Tunnel Construction ›› 2023, Vol. 43 ›› Issue (S1): 323-329.DOI: 10.3973/j.issn.2096-4498.2023.S1.037
Previous Articles Next Articles
SONG Bingjing
Online:
Published:
Abstract: Many problems exist in urban renewal, such as insufficient coordination between rail transit and other types of urban transportation, lack of integration of station land and urban regional planning, inconsistency between station construction standards and urban regional development, mismatch between traffic facility capacity and surge passenger flow demand, and unclear humanization measures based on people orientation. Therefore, the method of summarizing and introducing relevant examples for demonstration is adopted to explore the focus and actual demand of the sustainable development of the station. Some sustainable development strategies for the rail transit station in the process of urbanization are obtained as follows: (1) Under the background of multinetwork integration, the station should adopt multimode connection design. (2) Rail transit development and urban regional construction should be integrated. (3) Distinctive urban characteristics should be shown on the basis of humanistic integration design. (4) The station construction standards should be effectively classified according to the line, region, and characteristics. (5) Adaptive transformation design of station space should be conducted. (6) Smart metros and lowcarbon energysaving sustainable development strategies should be formulated by stages, levels, and categories.
Key words: rail transit, station design, urban renewal, sustainable development strategy
SONG Bingjing. Sustainable Development Strategies for Rail Transit Stations from Perspective of Urban Renewal[J]. Tunnel Construction, 2023, 43(S1): 323-329.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.2096-4498.2023.S1.037
http://www.suidaojs.com/EN/Y2023/V43/IS1/323
Key Technology and Application of Efficient Tunneling of an Extra-Long Tunnel Bored by Two Tunnel Boring Machines
Forward Design and Application of Building Information Modeling in Shenzhen Huangmugang Comprehensive Transportation Hub Project
Construction Technology of Prefabricated Slab Track under Trackless Tooling Mode: a Case Study of Suzhou Rail Transit Line 5
Design of Long and Steep Slope Section from Aerospace City to East Chang′an Street of Xi′an Metro Line 15