunnel
[J]. Tunnel Construction, 2025, 45(S2): 258-268.
|
| [15] |
LIU Xiaogang, SONG Yi, GUO Yanhai, YAO Xilei.
Design of Common Structure Section Between Jinan-Binzhou High-Speed Railway Tunnel and Airport
[J]. Tunnel Construction, 2025, 45(S2): 280-288.
|