Consolidation of Intermediate Slab of Metro Station to Ensure Successful Construction of Stacked Tunnel: Case Study on Nanluoguxiang Station of Line 8 of Beijing Metro
WANG Gang
(Tunnel Engineering Co., Ltd., China Railway 14th Bureau Group, Jinan 250002, Shandong, China)
WANG Gang. Consolidation of Intermediate Slab of Metro Station to Ensure Successful Construction of Stacked Tunnel: Case Study on Nanluoguxiang Station of Line 8 of Beijing Metro[J]. Tunnel Construction, 2013, 33(12): 1059-1063.