ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2016, Vol. 36 ›› Issue (12): 1523-1530.DOI: 10.3973/j.issn.1672-741X.2016.12.018
Previous Articles Next Articles
CHEN Kui, YANG Yandong
Received:
Revised:
Online:
Published:
Abstract:
The development of TBM with high adaptability to complex geological conditions of Gaoligongshan Tunnel is very important. The main bad geological conditions of Gaoligongshan Tunnel are summarized; the construction risks, i.e. TBM jamming at softweak broken section and large deformation section, rockburst of tunnel face with high ground stress and behind shield, support failure induced by convergence squeezing deformation of surrounding rock, water gushing with high pressure and high temperature, are analyzed. Furthermore, design scheme of TBM with high adaptability are proposed, including support system design, cutting tool and cutterhead design, water gushing treatment design, high ground heat treatment design and other related design. The study results can provide reference for design and selection of equipment manufacturing of TBM with high adaptability to Gaoligongshan Tunnel.
Key words: Gaoligongshan Tunnel, open TBM, construction risk, adaptability design
CLC Number:
U 455.3
CHEN Kui, YANG Yandong. Discussion on Design of TBM with High Adaptability to Gaoligongshan Tunnel[J]. Tunnel Construction, 2016, 36(12): 1523-1530.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2016.12.018
http://www.suidaojs.com/EN/Y2016/V36/I12/1523