Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (6) Published:
Previous Issue
Next Issue
Back issue
Evolution of Rock Mass Pressure Theory and Researches on Tunnel Failure Mechanism
ZHENG Yingren, WANG Yongfu
2013, 33(6): 423-430
DOI:
10.3973/j.issn.1672-741X.2013.06.001
Abstract
(
3355
)
PDF
(6379KB) (
2092
)
Mechanical Matching for Doubletrack Railway Tunnels Constructed by DrillingandBlasting Method and Analysis on Its Applicability: Case Study on Tunnels on GuiyangGuangzhou Railway
XU Wenchao, TANG Xian’gao
2013, 33(6): 431-436
DOI:
10.3973/j.issn.1672-741X.2013.06.002
Abstract
(
2924
)
PDF
(1059KB) (
1705
)
Development of Experimental System for Rockbreaking Mechanism of TBM Disc Cutters
CHEN Qiwei, LI Fengyuan, HAN Weifeng
2013, 33(6): 437-442
DOI:
10.3973/j.issn.1672-741X.2013.06.003
Abstract
(
4195
)
PDF
(3071KB) (
1215
)
Application, Research and Future of Tunnel Boring Machine Technology
PENG Qi
2013, 33(6): 443-448
DOI:
10.3973/j.issn.1672-741X.2013.06.004
Abstract
(
4680
)
PDF
(998KB) (
1329
)
Study on Construction Technologies for Metro Tunnel Crossing Underneath Existing Railway in Mountainous Urban Area
ZHENG Pengwu, WAN Fei
2013, 33(6): 449-455
DOI:
10.3973/j.issn.1672-741X.2013.06.005
Abstract
(
3291
)
PDF
(1457KB) (
927
)
Study on Risk Management of Tunnels on DongguanHuizhou Intercity Railway
LIU Tao
2013, 33(6): 456-461
DOI:
10.3973/j.issn.1672-741X.2013.06.006
Abstract
(
3008
)
PDF
(840KB) (
1261
)
Study on Settlement Prediction of Metro Tunnels Based on Ant Colony Algorithm
CHEN Xifeng, LIU Ling, HUANG Teng
2013, 33(6): 462-468
DOI:
10.3973/j.issn.1672-741X.2013.06.007
Abstract
(
2958
)
PDF
(1446KB) (
855
)
Key Points of Design of Tracks of Automated People Mover System
LUO Xinwei
2013, 33(6): 469-473
DOI:
10.3973/j.issn.1672-741X.2013.06.008
Abstract
(
3249
)
PDF
(1171KB) (
1928
)
Key Technologies for Design and Construction of Shallowcovered Forkedsection of Jiaozhou Bay Tunnel
LIU Peng
2013, 33(6): 474-480
DOI:
10.3973/j.issn.1672-741X.2013.06.009
Abstract
(
3326
)
PDF
(1584KB) (
932
)
Analysis on Difficulties in Construction of Deepcovered Tunnels: Case Study on Tunnels of Jinping II Hydropower Station
ZHOU Chuiyi, LI Jun, YAN Peng
2013, 33(6): 481-488
DOI:
10.3973/j.issn.1672-741X.2013.06.010
Abstract
(
3823
)
PDF
(4962KB) (
1951
)
Key Construction Technologies for Mined Metro Station Tunnels with Superlarge Span and Shallow Cover Located in Complex Ground: Case Study on Xinggong Street Station of Dalian Metro
DONG Zilong, LONG Wei
2013, 33(6): 489-498
DOI:
10.3973/j.issn.1672-741X.2013.06.011
Abstract
(
3396
)
PDF
(2631KB) (
835
)
Construction Technologies for Shield Boring Crossing Closely Underneath Existing Metro Station under Complex Conditions
JIANG Hualong
2013, 33(6): 499-509
DOI:
10.3973/j.issn.1672-741X.2013.06.012
Abstract
(
3340
)
PDF
(3182KB) (
1056
)
Key Technologies for Borehole Drilling by Rotary Drilling Machines in Heterogeneous Ground: Case Study on Bored Piles of Vertical Shaft of Xiangjiang River Crossing Tunnel
ZHAO Quanmin
2013, 33(6): 510-514
DOI:
10.3793/j.issn.1672-741X.2013.06.013
Abstract
(
4257
)
PDF
(2205KB) (
857
)
Support Technologies for and Monitoring Analysis on Deep Foundation Pit Adjacent to Existing Metro Tunnel
FENG Longfei, YANG Xiaoping, LIU Tingjin
2013, 33(6): 515-520
DOI:
10.3973/j.issn.1672-741X.2013.06.014
Abstract
(
3090
)
PDF
(1473KB) (
1179
)
Suspension Protection of 1.8 m Watersupply Pipe Crossing Foundation Pit by means of Universal Bars
ZHANG Jun
2013, 33(6): 521-525
DOI:
10.3973/j.issn.1672-741X.2013.06.015
Abstract
(
2965
)
PDF
(1240KB) (
1352
)
Automatic Control of Thrust Cylinders of Shield Machines under Segment Erection Mode
LI Chi, LIU Shubing, BIAN Ye
2013, 33(6): 526-529
DOI:
10.3973/j.issn.1672-741X.2013.06.016
Abstract
(
4283
)
PDF
(911KB) (
785
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat