Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2016, 36 (5) Published: 20 May 2016
Previous Issue
Next Issue
Back issue
Tunneling by Mining Method: Lecture VII: Fiber Concrete Lining
GUAN Baoshu
2016, 36(5): 497-507
DOI:
10.3973/j.issn.1672-741X.2016.05.001
Abstract
(
1915
)
PDF
(2141KB) (
1250
)
Discussion on Deformation Monitoring Accuracy of Highway Tunnel Construction
XIA Caichu, NA Tongxing, PENG Guocai, CHEN Zhongqing
2016, 36(5): 508-512
DOI:
10.3973/j.issn.1672-741X.2016.05.002
Abstract
(
2376
)
PDF
(877KB) (
931
)
Relevancy Analysis of Shield Tunnel Boring Parameters and Leakage of Tunnel Segment by Means of FPGrowth Algorithm
WU Huiming, YANG Wei, JIANG Peng, GAO Xinwen
2016, 36(5): 513-517
DOI:
10.3973/j.issn.1672-741X.2016.05.003
Abstract
(
1915
)
PDF
(896KB) (
660
)
Study of Rock Mass Classification and Support Technology of Underground Watersealed Petroleum Storage Caverns
CHEN Qinghuai, WEN Xinliang
2016, 36(5): 518-524
DOI:
10.3973/j.issn.1672-741X.2016.05.004
Abstract
(
2018
)
PDF
(1791KB) (
776
)
Application of Tunnel Blasting Vibration Disaster Prediction Based on LMBP Neural Network
JIANG Li, HUANG Huadong, WANG Xianyi, CHEN Huashen
2016, 36(5): 525-530
DOI:
10.3973/j.issn.1672-741X.2016.05.005
Abstract
(
1986
)
PDF
(1773KB) (
760
)
Discussion on Distance Requirement and Settlement Control Standard of Metro Shield Tunnel Crossing Underneath Highpressure Liquefied Natural Gas (LNG) Pipeline
ZHANG Zhuqing
2016, 36(5): 531-536
DOI:
10.3973/j.issn.1672-741X.2016.05.006
Abstract
(
2257
)
PDF
(1639KB) (
1167
)
Adaptability of Cement Properties to Lowalkali Liquid Setting Accelerator
WU Huaming, ZHANG Jiangang, YU Cheng, LU Haimei
2016, 36(5): 537-543
DOI:
10.3973/j.issn.1672-741X.2016.05.007
Abstract
(
2080
)
PDF
(2044KB) (
711
)
Optimization Analysis of Calculation of Temporary Ring Beam for Shield Hoisting Shaft of Metro Station
GAO Tao, ZHAO Rui
2016, 36(5): 544-548
DOI:
10.3973/j.issn.1672-741X.2016.05.008
Abstract
(
1480
)
PDF
(1164KB) (
752
)
Study of Causes and Countermeasure of Excavation Face Failure of Slurry Shield Tunnel Stopping Section in Expansive Soil: A Case Study of Slender West Lake Tunnel in Yangzhou
ZHANG Yazhou, ZHU Wei, CHEN Jian, MIN Fanlu, SHI Hailing
2016, 36(5): 549-555
DOI:
10.3973/j.issn.1672-741X.2016.05.009
Abstract
(
1912
)
PDF
(1740KB) (
664
)
Study of Inner Contour Mode of Raiway Tunnels with Speed Less than 160 km/h
MA Tao, CHEN Shiyu, HAN Xianmin, GONG Yanfeng
2016, 36(5): 556-561
DOI:
10.3973/j.issn.1672-741X.2016.05.010
Abstract
(
2686
)
PDF
(1937KB) (
1518
)
Sand Filling Construction Technology for Foundation of Honggu Immersed Tunnel in Nanchang
YANG Yanling, CHEN Wang, WAN Anluo
2016, 36(5): 562-568
DOI:
10.3973/j.issn.1672-741X.2016.05.011
Abstract
(
2192
)
PDF
(1551KB) (
802
)
Key Technologies for Slurry Shield Crossing Shallowburied Water Permeable Strata
WANG Mingsheng
2016, 36(5): 569-576
DOI:
10.3973/j.issn.1672-741X.2016.05.012
Abstract
(
1704
)
PDF
(1876KB) (
823
)
Advanced Doubledrift Construction Technologies for Taoshuping Tunnel Crossing Waterrich Fine Silty Sand Strata
ZHANG Xuewen
2016, 36(5): 577-584
DOI:
10.3973/j.issn.1672-741X.2016.05.013
Abstract
(
1774
)
PDF
(1798KB) (
664
)
An Improved Raiseboring Method for Hardrock Deep Vertical Shaft and Discussion on Determination of Surrounding Rock Pressure
GUO Jilin, ZHANG Junru, LI Xiaogang, LI Hongtao
2016, 36(5): 585-591
DOI:
10.3973/j.issn.1672-741X.2016.05.014
Abstract
(
1742
)
PDF
(1532KB) (
607
)
Study of Technology of Blasting Vibration Velocity Control of Small Clear Spacing Twintube Tunnel Crossing Underneath Buildings
LI Ligong, ZHANG Liangliang, LIU Xing
2016, 36(5): 592-599
DOI:
10.3973/j.issn.1672-741X.2016.05.015
Abstract
(
2005
)
PDF
(1884KB) (
764
)
Discussion on Construction Schedule Shortening Program for Qamchiq Extralong Railway Tunnel in Uzbekistan
LIU Yi, XIE Dawen
2016, 36(5): 600-605
DOI:
10.3973/j.issn.1672-741X.2016.05.016
Abstract
(
1595
)
PDF
(1565KB) (
763
)
Comprehensive Construction Technologies for Vertical Shaft and Horizontal Adit of A Mined Tunnel of Shenyang Metro Crossing Underneath Garbagepacked Layer
WANG Jihua
2016, 36(5): 606-613
DOI:
10.3973/j.issn.1672-741X.2016.05.017
Abstract
(
1512
)
PDF
(2249KB) (
1008
)
Study and Application of TBM Belt Conveyor Construction to Cold Areas in Winter
ZHANG Hao
2016, 36(5): 614-618
DOI:
10.3973/j.issn.1672-741X.2016.05.018
Abstract
(
3258
)
PDF
(1109KB) (
740
)
Analysis of Shield Dismantling Method under Conditions of Closed Receiving Shaft
LI Hai, ZHU Changsong
2016, 36(5): 619-626
DOI:
10.3973/j.issn.1672-741X.2016.05.019
Abstract
(
2234
)
PDF
(2398KB) (
912
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat