Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2009, 29 (增刊1) Published: 15 April 2009
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
A Study on the Face Stability of the Fine Sand Layer Bored by S-366 Shield Machine at Chengdu Metro
SONG Xiu-Yuan, DIAO Xu-Wei
2009, 29(增刊1): 1-4
DOI:
A
Abstract
(
1782
)
PDF
(9513KB) (
760
)
A Study on the Improvement Wear Resistant Performance of Shield Machine Cutters
TU De-Feng, XIN Song-He, TANG Chi-Mei, WANG Zhi-You
2009, 29(增刊1): 5-8
DOI:
B
Abstract
(
1960
)
PDF
(9513KB) (
918
)
An Analysis on the Adaptability of the Cutter Head of Disc Cutter of Shield Machine to the Strata
YUAN Chao, TANG Chi-Mei, TU Li-Xin, ZHOU Yong
2009, 29(增刊1): 9-11
DOI:
B
Abstract
(
2221
)
PDF
(9513KB) (
703
)
Mechanism Study of the Eccentric Wear of Disc Hobbing of Shield Machine in Mixed Stratum
SONG Tian-Tian, DU Heng, XU Jing-Song
2009, 29(增刊1): 12-14
DOI:
A
Abstract
(
2364
)
PDF
(9513KB) (
1332
)
Characteristics and Model Selection Calculation of Pipe Segments Often Used in Metro Tunnel
ZONG Yan-Hai
2009, 29(增刊1): 15-18
DOI:
A
Abstract
(
2446
)
PDF
(9513KB) (
1177
)
Model Selection and Erection of Pipe Segment for Herrenk Shield Construction
LIN Jian-Beng
2009, 29(增刊1): 19-25
DOI:
B
Abstract
(
2059
)
PDF
(9513KB) (
1420
)
Construction Technology of Earth Pressure Balance Shield Machine Crossing a River
YANG Guan-Jing, DAI Wei
2009, 29(增刊1): 26-31
DOI:
B
Abstract
(
1906
)
PDF
(9513KB) (
1013
)
Stabilization and Drill Bit Replacement for Special Stratum of Upper Soft and Lower Hard Layers
HE Hua-Lin, WANG Feng-Ju
2009, 29(增刊1): 32-35
DOI:
B
Abstract
(
1934
)
PDF
(9513KB) (
870
)
Construction Technology of Shield Machine Crossing
beneath Railway Tracks at Water-rich Sandy Gravel Stratum
ZHANG Long-Guan, YANG Shu-Jiang
2009, 29(增刊1): 36-42
DOI:
B
Abstract
(
2185
)
PDF
(9513KB) (
874
)
Transportation within Tunnels over the Construction
of Long Shield Tunnel with Small Section
LIU Hun, ZHANG Beng, JIANG Chao
2009, 29(增刊1): 43-45
DOI:
B
Abstract
(
1910
)
PDF
(12987KB) (
1026
)
Tunneling Technology of Crossing beneath the Existing
Metro Lines by Shield Machine within Short Distance
XUE Jing-Pei, HE Gao
2009, 29(增刊1): 46-51
DOI:
B
Abstract
(
2838
)
PDF
(12987KB) (
782
)
Key Technology of Earth Pressure Balance Shield Construction
in Water-rich Sandy Gravel Stratum
ZHANG Long-Guan, YANG Shu-Jiang, GUO Jia-Qiang
2009, 29(增刊1): 52-56
DOI:
B
Abstract
(
2122
)
PDF
(12987KB) (
737
)
Application of Horizontal Deep-Hole Grouting Technology
in End Reinforcement in the Shield Construction of the Metro
GUO Hai
2009, 29(增刊1): 57-60
DOI:
B
Abstract
(
2109
)
PDF
(12987KB) (
744
)
Construction Technology of Earth Pressure Balance Shield Machine
Crossing through Karst Cave Section
DAI Wei, ZHOU Zhi
2009, 29(增刊1): 61-68
DOI:
B
Abstract
(
2139
)
PDF
(12987KB) (
765
)
Model Selection of Shield Machine for River-crossing Metro Tunnel
CHEN Shan-Dong
2009, 29(增刊1): 69-72
DOI:
B
Abstract
(
1846
)
PDF
(4034KB) (
905
)
Cutter Support Maintenance and Cutter Modification Technology of
Shield Machine under Atmospheric Pressure
TUN Qiang-Gong
2009, 29(增刊1): 73-77
DOI:
B
Abstract
(
2114
)
PDF
(4034KB) (
1037
)
Cutter Model Selection for Hankou-Fanhu Section of
the 1st Phase of Wuhan Metro Line 2
ZHOU Bao-Jun, CENG Wei-Hua, ZHOU Hong
2009, 29(增刊1): 78-81
DOI:
B
Abstract
(
1864
)
PDF
(4034KB) (
899
)
The Application of Centrifugal Oil Purifier in Shield Construction
HE Lun, JIANG Zi-Meng, SUN Jian-Min, LI Yi
2009, 29(增刊1): 82-83
DOI:
B
Abstract
(
1749
)
PDF
(10301KB) (
722
)
Analysis and Measures for the Wear of Shield Machine Cutters for
Chengdu Metro Line 1
LEI Mei-Mao, ZHOU Bao-Jun
2009, 29(增刊1): 84-87
DOI:
A
Abstract
(
2183
)
PDF
(10305KB) (
826
)
Maintenance and Management of Disc Hobbing
GU Zong-Hua
2009, 29(增刊1): 88-92
DOI:
B
Abstract
(
1824
)
PDF
(10301KB) (
1105
)
Application of “Four Standardizations&rdquo|in the Maintenance of Large-scale Slurry Shield Machine
LIU Xiao-Bei
2009, 29(增刊1): 93-95
DOI:
B
Abstract
(
2330
)
PDF
(10301KB) (
887
)
Primary Research on the Application of Radial Hole on the Shield Body of a Shield Machine
GAO Chen-Bin
2009, 29(增刊1): 96-97
DOI:
B
Abstract
(
1656
)
PDF
(10305KB) (
775
)
Application of the Rack in the Main Production of Shield Machine
MA Sheng-Yan
2009, 29(增刊1): 98-101
DOI:
B
Abstract
(
1764
)
PDF
(10301KB) (
864
)
Re-active Power Compensation of Temporary Facilities and Lighting of the Tunnel
LI Shun-Ta
2009, 29(增刊1): 102-105
DOI:
B
Abstract
(
1973
)
PDF
(10301KB) (
808
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat