Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (2) Published: 20 February 2013
Previous Issue
Next Issue
Back issue
Risks in Tunneling by TBM and Their Countermeasures
CHEN Kui, FENG Huanhuan
2013, 33(2): 91-97
DOI:
10.3973/j.issn.1672-741X.2013.02.001
Abstract
(
3126
)
PDF
(1991KB) (
1426
)
Digital 3D Modeling Analysis on Tunnels
SONG Yi, GUO Nian’gen, LI Junbo, LI Fengrong, WAN Heping
2013, 33(2): 98-102
DOI:
10.3973/j.issn.1672-741X.2013.02.002
Abstract
(
2209
)
PDF
(2307KB) (
1378
)
Study on Influence of Vibration Induced by Metro Trains on Construction Safety of Nearby Underground Works
LI Xiaolin, TAO Lianjin
2013, 33(2): 103-109
DOI:
10.3973/j.issn.1672-741X.2013.02.003
Abstract
(
3093
)
PDF
(1556KB) (
775
)
Application of Distributed Optical Fiber Sensing Technology Based on Brillouin Optical Time Domain Reflectometer in Soil Tunnel
WANG Wan, GAN Kunrong, SHI Bin, ZHANG Dan
2013, 33(2): 110-115
DOI:
10.3973/j.issn.1672-741X.2013.02.004
Abstract
(
3424
)
PDF
(1034KB) (
1050
)
Ground Stress Characteristics and Their Influence on Tunnel Deformation: Case Study on Muzhailing Tunnel
ZHANG Wenxin, ZHANG Jianguo, TANG Shaowu, LIU Zhiqiang, JIANG Yongqiang, GAO Pan, LI Yanzong
2013, 33(2): 116-121
DOI:
10.3973/j.issn.1672-741X.2013.02.005
Abstract
(
3240
)
PDF
(2031KB) (
1277
)
Application of Geological Prediction Technologies in Construction of Largediameter Rivercrossing Shieldbored Tunnels
SONG Mingfu, LIU Hongyue
2013, 33(2): 122-128
DOI:
10.3973/j.issn.1672-741X.2013.02.006
Abstract
(
3191
)
PDF
(1091KB) (
983
)
Safety Guarantee Measures for Intermediate Floor Slab of Metro Station when TBM Passing
TIAN Haowen
2013, 33(2): 129-134
DOI:
10.3973/j.issn.1672-741X.2013.02.007
Abstract
(
3328
)
PDF
(1373KB) (
846
)
Study on Safety Degree of Primary Support Structure of Tunnel in Sandy Rock Mass on LanzhouChongqing Highspeed Railway
ZHU Dehua,LIANG Bin,YU Shaohui,YANG Chaoshuai
2013, 33(2): 135-141
DOI:
10.3973/j.issn.1672-741X.2013.02.008
Abstract
(
3537
)
PDF
(5318KB) (
734
)
Calculation of Water Inflow of Foundation Pits Considering Water Insulation Effect of Retaining Structures
LIU Qingfang, LIU Jiqiang,TAN Peilian, LI Yuanhai, LIN Zhibin
2013, 33(2): 142-146
DOI:
10.3973/j.issn.1672-741X.2013.02.009
Abstract
(
3266
)
PDF
(1075KB) (
1267
)
Analysis on Technical Difficulties in Construction of Yangtze Rivercrossing Tunnel on Weisan Road in Nanjing
ZHANG Shilong
2013, 33(2): 147-150
DOI:
10.3973/j.issn.1672-741X.2013.02.010
Abstract
(
5226
)
PDF
(1629KB) (
1069
)
Comprehensive Construction Technologies for Retaining Piles Penetrating through Existing Structures
DENG Xun
2013, 33(2): 151-155
DOI:
10.3973/j.issn.1672-741X.2013.02.011
Abstract
(
2861
)
PDF
(1293KB) (
839
)
Construction Technology of Diaphragm Walls Inserted into Rocks
ZHAO Kanglin, WANG Guangwei, LI Zhijun, ZHOU Zhaoyong
2013, 33(2): 156-159
DOI:
10.3973/j.issn.1672-741X.2013.02.012
Abstract
(
2980
)
PDF
(584KB) (
1180
)
Analysis on Application of Open TBM in No. 6 Line of Chongqing MRT Project
ZHANG Hongyao, LIU Dongliang
2013, 33(2): 160-164
DOI:
10.3973/j.issn.1672-741X.2013.02.013
Abstract
(
3232
)
PDF
(840KB) (
1145
)
Design of Tail Sealing System Software of EPB Shield based on S7-400H
ZHANG Hepei, CHEN Kui, LI Fengyuan, WANG Zhufeng, WANG Jiping
2013, 33(2): 165-168
DOI:
10.3973/j.issn.1672-741X.2013.02.014
Abstract
(
5577
)
PDF
(855KB) (
942
)
Development of Design System of Cutter Head of Shield Machine
HAN Weifeng, LI Fengyuan, CHEN Qiwei
2013, 33(2): 169-172
DOI:
10.3973/j.issn.1672-741X.2013.02.015
Abstract
(
4345
)
PDF
(1166KB) (
1176
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat