Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2005, 25 (5) Published: 20 October 2005
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Discussion on Key Technologies and Countermeasures in
Construction of Submarine Tunnel by Mining Method
LIU Qiao-Wei
2005, 25(5): 1-3,27
Abstract
(
1932
)
PDF
(636KB) (
791
)
Comments on Waterproofing System Adopted in XuanwuLake Tunnel in Nanjing
CHEN Feng-Rong, YAN Chao-Chao
2005, 25(5): 4-5,27
Abstract
(
1947
)
PDF
(609KB) (
1075
)
Comparison of and Analysis on Different Working
Procedures of CRD Method
Liu-Hui-Min, DIAO Ru, TUN Bei
2005, 25(5): 6-10,14
Abstract
(
1703
)
PDF
(1414KB) (
1349
)
Research on Application of Automatic Guidance System in Shield Tunnelling
LV Guo-Ling, HUANG Wei-Ran, LONG Gong-Jun
2005, 25(5): 11-14
Abstract
(
1668
)
PDF
(506KB) (
1056
)
Analysis on Effect of Overburden and Jack Thrust Forces
on Deformation of Ground Surface
CHEN Zhong, JIAO Cang
2005, 25(5): 15-18
Abstract
(
1834
)
PDF
(490KB) (
1237
)
Analysis on Structural calculations of Linjngs of
Shallowburied Doublearch Tunnels in soft Ground
BI Man-Li
2005, 25(5): 19-22
Abstract
(
1933
)
PDF
(534KB) (
1004
)
Ventilation Design of Wuhan Yangtze River Tunnel
GUAN Hong-Gao
2005, 25(5): 23-27
Abstract
(
1675
)
PDF
(490KB) (
1327
)
nalysis |and |Study on |Gauge |Survey of An Existing |Tunnel
JIANG Qiang-Bin
2005, 25(5): 28-30,34
Abstract
(
1773
)
PDF
(725KB) (
1020
)
Design of Final Onshore Joints of
LuntouShengwudao Immersed Tube Tunnel
YANG Shi-Dong, HE Wei-Guo, SONG Cheng-Cheng
2005, 25(5): 31-34
Abstract
(
1882
)
PDF
(1684KB) (
1010
)
Design and Construction of Retaining System of Xiangxing
Road Station of Nanjing Metro
ZHENG Da-Rong, ZHANG Cun, ZHANG Hui
2005, 25(5): 35-37,44
Abstract
(
2113
)
PDF
(578KB) (
874
)
Construction Project Optimization of Yulingguan
Tunnel in Hangyu Expressway
YANG Feng, TU Jian-En
2005, 25(5): 38-41
Abstract
(
1820
)
PDF
(734KB) (
905
)
Discussion on Quality Defects and Countermeasures
of Bored Pile Construction
ZHANG Hui-Jun
2005, 25(5): 42-44
Abstract
(
1762
)
PDF
(333KB) (
1317
)
Treatment of Rockmass Slippage at Exit Portal of 3track
Dabanxi Tunnel on Yuhuai Railway
XU Zhi-Yong
2005, 25(5): 45-48
Abstract
(
1922
)
PDF
(609KB) (
826
)
Renovating Technology of Lining Leakage
at Waterrich Sector of Karst Tunnel
JU Chong, LI Chi-Guo
2005, 25(5): 49-52,70
Abstract
(
1629
)
PDF
(768KB) (
806
)
Construction Technique of Reinforcement of Soft Ground by Vibratory Impulsed Rubble Piles
GUO Qun
2005, 25(5): 53-54,64
Abstract
(
1731
)
PDF
(567KB) (
1702
)
Application of Vacuumassisted Grouting in Prestressed Concrete Structures
LI Li-Jun, JIA Fu-Kui
2005, 25(5): 55-57
Abstract
(
1467
)
PDF
(365KB) (
1031
)
Machinery Matching Technology of Highgrade
Bituminous Concrete Pavement Construction
BANG Yu-Min, WANG Dian-Jie
2005, 25(5): 58-60
Abstract
(
1535
)
PDF
(332KB) (
829
)
Construction Ventilation Techique Applied in Datai Vertical Shaft of Wushaoling Tunnel
LI Yong-Sheng, LUO Ti-Bei
2005, 25(5): 61-64
Abstract
(
1671
)
PDF
(592KB) (
1192
)
Discussion on Construction Survey of Metro Shield Tunnel
LV Hong-Quan
2005, 25(5): 65-67,75
Abstract
(
1951
)
PDF
(715KB) (
1317
)
Discussion on Construction Setting-out Survey of Railway Plane Curves
DI Zhi-Gang
2005, 25(5): 68-70
Abstract
(
1288
)
PDF
(416KB) (
1033
)
Search into Construction Enterprise's Material Control Auditing Method
ZHOU Xiao-Gong
2005, 25(5): 71-72
Abstract
(
1520
)
PDF
(287KB) (
1005
)
Discussion on Main Risk Contract Clauses of
CenxiWuzhou Expressway BOT Project
CHEN Guo-Rong
2005, 25(5): 73-75
Abstract
(
1618
)
PDF
(342KB) (
1378
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat