ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2011, Vol. 31 ›› Issue (3): 354-358.
• wenzhang • Previous Articles Next Articles
TANG Xiangao1,LI Nan2,ZHAO Baohua3
Received:
Revised:
Online:
Published:
Abstract:
Beijing underground rail transit work, which is located in the downtown area of Beijing, mainly crosses waterrich and sandy cobble stratum. The construction of the project is difficult and full of risks. An integrated allround 3D realtime construction information feedback system is adopted by using videolized information feedback system, which consists of videolized warning system, videolized monitoring system, entrance guard system, shield boring parameter control system and information feedback system. Realtime, accurate and videolized information feed back is achieved and the construction safety is guaranteed.
Key words: rail transit, Beijing underground rail transit work, videolized information feedback system, videolized warning, videolized monitoring, entrance guard system, shield boring parameter control system
SHANG Xian-Gao, LI Na, Diao-Bao-Hua. Application of Videolized Information Feedback System in Construction of Rail Transit Works[J]. Tunnel Construction, 2011, 31(3): 354-358.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I3/354
Research on Dynamic Benchmark Rate of Return of PPP Rail Transit Project