Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2005, 25 (6) Published: 20 December 2005
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Trend of Industrialization of Tunnels and Underground Works
GUO Shan-Yun
2005, 25(6): 1-3
Abstract
(
1646
)
PDF
(349KB) (
1216
)
Explicit Difference Analysis on Impact on Buildings
Imposed by Excavation of Foundation Pits
DING Dui, FAN Feng, JIAO Cang, XU Cheng-Jia, ZHANG Wen-Jiang
2005, 25(6): 4-8
Abstract
(
2055
)
PDF
(794KB) (
1223
)
Nonlinear Analysis of Underground Excavation and Support
LIANG Xiao-Dan
2005, 25(6): 9-10,24
Abstract
(
1411
)
PDF
(507KB) (
892
)
Research on and Application of Natural Ventilation
Mode in South Section of Chengdu Metro
CHEN Zhong, XU Bei
2005, 25(6): 11-14,24
Abstract
(
1642
)
PDF
(986KB) (
1311
)
Analysis on Designs of Comprehensive Pipelines of Metro Stations
HU Jian-Guo, CHEN Hong
2005, 25(6): 15-16,24
Abstract
(
1469
)
PDF
(517KB) (
1063
)
Design and Construction of Arcade Highway Tunnel—Erputang Tunnel
YANG Jia-Xiong
2005, 25(6): 17-19,46
Abstract
(
1756
)
PDF
(658KB) (
871
)
Discussions on Construction Technology of Tunnels in Squeezing
and Fractured Ground in High Groundstress Area
DIAO Yun-Chen, LIU Jiang
2005, 25(6): 20-24
Abstract
(
2046
)
PDF
(545KB) (
998
)
The Construction Technology and the Main Equipments
selection of Insitu Placed Wall
JIAO Lei, JIANG Zhong-Quan
2005, 25(6): 25-27,31
Abstract
(
1585
)
PDF
(659KB) (
1067
)
Water Inrush Prevention and Control Technology
and Its Application in a Highway Tunnel
LI Dan, WANG Quan-Qing, SUN Guo-Qiang
2005, 25(6): 28-31
Abstract
(
1870
)
PDF
(658KB) (
759
)
Countermeasures for Water Inflow into No. 7
Inclined Shaft of |Wushaoling Tunnel
DONG Qi-Yin
2005, 25(6): 32-34,41
Abstract
(
1820
)
PDF
(621KB) (
1025
)
Application of GPS Technology in Repetition Survey of
First Class Control Network in Nanjing Metro
WANG Jian
2005, 25(6): 35-37
Abstract
(
1584
)
PDF
(314KB) (
1223
)
Application of Advance Geological Forecasting in
Construction of Fangdoushan Tunnel
WEN Quan
2005, 25(6): 38-41
Abstract
(
1723
)
PDF
(417KB) (
964
)
Comparison of Different Tunnel Lining Construction Schemes
GU Wen-Wu
2005, 25(6): 42-43,46
Abstract
(
1630
)
PDF
(477KB) (
1189
)
Discussion on Construction Technology of Deepburied Soft Section of Entrance Portion of Yuanliangshan Tunnel
XU Hong-Luo
2005, 25(6): 44-46
Abstract
(
1583
)
PDF
(455KB) (
880
)
Construction Technology of No.2 Karst Cave
Section of Yuanliangshan Tunnel
CHEN Jian
2005, 25(6): 47-49,56
Abstract
(
1667
)
PDF
(722KB) (
1097
)
Construction Monitoring and Measurement of Underground Works
WANG Jing
2005, 25(6): 50-52,56
Abstract
(
1640
)
PDF
(769KB) (
890
)
Example of Development of Cutterhead of Shield Machine
LI Jian-Bin, HE Wu-Lian
2005, 25(6): 53-56
Abstract
(
1567
)
PDF
(748KB) (
1309
)
Working Principle of Control System of Fluid Conveying Systems of EPB Shield Machines
HE Wu-Lian
2005, 25(6): 57-59,66
Abstract
(
1429
)
PDF
(909KB) (
1733
)
Analysis on Situations and Problems of Enterprise
Budget Management in China
LI Yan
2005, 25(6): 60-62,66
Abstract
(
1156
)
PDF
(546KB) (
1199
)
Discussion on Contract Management of Irrigation Projects
DAN Li-Xin, CHEN De-Jiang, TUN Ji-Cheng
2005, 25(6): 63-66
Abstract
(
1551
)
PDF
(347KB) (
985
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat