Abstract: The reasons, targets and principles of the optimization of the construction schemes of tunnels are presented. The optimization of the main structure, adit, working environment, organization management and cost management of tunnels are discussed. Due to the optimizations, maximum economic and social benefits are achieved.
Key words: mountaincrossing tunnel, main structure, adit, construction scheme optimization
CHE Dabing, CHEN Aihong. Optimization of Construction Scheme of Mountaincrossing Tunnels[J]. Tunnel Construction, 2012, 32(3): 388-392.