| [1] |
ZHANG Jianming, SHI Kebin, JIA Yunfu, REN Zhiqiang, BAHETEBIEKE Dalayihan, LIU Zhao.
Shapley Additive Explanations Interpretation Model for
Penetration Rate Prediction of Tunnel Boring Machines Based on
Variational
Mode Decomposition and Weighted Random Forest
[J]. Tunnel Construction, 2024, 44(5): 1012-1028.
|
| [2] |
LIU Xiaochun.
Topological Optimization of Swing Structure of Tunnel
Boring Machine Carried Bolt Drill
[J]. Tunnel Construction, 2022, 42(1): 137-144.
|
| [3] |
QI Mengxue.
Development, Current Status, and Prospects of
TBM Tunneling Technology in China
[J]. Tunnel Construction, 2021, 41(11): 1964-1979.
|
| [4] |
ZHANG Binrong, GUAN Huisheng, ZHAO Changsheng, WANG Mo.
Finite Element Simulation Analysis of Rock Breaking Test Platform for Dualmode TBM Cutter
[J]. Tunnel Construction, 2019, 39(S1): 290-295.
|
| [5] |
XUE Yadong, LIAN Xu, LI Xing, ZHOU Jie.
Experimental Study of Rock Vibration Characteristics Induced by Disc Cutter Rock Breaking
[J]. Tunnel Construction, 2018, 38(S2): 337-344.
|
| [6] |
WANG Yanjun, QI Mengxue.
Prospects of Key Technologies of Rock Tunnel Boring Machine
[J]. Tunnel Construction, 2018, 38(9): 1428-1434.
|
| [7] |
HE Fei, TIAN Yanchao, SHANG Yong, MA Hongsu, YIN Lijun.
Experimental Research on Fullscale Linear Cutting of Granite by TBM Disc Cutters
[J]. Tunnel Construction, 2018, 38(12): 2063-2070.
|
| [8] |
YU Li, WANG Xiaoliang, WANG Mingnian, WEI Junzheng, TIAN Yuan.
Study of Cooling Technology for Long TBM Water Diversion Tunnel
[J]. Tunnel Construction, 2018, 38(11): 1778-1784.
|
| [9] |
HE fei, ZENG Xiangsheng, QI Zhichong.
Application of Largediameter Hard Rock Tunnel Boring Machine (TBM) to TBM3 Section of No. 4 Bid of Songhua River Water Conveyance Project in Middle Jilin Province
[J]. Tunnel Construction, 2016, 36(8): 1016-1022.
|
| [10] |
ZHAO Changsheng, GUAN Huisheng, YANG Yandong, HE Bin, TIAN Zhijie.
Design of Dualmode Experimental Platform for Rock Breaking by TBM Cutters
[J]. Tunnel Construction, 2016, 36(3): 338-343.
|
| [11] |
YANG Yandong, CHEN Kui, GUO Lu, LI Xing.
Analysis of Influencing Factors of Wear of Disc Cutter of Fullface Hard Rock Tunnel Boring Machine
[J]. Tunnel Construction, 2016, 36(11): 1394-1400.
|
| [12] |
ZHAO Zhenwei, ZHENG Kangtai, LI Nan, MA Changcheng.
Analysis on Static Mechanical Performances of TBM Cutterhead with Different Geometries
[J]. Tunnel Construction, 2016, 36(1): 102-107.
|
| [13] |
ZHOU Yanling.
Stepping Technology of Opentype TBM
[J]. Tunnel Construction, 2015, 35(5): 468-472.
|
| [14] |
GUAN Huisheng, ZHANG Yu, YANG Yandong.
Study on Key Boring Parameters of Dualmode Shield Used for Inclined Shaft of Xinjie Taigemiao Mines
[J]. Tunnel Construction, 2015, 35(4): 377-381.
|
| [15] |
YANG Yandong, CHEN Kui, ZHANG Bing, GUO Lu.
Prediction of Disc Cutter Wearing Loss Based onMacro Energy Theory and Micro Wearing Mechanism
[J]. Tunnel Construction, 2015, 35(12): 1356-1360.
|