Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2008, 28 (4) Published: 20 August 2008
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Study on Displacement Control Criteria of Large Spanned
Subsea Tunnel Constructed by CRD Method
LI Jingeng
2008, 28(4): 399-402
DOI:
A
Abstract
(
2094
)
PDF
(509KB) (
1001
)
Theoretical Calculation and Analysis on Works Stability:
Case Study on South Tibet Road Rivercrossing Tunnel
Passing Underneath M8 Metro Running Tunnel in Shanghai
DU Feng
2008, 28(4): 403-407
DOI:
A
Abstract
(
1873
)
PDF
(1491KB) (
1148
)
Analysis on Influence of Slurry Feeding/Discharging Pumps and Feeding
Slurry Densities on Maximum Boring Advance Rates: Case Study on
Slurry Shields of Wuhan Yangtze River Crossing Highway Tunnel
ZHAO Yunchen, WANG Guanghui, WANG Chaofeng
2008, 28(4): 408-411
DOI:
A
Abstract
(
1719
)
PDF
(3120KB) (
1361
)
Study on Shock Absorption Measures for Doublelane Highway
Tunnels in High Earthquake Intensity Regions
LING Yanting, GAO Bo
2008, 28(4): 412-415
DOI:
A
Abstract
(
1928
)
PDF
(1415KB) (
871
)
Analysis and Calculation of Trend Alarm Value in Shield Boring
HOU Gang
2008, 28(4): 416-417
DOI:
B
Abstract
(
1770
)
PDF
(270KB) (
1142
)
Analysis on Tunnel Accident on Line 1 of Saint Petersburg Metro
HU Xiangdong,BAI Nan,LI Hongbo
2008, 28(4): 418-422
DOI:
B
Abstract
(
2710
)
PDF
(1652KB) (
4008
)
Preliminary Construction Plan for Tunnel on Qiongzhou
Strait Crossing Railway Project
CHENG Zhenting
2008, 28(4): 423-428,451
DOI:
A
Abstract
(
1935
)
PDF
(3613KB) (
1734
)
Comments on Longdistance Tunnel Construction
by means of Doubleshield TBMs
MENG Xianjun
2008, 28(4): 429-433,475
DOI:
B
Abstract
(
2009
)
PDF
(750KB) (
1470
)
Monitoring and Analysis on Influence of Highrise Building
Construction on Existing Underneath Tunnel
LIU Hao, XIAO Wuquan, LENG Wuming
2008, 28(4): 434-437,451
DOI:
A
Abstract
(
2058
)
PDF
(1025KB) (
1079
)
Analysis on Parameters of Pipe Roof Advance Support Installed in Portal
Sections of Shallowburied Doublearched Tunnels
BI Junli, WANG Weifeng,LIU Changlin
2008, 28(4): 438-444,455
DOI:
A
Abstract
(
1842
)
PDF
(3167KB) (
1159
)
Comments on Some Topics in “Code for Metro Design”
HU Jianguo,Chen Hong
2008, 28(4): 445-446
DOI:
B
Abstract
(
1765
)
PDF
(275KB) (
1170
)
Optimization Design on Alignment of K112+500~
K119+500 Section of a Highway
SUN Lianwei
2008, 28(4): 447-451
DOI:
B
Abstract
(
1937
)
PDF
(1137KB) (
770
)
Composite Beam Effect in Calculation of Deep Foundation Pits
CHU Kejun
2008, 28(4): 452-455
DOI:
B
Abstract
(
1834
)
PDF
(1492KB) (
886
)
Study on Gallerytype Jet Construction Ventilation Technology for
Superlong Tunnels and Its Application in Works
YANG Jiasong
2008, 28(4): 456-459
DOI:
A
Abstract
(
2161
)
PDF
(499KB) (
1445
)
Construction Technology for Doublearched
Tunnel with Superposed Partition Wall
SUN Zhongcheng
2008, 28(4): 460-464,475
DOI:
B
Abstract
(
1971
)
PDF
(2030KB) (
1176
)
Key Technology for Construction of Secondary Lining of Mined Metro Ventilation
Gallery with Double Story, Double Span, Flat Roof and Upright Wall
YANG Weihu ,DU Jiang , LIU Huanqiang
2008, 28(4): 465-468,488
DOI:
B
Abstract
(
1892
)
PDF
(2357KB) (
1249
)
Application of ADECORS Approach in Tunneling in Foreign Countries
ZHAI Jinying, YANG Huijun, WANG Lili
2008, 28(4): 469-475
DOI:
B
Abstract
(
2064
)
PDF
(2891KB) (
1527
)
Comparison of Construction Schemes for Conversion from
Horizontal Adit Driving to Main Tunnel Driving
LI Jing
2008, 28(4): 476-478
DOI:
B
Abstract
(
1707
)
PDF
(1149KB) (
1069
)
Problems and Countermeasures for Concrete Construction of Pile
Foundations of Passengerdedicated Railway Works
LI Gangqiang
2008, 28(4): 479-482,493
DOI:
B
Abstract
(
1682
)
PDF
(692KB) (
1234
)
Construction Technology for Shieldbored Tunnel Crossing
underneath Adjacent Operating Metro Tunnel
ZHANG Kai, HE Ting
2008, 28(4): 483-488
DOI:
B
Abstract
(
1900
)
PDF
(1153KB) (
1138
)
Technology for Cutting Piles inside Tunnel in Active Underpinning of
Pile Foundations of Curvilinear Bridge
LI Chunjian, YANG Yong, LI Feng, DAI Xiaoyong
2008, 28(4): 489-493
DOI:
B
Abstract
(
1940
)
PDF
(892KB) (
844
)
Some Innovations in Construction Techniques
Adopted for Construction of No. 1 Dayaoshan Tunnel
SHI Qinxiong
2008, 28(4): 494-497
DOI:
B
Abstract
(
1788
)
PDF
(1589KB) (
881
)
Horizontal Jet Grouting for Mined Tunnel in Soft Rheologicplastic Ground
BAI Jumin
2008, 28(4): 498-500,513
DOI:
B
Abstract
(
2037
)
PDF
(1008KB) (
1334
)
Shield Equipment Disposition for Chengdu Metro
WANG Guoyi
2008, 28(4): 501-504
DOI:
B
Abstract
(
1706
)
PDF
(1446KB) (
1144
)
Study on Design of Bearings for Cutters of Hard Rock TBM
DONG Tianhong
2008, 28(4): 505-507
DOI:
B
Abstract
(
1677
)
PDF
(818KB) (
1041
)
Application of Excel VBA in Railway Project Management
GUO Guangxu
2008, 28(4): 508-510,516
DOI:
C
Abstract
(
2036
)
PDF
(942KB) (
1050
)
Comments on Human Resources Management of Construction Enterprises
LUO Jian
2008, 28(4): 511-513
DOI:
C
Abstract
(
1466
)
PDF
(335KB) (
933
)
Assuring Tunnel Construction Safety through Technical Activities
REN Weijie
2008, 28(4): 514-516
DOI:
C
Abstract
(
1864
)
PDF
(343KB) (
917
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat