Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2013, 33 (5) Published:
Previous Issue
Next Issue
Back issue
Study on Technological Advantages and Problems in Construction of Tunnels Crossing Rivers and Seas
SUN Jun
2013, 33(5): 337-342
DOI:
10.3973/j.issn.1672-741X.2013.05.001
Abstract
(
3287
)
PDF
(936KB) (
1449
)
Development and Key Technologies of Immersed Highway Tunnels
ZHANG Zhigang, LIU Hongzhou
2013, 33(5): 343-347
DOI:
10.3973/j.issn.1672-741X.2013.05.002
Abstract
(
2381
)
PDF
(1090KB) (
1824
)
Study on Soft Ground Settlement Caused by Large Diameter Slurry Shield Boring
ZHU Jianming, CHENG Haifeng, JIANG Qiang
2013, 33(5): 348-353
DOI:
103973/jissn1672-741X201305003
Abstract
(
3096
)
PDF
(1692KB) (
1352
)
Construction Monitoring and Numerical Simulation Analysis of the First Metro Entrance/exit Tunnel Constructed by Rectangular Pipe Jacking Method in Wuhan
CHEN Cong, ZHENG Xinding, CHEN Yangxun, WANG Chao, ZHONG Shihua, HE Bin
2013, 33(5): 354-361
DOI:
103973/jissn1672-741X201305004
Abstract
(
2847
)
PDF
(2491KB) (
797
)
Analysis on Protection Effect of Composite Bolt Piles on Existing Bridge Piles in Sandy Cobble Ground
WANG Dongqing
2013, 33(5): 362-367
DOI:
10.3973/j.issn.1672-741X.2013.05.005
Abstract
(
3189
)
PDF
(4106KB) (
841
)
Abaqus Plugin Development for the Calculation of Shield Tunnel Segments
LI Yi, GONG Ruhuan, TANG Weiqiao, QI Xuan, WANG Yonghuan
2013, 33(5): 368-372
DOI:
10.3973/j.issn.1672-741X.2013.05.006
Abstract
(
4750
)
PDF
(1467KB) (
2168
)
Analysis on Influence on Existing Zhongliangshan Tunnel on XiangyangChongqing Railway Imposed by Construction of Abovecrossing New Zhongliangshan Tunnel on ChengduChongqing Passengerdedicated Railway
LIU Zhiqiang, WANG Bin, XING Xiaofei
2013, 33(5): 373-377
DOI:
10.3973/j.issn.1672-741X.2013.05.007
Abstract
(
3743
)
PDF
(1416KB) (
875
)
Study on Safety of Smallspaced IntersectingTunnels Constructed by Benchcut Method
DU Libing, YAN Songhong, CAI Baijie
2013, 33(5): 378-382
DOI:
103973/jissn1672-741X201305008
Abstract
(
4379
)
PDF
(1451KB) (
1062
)
Discussion on Load Calculation Methods of Deepburied Multiarch Tunnels
LI Jingjun, DING Wenqi, WEI Xinxin
2013, 33(5): 383-387
DOI:
10.3973/j.issn.1672-741X.2013.05.009
Abstract
(
3108
)
PDF
(1652KB) (
1167
)
Discussion on Countermeasures to Avoid Roadbed Mud Flow in Railway Tunnels in Waterrich Area
ZHAI Ke
2013, 33(5): 388-392
DOI:
103973/jissn1672-741X201305010
Abstract
(
2783
)
PDF
(1137KB) (
1111
)
Design of Ventilation and Air Conditioning System of Zhonglou Station of Line 2 of Xi’an Metro
ZHANG Peng, LIN Di, SHEN Jian
2013, 33(5): 393-397
DOI:
103973/jissn1672-741X201305011
Abstract
(
2992
)
PDF
(2263KB) (
1637
)
Analysis on and Countermeasures for Technical Difficulties in Construction of Yellow River Crossing Tunnel on Central Route of SouthtoNorth Water Transfer Project
ZHENG Qingjun, ZHONG Shengxing
2013, 33(5): 398-406
DOI:
10.3973/j.issn.1672-741X.2013.05.012
Abstract
(
2460
)
PDF
(2692KB) (
1033
)
Key Construction Technologies for Archbox Structure of Cut and Cover Tunnel
ZHOU Yanjun, LIU Huakuan
2013, 33(5): 407-411
DOI:
10.3973/j.issn.1672-741X.2013.05.013
Abstract
(
2824
)
PDF
(1324KB) (
890
)
Case Study on Key Construction Technologies for Mined Tunnels Crossing Closely Underneath Existing Metro Station
SUN Xudong
2013, 33(5): 412-418
DOI:
10.3973/j.issn.1672-741X.2013.05.014
Abstract
(
3387
)
PDF
(4151KB) (
1076
)
Case Study on Longdistance Ventilation of Zhongtianshan Tunnel Driven by TBM
DUO Shengjun
2013, 33(5): 419-422
DOI:
10.3973/j.issn.1672-741X.2013.05.015
Abstract
(
2859
)
PDF
(1076KB) (
1152
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat