| [1] |
YU Li, XIAO Yang, GONG Jiangfeng, CHEN Lanxin, WANG Leming, ZHANG Xiao.
Dynamic Response of Underwater Tunnels and Sandy Strata With Different Under-Track Structures Under Train Load
[J]. Tunnel Construction, 2026, 46(5): 960-969.
|
| [2] |
LYU Gang, LIU Jianyou, YU Chenyun, CHEN Hui, ZHAO Yong, SHI Shaoshuai.
Practice and Prospect of Green and LowCarbon
Construction Technology for Railway Tunnels
[J]. Tunnel Construction, 2024, 44(4): 633-642.
|
| [3] |
YANG Gongbiao, YUAN Dajun, CHEN Jian, WANG Teng, HAN Bingyu.
Experimental Study on Slurry Pressure and Propagation
Path of Soil Fracturing
During Slurry Shield Tunneling in Clay Stratum
[J]. Tunnel Construction, 2024, 44(4): 698-704.
|
| [4] |
CHEN Jianqin, FENG Xiaoyan, WEI Huai.
Statistics and Analysis of Underwater Tunnels in China(by the End of 2023)#br#
[J]. Tunnel Construction, 2024, 44(4): 826-881.
|
| [5] |
YUAN Jiaming, XIE Jingchao, XUE Peng, CHAI Henan, JIANG Zhenxiong, WANG Yining, LIU Jiaping.
Emission Characteristics of Vehicle Pollutants Based on a Tunnel Experiment in Nanjing, China
[J]. Tunnel Construction, 2024, 44(10): 2069-2076.
|
| [6] |
TAN Zhongsheng, WU Jingang.
Review and Prospects of Drilling and Blasting Tunnel
Construction Technology in China
[J]. Tunnel Construction, 2023, 43(6): 899-920.
|
| [7] |
LI Dawei, SHEN Guili, YANG Jianquan, SHI Anzheng.
Design and Research of Test Bed for Sealing
Performance of Shield Tail Under UltraHigh Water Pressure
[J]. Tunnel Construction, 2023, 43(5): 874-878.
|
| [8] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
| [9] |
LI Zengjun.
GuidedShield Tunneling Method: An
Innovative Thought on Underwater Tunneling Method
[J]. Tunnel Construction, 2021, 41(10): 1801-1808.
|
| [10] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
| [11] |
ZHANG Zhigang, LI Jinfeng.
Application and Demonstration of HealthSafetyEnvironment Risk Management to Underwater Tunnel of Hong KongZhuihaiMacao Link
[J]. Tunnel Construction, 2019, 39(2): 189-196.
|
| [12] |
TIAN Feng, WANG Haiqiao, ZHU Zhulong, CHEN Shiqiang, HUANG Junxin.
Study and Application of Algorithm of Available Safety Evacuation Time in Long Subsea Metro Tunnel
[J]. Tunnel Construction, 2019, 39(1): 54-59.
|
| [13] |
CHEN Xianghong, TAO Lianjin, LIU Chunxiao, AN Linxuan, AN Junhai.
Study of Influence of Grading and Channel Dredging on Stability of Subsea Tunnel in Landsea Connecting Area
[J]. Tunnel Construction, 2016, 36(7): 806-811.
|
| [14] |
LYU Qingsong, HE Weiguo, FANG Zulei, CHENG Shihao.
Discussion on Design of Drainage System of Long Underwater Tunnels
[J]. Tunnel Construction, 2016, 36(11): 1361-1365.
|
| [15] |
GUO Xiaohong.
Analysis of Geological Investigation Technologies for Underwater Highway Tunnels
[J]. Tunnel Construction, 2016, 36(10): 1190-1195.
|