Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (3) Published: 20 March 2013
Previous Issue
Next Issue
Back issue
Research on Construction Methods for Large Crosssection Loess Tunnels
SHI Lei, HOU Xiaojun, WU Jinguang
2013, 33(3): 173-178
DOI:
10.3973/j.issn.1672-741X.2013.03.001
Abstract
(
3194
)
PDF
(1095KB) (
947
)
Design of Client Software of Temperature Remotemonitoring System Based on Android Program
ZHAO Junxi, GOU Hongsong, YANG Lixin
2013, 33(3): 179-182
DOI:
10.3973/j.issn.1672-741X.2013.03.002
Abstract
(
2972
)
PDF
(682KB) (
1041
)
Case Study on High Ground Stress Behavior and Rock Burst Prediction of Tunnels
ZHANG Jianzhong
2013, 33(3): 183-189
DOI:
10.3973/j.issn.1672-741X.2013.03.003
Abstract
(
3141
)
PDF
(646KB) (
1015
)
Research on Technologies for Design and Construction of Reservation of Piles and Columns of Interchange Nodes of Interchange Stations Constructed by Coverandcut Method
YANG Shidong, LIU Qingfang
2013, 33(3): 190-196
DOI:
10.3973/j.issn.1672-741X.2013.03.004
Abstract
(
2745
)
PDF
(1567KB) (
772
)
Contrast Research on Application of 3dimensional Laser Scanning Technology and Digital Imaging Geology Catalog System in Acquisition of Rock Mass Information of Tunnels
SONG Yan, WANG Xiaolin, LI Yang, LI Rui
2013, 33(3): 197-202
DOI:
10.3973/j.issn.1672-741X.2013.03.005
Abstract
(
3665
)
PDF
(1207KB) (
952
)
Research on Unfavorable Geological Condition Prediction and Rock Mass Deformation In Tunnel Section with Water Inflow
FANG Jianhua, GAN Penglu, LIN Tingsong
2013, 33(3): 203-208
DOI:
10.3973/j.issn.1672-741X.2013.03.006
Abstract
(
4256
)
PDF
(1812KB) (
941
)
Static and Dynamic Response of Old Clay under Unloading
CHEN Cong, ZHENG Xinding, LIU Zhaogang, JIAN Qiwei, ZHOU Jian, TAO Wentao, HOU Yunliang
2013, 33(3): 209-214
DOI:
10.3973/j.issn.1672-741X.2013.03.007
Abstract
(
2456
)
PDF
(1038KB) (
914
)
Application of Cross Structures in Neighboring Foundation Pits
CHEN Haijun,HAO Guopeng
2013, 33(3): 215-219
DOI:
10.3973/j.issn.1672-741X.2013.03.008
Abstract
(
3348
)
PDF
(1315KB) (
1138
)
Discussion on Tunnel Portal Design Principles: Analysis on Relationship Between Access Road Construction and Tunnel Portal Design
ZHAO Baiwen
2013, 33(3): 220-223
DOI:
10.3973/j.issn.1672-741X.2013.03.009
Abstract
(
2514
)
PDF
(1051KB) (
1131
)
Pretreatment of Bedrock Intruding into Shield Tunneling Scope by means of Blasting Hole Drilling from Ground Surface and Blasting Underground
DING Rui, LU Yaobang, DANG Rujiao, LI Yang
2013, 33(3): 224-230
DOI:
10.3973/j.issn.1672-741X.2013.03.010
Abstract
(
2879
)
PDF
(2016KB) (
889
)
Construction Technology for Fork Section of Yingpanlu Xiangjiang River Crossing Tunnel in Changsha, China
JING Yongjun, FAN Zhi, OUYANG Gangjie, CHEN Changqiang, XU Yumin
2013, 33(3): 231-236
DOI:
10.3973/j.issn.1672-741X.2013.03.011
Abstract
(
2985
)
PDF
(1299KB) (
923
)
Application of EL Beam Automatic Monitoring System in Safety Protection Monitoring of Metro Works
ZHAO Taidong
2013, 33(3): 237-241
DOI:
10.3973/j.issn.1672-741X.2013.03.012
Abstract
(
3296
)
PDF
(871KB) (
981
)
Cause Analysis on and Prevention of Water Seepages during Construction of Deep Foundation Pits of Metro Works in Urban Areas
ZHAO Yunfei, WANG Xiaolin
2013, 33(3): 242-246
DOI:
10.3973/j.issn.1672-741X.2013.03.013
Abstract
(
3164
)
PDF
(934KB) (
1018
)
Technology for Methane Releasing in Shield Tunneling Through Qiantang River Formation: Case Study on Line 1 of Hangzhou Metro
XU Guoqing, YUE Fengtian, WANG Hongqi, ZHANG Ronghui
2013, 33(3): 247-251
DOI:
10.3973/j.issn.1672-741X.2013.03.014
Abstract
(
2035
)
PDF
(1820KB) (
1038
)
Repairing of Seal System of Main Bearing of TBM in Tunnel
JIA Feng
2013, 33(3): 252-258
DOI:
10.3973/j.issn.1672-741X.2013.03.015
Abstract
(
4667
)
PDF
(1369KB) (
1505
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat