Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2009, 29 (2) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Views on Engineering Feasibility and Key Technical Issues
of Construction of Taiwan Strait Tunnel
Sun Jun
2009, 29(2): 131-144
DOI:
A
Abstract
(
2478
)
PDF
(1830KB) (
1332
)
Development of Underwater Shieldbored Tunnels
YANG Wen-Wu
2009, 29(2): 145-151
DOI:
A
Abstract
(
2397
)
PDF
(3959KB) (
2964
)
Study on Longitudinal Deformation of RiverCrossing Shieldbored
Tunnel Caused by Riverbed Scouring and Siltation
ZHANG Jun, ZHANG Chixiang
2009, 29(2): 152-156
DOI:
A
Abstract
(
2183
)
PDF
(1105KB) (
1219
)
Discussion on New Tunnel Excavation Method Used in Soft Ground
DONG Shulian, HUANG Mingqi, FENG Chuandong
2009, 29(2): 157-161
DOI:
A
Abstract
(
1947
)
PDF
(1955KB) (
1410
)
Discussion on Slurry Circulation Technology of Slurry Shield Machine
CENG Chui-Gang
2009, 29(2): 162-165,193
DOI:
B
Abstract
(
1948
)
PDF
(1169KB) (
2544
)
An Overview on Construction and Research of Superlarge
Crosssection Tunnels with Low Heightspan Ratios
QU Haifeng
2009, 29(2): 166-171
DOI:
A
Abstract
(
2092
)
PDF
(880KB) (
1645
)
Comparative Analysis on Retaining Structure Deformation and Surrounding
Building Settlement Caused by Different Foundation Pit Construction
LIU Hongzhen
2009, 29(2): 172-175,184
DOI:
A
Abstract
(
2121
)
PDF
(2020KB) (
1278
)
Sand Flowing Experiment and Experiment Result Analysis:
Case Study on ShengwudaoDaxuecheng Immersed Tunnel
WANG Guanghui, LI Zhiguo, CHENG Xiaoming, SONG Yan
2009, 29(2): 176-180
DOI:
A
Abstract
(
2132
)
PDF
(1744KB) (
1147
)
Application of Standard Penetration Method in Test of
Early Strength of Shotcrete
KONG Xiaobing, FENG Jian
2009, 29(2): 181-184
DOI:
A
Abstract
(
1754
)
PDF
(525KB) (
1502
)
Numerical Simulation on Stability of Tunnel with Large Crosssection in
Process of Prereinforcement, Excavation and Support
ZHOU Jie, QI Taiyue, KUANG Wentao, LI Bin
2009, 29(2): 185-188,201
DOI:
A
Abstract
(
2190
)
PDF
(1203KB) (
1604
)
Application of Integrated Advance Geology Forecast
Technology in a Rivercrossing Tunnel
LV Qiaosen, LUO Xuedong,Ren Hao2
2009, 29(2): 189-193
DOI:
B
Abstract
(
2098
)
PDF
(1630KB) (
1224
)
Study on Design Scheme of Vertical Shafts of Metro Works
SHENJie
2009, 29(2): 194-197,205
DOI:
A
Abstract
(
1705
)
PDF
(1858KB) (
1435
)
Design of Architectural Scheme of Taoyuan Station on
No.1 Line of Shenzhen Metro
LI Long
2009, 29(2): 198-201
DOI:
B
Abstract
(
2010
)
PDF
(1466KB) (
1283
)
Dynamic Control Technology for Building Settlement Caused by
Construction of Shallowburied and Largespanned Urban Tunnels
ZHAO Wei,HUANG Ye
2009, 29(2): 202-205
DOI:
B
Abstract
(
2176
)
PDF
(845KB) (
995
)
Construction Ventilation Technology for Tunnels in High
Altitude and Low Atmospheric Pressure Area
ZHAO Junxi
2009, 29(2): 206-207,231
DOI:
B
Abstract
(
2176
)
PDF
(702KB) (
1636
)
Application of ADECORS Approach in Design and
Construction of Tunnels: Case Study on Tartaiguille
Tunnel on TGV Mediterranean Line (From Lyon to Marseilles)
Zhai Jinying,TANG Jing
2009, 29(2): 208-215
DOI:
B
Abstract
(
2141
)
PDF
(5717KB) (
1633
)
Replacement and Excavation of High Arch Dam in Weak Fractured Zone
HE Zeshan, LIU Shuhui
2009, 29(2): 216-221
DOI:
B
Abstract
(
1852
)
PDF
(1469KB) (
1060
)
Technology of Treatment of Pile Foundations Intruding into Shield
Tunnel by means of Manualcut Borehole Method
DU Chuangdong
2009, 29(2): 222-226
DOI:
B
Abstract
(
1893
)
PDF
(2217KB) (
1124
)
Key Technology to Control Serious Deformations of Soft Rock Stratum with
High Ground Stress: Case Study on Baozhen Tunnel
WANG Shuishan
2009, 29(2): 227-231
DOI:
B
Abstract
(
2353
)
PDF
(401KB) (
985
)
Blasting Vibration Control Technology for Closelyspaced
Tunnels with Superlarge Crosssections
WU Chaofan
2009, 29(2): 232-234,238
DOI:
B
Abstract
(
1994
)
PDF
(1136KB) (
1202
)
Watersealing Radial Grouting Technology Applied in
Construction of Xiangshan Tunnel
HUANG Zhijie
2009, 29(2): 235-238
DOI:
B
Abstract
(
2263
)
PDF
(694KB) (
1298
)
CPIII Control Points Survey Technology for Ballastless
Track of HighSpeed Railway
LENG Daoyuan
2009, 29(2): 239-242,251
DOI:
B
Abstract
(
2114
)
PDF
(1058KB) (
2490
)
Analysis on Collapse Mechanisms and Treatment Scheme of Laohuzui landslide
on DujiangyanWenchuan Highway Caused by Wenchuan Earthquake
ZHAO Sheng, ZHENG Mingxin, WANG Quancai
2009, 29(2): 243-245,251
DOI:
A
Abstract
(
1532
)
PDF
(818KB) (
1245
)
Technique for Doubleshield TBM Design and Construction
YU Xuping
2009, 29(2): 246-248
DOI:
B
Abstract
(
2062
)
PDF
(306KB) (
950
)
Development of New Compressing Pump Type Wet Shotcreting Machine
GE Hejian
2009, 29(2): 249-251
DOI:
B
Abstract
(
1694
)
PDF
(629KB) (
855
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat