[1] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[2] |
HAN Xiaoliang.
Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing
[J]. Tunnel Construction, 2019, 39(S2): 393-397.
|
[3] |
SONG Tiantian, LI Hongbo, CHEN Gang.
Problems and Countermeasures for Doubleshield TBM Applied in Shenzhen Metro
[J]. Tunnel Construction, 2019, 39(6): 998-1004.
|
[4] |
LIU Yunjun, LI Huayun, HUANG Dan.
Laws of Building Settlement Caused by Single Shield TBM Tunnel Construction in Composite Ground
[J]. Tunnel Construction, 2019, 39(4): 594-600.
|
[5] |
ZHOU Huagui, WANG Li.
Study of Plan, Crosssectional and Longitudinal Profile Design Schemes for Sea Water Section of Su′ai Tunnel in Shantou
[J]. Tunnel Construction, 2018, 38(7): 1189-1195.
|
[6] |
CHEN Xuwen, HUANG Lei, ZOU Yilun.
Rapid Construction Technology of Flexible Support for Rockburst Tunnel
[J]. Tunnel Construction, 2018, 38(7): 1212-1219.
|
[7] |
XU Wanghao, TAO Liming, XU Chen, FANG Yong, ZHANG Rui, TANG Xie.
Research on Rock Burst of Deep Hard Rock Tunnel Based on Elastic Strain Energy
[J]. Tunnel Construction, 2018, 38(11): 1822-1829.
|
[8] |
NING Xiangke, JIANG Qiao, TIAN Peng.
Application of Domestic Doubleshield TBM to Construction of Lanzhou Water Source Project
[J]. Tunnel Construction, 2017, 37(S1): 149-154.
|
[9] |
HU Qingyou.
Construction Organization and Safety Control Technology for Vertical Shaft
[J]. Tunnel Construction, 2017, 37(S1): 163-167.
|
[10] |
LIU Jiao.
Discussion on Design of Cutterhead of Horseshoeshaped Tunnel Boring Machine
[J]. Tunnel Construction, 2017, 37(S1): 204-211.
|
[11] |
DU Lijie.
Progresses, Challenges and Countermeasures for TBM Construction Technology in China
[J]. Tunnel Construction, 2017, 37(9): 1063-1075.
|
[12] |
HOU Kaiwen, WANG Chong, JIANG Jie, YANG Gangfeng, OU Xiaoduo, TANG Yingchun.
Type Selection Design and Adaptability Analysis of Shield Used in Line No. 2 of Nanning Metro
[J]. Tunnel Construction, 2017, 37(8): 1037-1045.
|
[13] |
WEI Yusheng.
Research on Key Technologies for Scheme Design of Su’ai Shield Tunnel in Shantou
[J]. Tunnel Construction, 2017, 37(2): 200-206.
|
[14] |
SUN Zhenchuan, YOU Jinhu.
Radialgrouting Waterstop Technology and Its Application to Highpressure Waterrich Hard Rock Tunnel
[J]. Tunnel Construction, 2017, 37(11): 1455-1461.
|
[15] |
HE fei, ZENG Xiangsheng, QI Zhichong.
Application of Largediameter Hard Rock Tunnel Boring Machine (TBM) to TBM3 Section of No. 4 Bid of Songhua River Water Conveyance Project in Middle Jilin Province
[J]. Tunnel Construction, 2016, 36(8): 1016-1022.
|