ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2018, Vol. 38 ›› Issue (12): 1927-1934.DOI: 10.3973/j.issn.2096-4498.2018.12.002

Previous Articles     Next Articles

Study of Admission Pricing of PPP Project of Underground Utility Tunnel Based on Bilevel Programming Model

WEI Haimin, LI Yihao*   

  1. (College of Management, Xi′an University of Architecture & Technology, Xi′an 710055, Shaanxi, China)
  • Received:2018-03-19 Revised:2018-06-03 Online:2018-12-20 Published:2019-01-03

Abstract:

The admission of publicprivatepartnership (PPP) project of underground utility tunnel is difficult to price. Hence, based on the admission price control requirement of underground utility tunnel at present stage and the main and subordinate hierarchical structure characteristics of every participant in the price decisionmaking process, the bilevel programming model is adopted; and then the government is regarded as the upper level of price decisionmaking, and the social capitals and pipeline suppliers are regarded as the lower level; a bilevel programming model is established to maximize the social welfare, prospected profit and reserved effect and to make a rational pricing. The applicability of the abovementioned model is verified in PPP project of underground utility tunnel in Yan′an. Finally, some rational suggestions such as strengthening the toplevel design, strengthening the price supervision and establishing dynamic price adjustment mechanism are put forward.

Key words: underground utility tunnel, publicprivatepartnership (PPP) mode, admission pricing, bilevel programming model