| [1] |
WANG Weiqi, LIAN Changjiang, LI Jianping, CHEN Zhiyong, CHENG Donghai, ZHAO Fangchang.
Identification Technology for Tunnel Surrounding Rock Properties Using Microtremor Detection and Magnetotelluric Methods
[J]. Tunnel Construction, 2025, 45(12): 2313-2323.
|
| [2] |
QIN Yawei, TAN Yi, JU Wanglai, CHEN Bin.
Collapse Risk Assessment of Mountain Tunnels Based on
SetPair Analysis Theory and Digital Platform
[J]. Tunnel Construction, 2024, 44(3): 475-483.
|
| [3] |
DAI Zhiren, HU Ruiqing, WANG Zeyu, ZHAO Qichao.
Mechanism and Treatment Measures of Water and Sand
Inrush in
Operational Tunnel in Karst Area
[J]. Tunnel Construction, 2023, 43(S2): 369-377.
|
| [4] |
NIU Guoliang.
Application of Controlled Drainage Using Pressure
Relief Valves for Single-Shield Tunnel Boring Machine
Segmental Linings
[J]. Tunnel Construction, 2023, 43(12): 2089-2097.
|
| [5] |
FEI Jianbo, WEI Jiayan, JIN Jiakang, MA Weibin, CHEN Xiangsheng.
Design and Application of Seismic Isolation Structure
for Mountain Tunnels in EarthquakeProne
Areas
[J]. Tunnel Construction, 2023, 43(11): 1935-1943.
|
| [6] |
ZHANG Zhiguo, CHENG Zhixiang, WANG Jiacheng, WU Zhongteng, ZHAO Qihua.
Interaction between Surrounding Rock and Lining of
DeepBuried Tunnel Considering Influence of
Seepage
[J]. Tunnel Construction, 2021, 41(S1): 108-.
|
| [7] |
TIAN Siming, WANG Wei, YANG Changyu, LIU Cheng, WANG Mingnian, WANG Kejin, MA Zhifu, LYU Gang.
Development and Prospect of Railway Tunnels in China
in Recent 40 Years
[J]. Tunnel Construction, 2021, 41(11): 1903-1930.
|
| [8] |
ZHU Deqing, LI Tao, YAO Jian, DUAN Yunsheng, DUAN Chunpeng.
Development and Application of a BIMbased
Informationized Management System for Mountain Tunnel
Construction
[J]. Tunnel Construction, 2020, 40(S2): 216-224.
|
| [9] |
LI Xiaojun, XU Hao, GOKDEMIR Cagri, WANG Fei, HUANG Xuewen.
TSPAC Analysis Method for Impact of Groundwater
Drawdown Induced by
Tunnel Drainage on Terrestrial Vegetation
[J]. Tunnel Construction, 2020, 40(9): 1261-1271.
|
| [10] |
XU Litong, QI Xiangcheng, CUI Yanji, LU Kai, CHEN Xiaowei.
Application of BIM to Mountain Tunnel Based on Autodesk Platform
[J]. Tunnel Construction, 2020, 40(2): 267-275.
|
| [11] |
LEE Chiahan, WANG Taitien.
Method of Diagnosing Causes for Lining Cracks of Mountain Tunnels: with Examples of Mechanical Factors
[J]. Tunnel Construction, 2014, 34(增刊): 82-87.
|
| [12] |
FAN Ben, ZHENG Jiqiang, ZHU Kundian.
Georobotbased Automatic Deformation Monitoring in Tunnel Construction
[J]. Tunnel Construction, 2014, 34(1): 19-23.
|
| [13] |
LI Fengguo.
Construction Technology for Tunnel Portal
Sections in Unsymmetrical Loaded Mountains
[J]. Tunnel Construction, 2009, 29(增刊2): 99-103,132.
|
| [14] |
LEI Hong-Liang.
Comments on Rescue Methods for Closing Collapses of Mountain Tunnels
[J]. Tunnel Construction, 2007, 27(5): 14-16.
|
| [15] |
ZHANG Pi-Jie.
Machinery Matching Technology for
Mechanized Construction of Long Tunnels
[J]. Tunnel Construction, 2006, 26(1): 39-43.
|