ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2020, Vol. 40 ›› Issue (S1): 404-412.DOI: 10.3973/j.issn.2096-4498.2020.S1.053

Previous Articles     Next Articles

Study on Dismantle Technology of  6 680 mm Shield in Narrow Mined Tunnel

KOU Dingtao1, 2, SUN Jian1, 2   

  1. 1. Beijing MTR Construction Administration Corporation, Beijing 100068, China;2. Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit, Beijing 100068, China)

  • Online:2020-08-30 Published:2020-09-14

Abstract: In order to solve the problem that the shield cannot receive normally due to size restriction of the receiving end in narrow space, it is necessary to take auxiliary measures to disassemble the main parts and then transport them back to launching shaft along the original shield tunnel and lift them out. A 6 680 mm shield is adopted in the left line between Pinganli Station and Jishuitan Station of Beijing Metro Line 19 Phase Project, through the study on the size and embedded design of the receiving end, the disassembly scheme and sequence in mined space, the auxiliary hoisting technology during the disassembly process, the construction period management and other aspects, the shield disassembly scheme and control points in narrow and mined space are summarized, and the emphasis and difficulties and key technologies of disassembly are analyzed. The results show that the technology ensures the construction safety and progress, solves the technical and safety problems for shield construction in narrow and mined space.

Key words: shield, narrow and mined space, shield dismantle plan, shield disassembly, shield receiving

CLC Number: