Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (1) Published: 20 February 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Basic Design Principle of Passenger Dedicated Railway Tunnels
WANG Meng-Shu
2006, 26(1): 1-1
Abstract
(
906
)
PDF
(220KB) (
990
)
New Trend of Insurance for Tunnel Projects
MAO Ru
2006, 26(1): 2-3
DOI:
B
Abstract
(
1134
)
PDF
(301KB) (
911
)
Cultural Element: Source Power for Sustainable
Development of Enterprises
GUO Shan-Yun
2006, 26(1): 4-5
Abstract
(
1130
)
PDF
(293KB) (
748
)
Connectivity Characteristics of Karst Water Gushing a Railway Tunnel
LIU Qiao-Wei, ZHANG Min-Qiang
2006, 26(1): 6-9
DOI:
A
Abstract
(
1829
)
PDF
(805KB) (
840
)
Analysis on and Control of Settlement in Metro Construction
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng
2006, 26(1): 10-13
DOI:
A
Abstract
(
1925
)
PDF
(634KB) (
1057
)
Analysis on Monitoring Results of Opencut Metro Stations
Reinforced by Soil Nails and Anchoring Cables
WANG Wen-Tong, ZHANG Xiang-Duo
2006, 26(1): 14-17
DOI:
A
Abstract
(
1699
)
PDF
(454KB) (
831
)
Analysis on Ground Surface Deformation Induced by
Undercutting under Shallow Overburden in Tianjin Metro
GU Jian-Bei, JIAO Cang, FAN Feng
2006, 26(1): 18-20,24
DOI:
A
Abstract
(
1935
)
PDF
(685KB) (
1060
)
Analysis on Impact of Construction of Shallowburied Soft Ground
Tunnels on Deformations of Ground Surface and Surrounding Rock Mass
WANG Xian-Chun, PENG Ji-Dong, ZHANG Hong-Bo
2006, 26(1): 21-24
DOI:
A
Abstract
(
1926
)
PDF
(386KB) (
885
)
Analysis on Application of Isolation Piles in Construction
of Mined Tunnels Underneath Existing Buildings
GU Chi-Chao
2006, 26(1): 25-26,101
DOI:
A
Abstract
(
1176
)
PDF
(692KB) (
1066
)
Discussions on GPS Height Transformation in Mountain Area
GENG Ting-Song, CAO Jia-Huai, ZHANG Tong-Gang
2006, 26(1): 27-31
DOI:
A
Abstract
(
1208
)
PDF
(579KB) (
1071
)
Application of EXCEL in Calculation of Coordinates
of Stakes on Centerline of Alignment
ZHANG Bao-Li, XUE Zhi-Qi, YANG Shu-Cheng
2006, 26(1): 32-34
DOI:
B
Abstract
(
1696
)
PDF
(265KB) (
1522
)
Construction Technology of Anchoring Cables in Waterrich Silty
Sand Layers: Case Study of Jiefang Road Stretching Works in Hangzhou
GUO Da-Huan
2006, 26(1): 35-38
DOI:
B
Abstract
(
1684
)
PDF
(471KB) (
801
)
Machinery Matching Technology for
Mechanized Construction of Long Tunnels
ZHANG Pi-Jie
2006, 26(1): 39-43
DOI:
A
Abstract
(
2114
)
PDF
(575KB) (
1291
)
Construction Scheme of Mined Tunnels of
Dongdan Station of Line 5 of Beijing Metro
HU Xi-Bei
2006, 26(1): 44-48
DOI:
B
Abstract
(
1671
)
PDF
(818KB) (
1223
)
Key Construction Technology of Shield TBM Launching Shaft
of Wuhang Yangtze River Crossing Tunnel
LEI Zhi-Jiang, WANG Chao-Feng
2006, 26(1): 49-52
DOI:
B
Abstract
(
1780
)
PDF
(571KB) (
1013
)
Discussions on Potential Harm of Geology Exploring
Borehole Drilling on Tunnel Construction
XU Jun-Zhe
2006, 26(1): 53-55
DOI:
B
Abstract
(
1718
)
PDF
(365KB) (
1012
)
Analysis on Settlement of Pile Foundation Underpinning
Area Induced by Construction of Overlapped Tunnels
ZHANG Wen-Jiang
2006, 26(1): 56-58
DOI:
B
Abstract
(
1508
)
PDF
(444KB) (
924
)
Application of Geodetic Quadrangle Method in Control
Survey of Plumbing of Tunnel Portal
DUAN Jie
2006, 26(1): 59-62
DOI:
B
Abstract
(
1618
)
PDF
(328KB) (
972
)
Study on Measures to Improve Durability of
Reinforced Concrete of Tunnel Works
WANG Lei, WEN Bao-Lian, GAO Guo-Hui, SUN Bao-Dong, LIAO Gui-Jun
2006, 26(1): 63-66
DOI:
B
Abstract
(
1700
)
PDF
(532KB) (
1481
)
Construction and Monitoring of Large Span Highway
Tunnel Crossing Underneath Highway in Scenic Resort
CAO Guan-Kai
2006, 26(1): 67-69,73
DOI:
B
Abstract
(
1647
)
PDF
(802KB) (
988
)
Construction Technology of Streetcrossing
Underpass in Soft and Waterrich Ground
LIU Hua-Gong
2006, 26(1): 70-73
DOI:
B
Abstract
(
1422
)
PDF
(554KB) (
720
)
Application of Grouting Consolidation Technology in Mud Ground
LIU Kun-Feng, Guan-Ze-Yang
2006, 26(1): 74-77
DOI:
B
Abstract
(
1913
)
PDF
(399KB) (
1633
)
Construction and Distortion Analysis of Piperoof Installed in
Chongwenmen Metro Station Underneath Existing Metro Line
CHEN Gao, JIANG Jing-Shan, TAO Hai-Bei
2006, 26(1): 78-80
DOI:
A
Abstract
(
1481
)
PDF
(572KB) (
1135
)
Construction Technology of Closespaced, Largespanned and Super
shallowburied Twintube Tunnel that Runs Underneath Existing Railway
SHU Liang-Lai, DONG Tian-Le
2006, 26(1): 81-84
DOI:
B
Abstract
(
1814
)
PDF
(691KB) (
840
)
Construction Technology of Roadbed in Swelling Soil Area
GU Pan-Bin
2006, 26(1): 85-87
DOI:
B
Abstract
(
1451
)
PDF
(324KB) (
1011
)
Application of Longdistance Pumping Technology of Concrete Delivery Pumps
YANG You-Sheng
2006, 26(1): 88-90
DOI:
B
Abstract
(
1541
)
PDF
(368KB) (
1139
)
Construction Technology of Waterproofing Layers of Elevated
Nonballast Bridge of Jinbin Light Rail
XU Yong-Hu
2006, 26(1): 91-92,104
DOI:
B
Abstract
(
1758
)
PDF
(572KB) (
808
)
Considerations on Three Elements of Construction
Management of BOT Projects
CHEN Guo-Rong
2006, 26(1): 93-95,101
DOI:
C
Abstract
(
1247
)
PDF
(607KB) (
757
)
Reforming Enterprise's Statistics System|
Enhancing Enterprise's Management Level
HUANG Zhi-Jie
2006, 26(1): 96-98
DOI:
C
Abstract
(
1146
)
PDF
(309KB) (
748
)
Discussion on Elusion and Countermeasures of Dissension Risks
Concerned with Subcontracting of Engineering Project
CHEN Wen-Nai
2006, 26(1): 99-101
DOI:
C
Abstract
(
1568
)
PDF
(408KB) (
1002
)
Management of Construction Enterprise's Receivable Funds
LEI Xiang-Dong
2006, 26(1): 102-104
DOI:
C
Abstract
(
1417
)
PDF
(348KB) (
662
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat