[1] |
ZHU Bangfan, CHEN Lifei, DU Xiaoqing, SHENG Qiqiu.
Application of Shield Method to Utility Tunnel on Huagong Road in Harbin
[J]. Tunnel Construction, 2019, 39(3): 459-464.
|
[2] |
WANG Xiaodun, WANG Bingyan, HUANG Dezhong, WEN Suolin, CHEN Zhihua.
Numerical Simulation of Mechanical Properties of Quasirectangular Shield Tail
[J]. Tunnel Construction, 2018, 38(9): 1463-1470.
|
[3] |
LIN Naishan, CHEN Bin, YAO Yanming, ZHANG Chunjin.
Practice and Suggestion on QuasiRectangular Shield Tunnel Engineering of Entrance/Exit Section on Ningbo Rail Transit Line No. 3
[J]. Tunnel Construction, 2017, 37(6): 722-729.
|
[4] |
WANG Cheng, WANG Guoyi.
Study and Application of New Type Twocomponent Grout to Simultaneous Grouting of Shield Tunnel
[J]. Tunnel Construction, 2017, 37(4): 416-420.
|
[5] |
REN Chengguo.
Backfilling Grouting Technology for Shieldbored Tunnel in Waterrich Bedrock Strata: Case Study on Xiangjiang Tunnel on ChangshaZhuzhouXiangtan Intercity Railway
[J]. Tunnel Construction, 2015, 35(9): 935-938.
|
[6] |
ZHOU Shaodong, LIN Wenshu, WANG Hongxi, XU Ke, LIN Jianping, WANG Biao, DING Qingjun.
Development of Additives Dedicated for Preparing Highperformance Simultaneous Grouting Material
[J]. Tunnel Construction, 2014, 34(3): 205-211.
|
[7] |
XU Jianping, LIN Wenshu, XU Ke, LIN Jianping, WANG Biao, MIAO Qiang, Ding Qingjun.
Study on Rapidhardening Highperformance Simultaneous Grouting Material for Shieldbored Tunnels
[J]. Tunnel Construction, 2014, 34(2): 95-100.
|
[8] |
HE Xiongfei.
Study on Mixing Proportion of Singlecomponent Inert Grout for Simultaneous Grouting
[J]. Tunnel Construction, 2012, 32(增刊2): 24-30.
|
[9] |
LI Bo, WANG Jun, SHU Qi-Lin, ZHANG Da-Wei-.
Design of Experimental Device for Simultaneous Grouting Test Platform of Shield Machine
[J]. Tunnel Construction, 2012, 32(2): 146-149.
|
[10] |
李博,舒启林,王军,张大伟.
Design of Test Platform of Simultaneous Grouting System of Shield
[J]. Tunnel Construction, 2011, 31(5): 569-572.
|
[11] |
TIAN Gong-Meng.
Development of DZ100 Series of Grouting Pumps
[J]. Tunnel Construction, 2010, 30(6): 716-723.
|
[12] |
HE Xiong-Fei, WANG Guang-Hui.
[J]. Tunnel Construction, 2010, 30(1): 9-14,23.
|
[13] |
PI Jing-Kun, Diao-Yun-Chen.
Causes and Countermeasures for Segment Uplift of Shieldbored Tunnels
[J]. Tunnel Construction, 2009, 29(6): 616-618.
|
[14] |
TIAN Kun, DING Qiang-Jun, CHEN Ti-Qiang, LUO Ji.
Optimal Design of High Volume Fly Ash Simultaneous
Grouting Material for Shield Tunnel
[J]. Tunnel Construction, 2007, 27(4): 26-29.
|
[15] |
XIE Jun-Liang, Zhang-Liang-Hui, Yang-Xiao-Beng.
Application of New Construction Technologies in ChiLu Running Tunnel Works on Line 2 of Guangzhou Metro
[J]. Tunnel Construction, 2006, 26(增刊2): 33-36.
|