Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (1) Published: 20 February 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Basic Design Principle of Passenger Dedicated Railway Tunnels
WANG Meng-Shu
2006, 26(1): 1-1
Abstract
(
935
)
PDF
(220KB) (
997
)
New Trend of Insurance for Tunnel Projects
MAO Ru
2006, 26(1): 2-3
DOI:
B
Abstract
(
1171
)
PDF
(301KB) (
922
)
Cultural Element: Source Power for Sustainable
Development of Enterprises
GUO Shan-Yun
2006, 26(1): 4-5
Abstract
(
1164
)
PDF
(293KB) (
766
)
Connectivity Characteristics of Karst Water Gushing a Railway Tunnel
LIU Qiao-Wei, ZHANG Min-Qiang
2006, 26(1): 6-9
DOI:
A
Abstract
(
1855
)
PDF
(805KB) (
869
)
Analysis on and Control of Settlement in Metro Construction
JIA Jian-Jun, Zhang-Ding-Li, Wang-Meng-Shu, Zhang-Cheng-Beng
2006, 26(1): 10-13
DOI:
A
Abstract
(
1961
)
PDF
(634KB) (
1087
)
Analysis on Monitoring Results of Opencut Metro Stations
Reinforced by Soil Nails and Anchoring Cables
WANG Wen-Tong, ZHANG Xiang-Duo
2006, 26(1): 14-17
DOI:
A
Abstract
(
1722
)
PDF
(454KB) (
837
)
Analysis on Ground Surface Deformation Induced by
Undercutting under Shallow Overburden in Tianjin Metro
GU Jian-Bei, JIAO Cang, FAN Feng
2006, 26(1): 18-20,24
DOI:
A
Abstract
(
1968
)
PDF
(685KB) (
1071
)
Analysis on Impact of Construction of Shallowburied Soft Ground
Tunnels on Deformations of Ground Surface and Surrounding Rock Mass
WANG Xian-Chun, PENG Ji-Dong, ZHANG Hong-Bo
2006, 26(1): 21-24
DOI:
A
Abstract
(
1947
)
PDF
(386KB) (
896
)
Analysis on Application of Isolation Piles in Construction
of Mined Tunnels Underneath Existing Buildings
GU Chi-Chao
2006, 26(1): 25-26,101
DOI:
A
Abstract
(
1204
)
PDF
(692KB) (
1091
)
Discussions on GPS Height Transformation in Mountain Area
GENG Ting-Song, CAO Jia-Huai, ZHANG Tong-Gang
2006, 26(1): 27-31
DOI:
A
Abstract
(
1253
)
PDF
(579KB) (
1081
)
Application of EXCEL in Calculation of Coordinates
of Stakes on Centerline of Alignment
ZHANG Bao-Li, XUE Zhi-Qi, YANG Shu-Cheng
2006, 26(1): 32-34
DOI:
B
Abstract
(
1723
)
PDF
(265KB) (
1564
)
Construction Technology of Anchoring Cables in Waterrich Silty
Sand Layers: Case Study of Jiefang Road Stretching Works in Hangzhou
GUO Da-Huan
2006, 26(1): 35-38
DOI:
B
Abstract
(
1710
)
PDF
(471KB) (
829
)
Machinery Matching Technology for
Mechanized Construction of Long Tunnels
ZHANG Pi-Jie
2006, 26(1): 39-43
DOI:
A
Abstract
(
2149
)
PDF
(575KB) (
1299
)
Construction Scheme of Mined Tunnels of
Dongdan Station of Line 5 of Beijing Metro
HU Xi-Bei
2006, 26(1): 44-48
DOI:
B
Abstract
(
1705
)
PDF
(818KB) (
1258
)
Key Construction Technology of Shield TBM Launching Shaft
of Wuhang Yangtze River Crossing Tunnel
LEI Zhi-Jiang, WANG Chao-Feng
2006, 26(1): 49-52
DOI:
B
Abstract
(
1820
)
PDF
(571KB) (
1023
)
Discussions on Potential Harm of Geology Exploring
Borehole Drilling on Tunnel Construction
XU Jun-Zhe
2006, 26(1): 53-55
DOI:
B
Abstract
(
1739
)
PDF
(365KB) (
1048
)
Analysis on Settlement of Pile Foundation Underpinning
Area Induced by Construction of Overlapped Tunnels
ZHANG Wen-Jiang
2006, 26(1): 56-58
DOI:
B
Abstract
(
1529
)
PDF
(444KB) (
933
)
Application of Geodetic Quadrangle Method in Control
Survey of Plumbing of Tunnel Portal
DUAN Jie
2006, 26(1): 59-62
DOI:
B
Abstract
(
1658
)
PDF
(328KB) (
978
)
Study on Measures to Improve Durability of
Reinforced Concrete of Tunnel Works
WANG Lei, WEN Bao-Lian, GAO Guo-Hui, SUN Bao-Dong, LIAO Gui-Jun
2006, 26(1): 63-66
DOI:
B
Abstract
(
1724
)
PDF
(532KB) (
1492
)
Construction and Monitoring of Large Span Highway
Tunnel Crossing Underneath Highway in Scenic Resort
CAO Guan-Kai
2006, 26(1): 67-69,73
DOI:
B
Abstract
(
1676
)
PDF
(802KB) (
1019
)
Construction Technology of Streetcrossing
Underpass in Soft and Waterrich Ground
LIU Hua-Gong
2006, 26(1): 70-73
DOI:
B
Abstract
(
1453
)
PDF
(554KB) (
726
)
Application of Grouting Consolidation Technology in Mud Ground
LIU Kun-Feng, Guan-Ze-Yang
2006, 26(1): 74-77
DOI:
B
Abstract
(
1954
)
PDF
(399KB) (
1666
)
Construction and Distortion Analysis of Piperoof Installed in
Chongwenmen Metro Station Underneath Existing Metro Line
CHEN Gao, JIANG Jing-Shan, TAO Hai-Bei
2006, 26(1): 78-80
DOI:
A
Abstract
(
1513
)
PDF
(572KB) (
1148
)
Construction Technology of Closespaced, Largespanned and Super
shallowburied Twintube Tunnel that Runs Underneath Existing Railway
SHU Liang-Lai, DONG Tian-Le
2006, 26(1): 81-84
DOI:
B
Abstract
(
1831
)
PDF
(691KB) (
874
)
Construction Technology of Roadbed in Swelling Soil Area
GU Pan-Bin
2006, 26(1): 85-87
DOI:
B
Abstract
(
1492
)
PDF
(324KB) (
1047
)
Application of Longdistance Pumping Technology of Concrete Delivery Pumps
YANG You-Sheng
2006, 26(1): 88-90
DOI:
B
Abstract
(
1556
)
PDF
(368KB) (
1174
)
Construction Technology of Waterproofing Layers of Elevated
Nonballast Bridge of Jinbin Light Rail
XU Yong-Hu
2006, 26(1): 91-92,104
DOI:
B
Abstract
(
1785
)
PDF
(572KB) (
853
)
Considerations on Three Elements of Construction
Management of BOT Projects
CHEN Guo-Rong
2006, 26(1): 93-95,101
DOI:
C
Abstract
(
1270
)
PDF
(607KB) (
762
)
Reforming Enterprise's Statistics System|
Enhancing Enterprise's Management Level
HUANG Zhi-Jie
2006, 26(1): 96-98
DOI:
C
Abstract
(
1176
)
PDF
(309KB) (
751
)
Discussion on Elusion and Countermeasures of Dissension Risks
Concerned with Subcontracting of Engineering Project
CHEN Wen-Nai
2006, 26(1): 99-101
DOI:
C
Abstract
(
1606
)
PDF
(408KB) (
1041
)
Management of Construction Enterprise's Receivable Funds
LEI Xiang-Dong
2006, 26(1): 102-104
DOI:
C
Abstract
(
1453
)
PDF
(348KB) (
701
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat