• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2014, Vol. 34 ›› Issue (12): 1113-1125.DOI: 10.3973/j.issn.1672-741X.2014.12.001

• 研究与探索 •    下一篇

大型钢筋混凝土地下结构不设伸缩缝研究与实践——深圳福田综合交通枢纽取消伸缩缝案例分析

刘卡丁   

  1. (深圳市地铁集团有限公司, 广东 深圳 518026)
  • 收稿日期:2014-07-20 出版日期:2014-12-20 发布日期:2014-12-17
  • 作者简介:刘卡丁(1957—),男,重庆人,1982年毕业于西南交通大学,隧道及地下铁道专业,教授级高级工程师,博士生导师。现任深圳地铁集团有限公司首席规划师,享受国务院特殊津贴专家。主要从事城市轨道交通的规划、设计、科研与建设管理等工作。

Study on and Execution of Largescale Underground Reinforced Concrete Structure without Expansion Joints: Case Study on Futian Underground Comprehensive Transportation Hub

LIU Kading   

  1. (Shenzhen Metro Corporation, Shenzhen 518026, Guangdong, China)
  • Received:2014-07-20 Online:2014-12-20 Published:2014-12-17

摘要:

深圳福田地下综合交通枢纽具有超长、超厚、长高比大及施工周期长等特点,建设期间承受较大的温度收缩应力和干燥收缩应力。若设计伸缩缝,则会因为较多的伸缩缝对建筑外观、结构安全、防水质量、施工及耐久性产生不利影响。结合理论分析、设计计算等研究该工程不设永久伸缩缝的可行性。同时针对在不设永久伸缩缝的条件下,以控制主体结构不出现有害裂缝为目标,对工程结构形式、抗裂材料、施工要求、现场监测以及裂缝处理预案进行研究,提出了成套的技术方案。经过实践证明: 该工程在按照设计的抗裂结构形式、材料及施工要求等条件下,不设永久伸缩缝可以满足结构主体的抗裂要求。

关键词: 深圳福田地下综合交通枢纽, 地下车站, 伸缩缝, 大体积混凝土, 裂缝, 抗裂措施, 监测, 施工连接缝, 膨胀加强带, 配筋, 抗裂材料

Abstract:

Due to the extremely long length, great thickness, large length/height ratio and long construction period, Futian underground comprehensive transportation hub in Shenzhen has to suffer large temperatureinduced contraction stress and dryinduced contraction stress during the construction. If expansion joints are installed, the appearance, structural safety, waterproofing quality, construction and durability of the structure will be affected. In this paper, the feasibility that no permanent expansion joints are installed for the project is studied by means of theoretical analysis and design calculation. Furthermore, the structural types, anticracking materials, construction requirements, site monitoring and crack countermeasures are studied so as to avoid harmful cracks of the main structure of the project under the condition of no permanent expansion joints.In the end,a serise of technical program is proposed. The construction practice shows that the anticracking requirement of the main structure of the project can be met when no permanent expansion joints are installed, provided that the project is constructed according to the designed anticracking structural types, materials and construction requirements.

Key words: Futian underground comprehensive transportation hub, underground station, expansion joint, mass concrete, crack, anticracking technology, monitoring, construction joint, expansion strengthening section, steel bar arrangement, anticracking material

中图分类号: