ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2020, Vol. 40 ›› Issue (6): 898-904.DOI: 10.3973/j.issn.2096-4498.2020.06.016
Previous Articles Next Articles
LI Yabo1, LI Jing2, 3, *
Online:
Published:
Abstract: Problems, i.e. cavity behind crown, insufficient thickness of lining and crown spalling, exist in secondary lining of railway tunnel. As a result, the technical schemes, i.e. combination of concrete prefabrication technology and castinplace technology, precast segment used in secondary lining arch, and the castinplace concrete used in the other parts of secondary lining, are put forward. And the Lshaped joint concrete lining formwork trolley is developed. The structure and design of the trolley are introduced in detail, the design scheme and parameters are determined, and the field application of the trolley in Hujiagou Tunnel of East Ring Line of Chongqing Railway Terminal is briefly described. The use of the trolley can shorten the construction period, reduce the number of construction personnel, and solve the problem of crown spalling.
Key words: railway tunnel, crown spalling, Lshaped joint concrete formwork, precast segment, castinplace on side, lining trolley, structural design
CLC Number:
U 455.3
LI Yabo, LI Jing. Design of Lshaped Joint Concrete Lining Formwork Trolley[J]. Tunnel Construction, 2020, 40(6): 898-904.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2020.06.016
http://www.suidaojs.com/EN/Y2020/V40/I6/898