Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2019, 39 (7) Published: 20 July 2019
Previous Issue
Next Issue
Back issue
超大直径泥水盾构常压换刀设计关键技术——以汕头海湾隧道及深圳春风隧道为例
谭顺辉, 孙恒
2019, 39(7): 1073-1082
DOI:
10.3973/j.issn.2096-4498.2019.07.001
Abstract
(
754
)
PDF
(9112KB) (
1319
)
Construction Risk Monitoring System and Parameter Warning of EPB Shield
JIANG Yusheng, SUN Zhengyang, YANG Zhiyong
2019, 39(7): 1083-1089
DOI:
10.3973/j.issn.2096-4498.2019.07.002
Abstract
(
880
)
PDF
(4432KB) (
599
)
Visual Lag Characteristics of Drivers When Driving in Tunnel Portal Section
PAN Guobing, NIU Maoqin, LIU Zhen, ZHAO Ningyu,LI Mengcheng, LI Huarong
2019, 39(7): 1090-1096
DOI:
10.3973/j.issn.2096-4498.2019.07.003
Abstract
(
380
)
PDF
(1446KB) (
327
)
Fire Ventilation Scheme and Parameter Sensitivity of Emergency Rescue Station in ZhengzhouWanzhou Highspeed Railway Tunnel Portal
ZHAO Dongping, JIANG Yao, LI Laosan, YANG Baihong
2019, 39(7): 1097-1103
DOI:
10.3973/j.issn.2096-4498.2019.07.004
Abstract
(
428
)
PDF
(1009KB) (
412
)
Inverse Control Technology of Dynamic Neural Network of EPB Shield
ZOU Jinjian
2019, 39(7): 1104-1109
DOI:
10.3973/j.issn.2096-4498.2019.07.005
Abstract
(
425
)
PDF
(1145KB) (
296
)
Action Mechanism of Prestressed Yielding Anchor Cable in Large Deformation Control of Soft Rock Tunnel
ZHAO Wei, LEI Shengxiang, XIAO Qinghua, LIU Jifeng, CHEN Qiaofeng
2019, 39(7): 1110-1117
DOI:
10.3973/j.issn.2096-4498.2019.07.006
Abstract
(
550
)
PDF
(2965KB) (
548
)
Discussion on Clearance Area of 400 km/h Highspeed Railway Tunnel Based on Rail Vehicle Internal Transient Pressure
SHI Xianming, WU Jian, WAN Xiaoyan, CHEN Yanghong
2019, 39(7): 1118-1124
DOI:
10.3973/j.issn.2096-4498.2019.07.007
Abstract
(
443
)
PDF
(3373KB) (
358
)
Tunneling Parameters Variation Laws and Velocity Prediction of Shield Tunneling in Sandyclay Composite Strata
YU Yunlong, GUAN Xiaoming, WANG Xuchun, NIE Qingke, ZHANG Ruofan
2019, 39(7): 1125-1131
DOI:
10.3973/j.issn.2096-4498.2019.07.008
Abstract
(
404
)
PDF
(1281KB) (
333
)
Recognition Methods for Boulder Geology Based on Shield Tunneling Parameters
LIU Jiandong, GUO Jingbo, WANG Xudong
2019, 39(7): 1132-1140
DOI:
10.3973/j.issn.2096-4498.2019.07.009
Abstract
(
401
)
PDF
(2298KB) (
351
)
Evaluation on Labor Intensity of Workers in Guigala Highaltitude Tunnel
ZHENG Xin, GUO Chun, WANG Xin, WANG Shuaishuai
2019, 39(7): 1141-1146
DOI:
10.3973/j.issn.2096-4498.2019.07.010
Abstract
(
420
)
PDF
(735KB) (
345
)
Basic Principles of a Design and Construction Method for Open Excavation Technology under Complex Conditions
YANG Huijun, KONG Heng
2019, 39(7): 1147-1151
DOI:
10.3973/j.issn.2096-4498.2019.07.011
Abstract
(
421
)
PDF
(2081KB) (
480
)
Bearing Capacity Calculation of Concretefilled Steel Tubular Column during Construction of Metro Station by PBA Method
LIU Li, GAO Xincai
2019, 39(7): 1152-1157
DOI:
10.3973/j.issn.2096-4498.2019.07.012
Abstract
(
388
)
PDF
(1041KB) (
381
)
Optimization of Structure Form of an Assembly Tunnel for Two TBMs
YANG Guang
2019, 39(7): 1158-1164
DOI:
10.3973/j.issn.2096-4498.2019.07.013
Abstract
(
370
)
PDF
(2031KB) (
343
)
深圳春风隧道主要施工技术难题与解决方案
郭卫社, 游永锋, 高攀, 梁奎生
2019, 39(7): 1165-1174
DOI:
10.3973/j.issn.2096-4498.2019.07.014
Abstract
(
577
)
PDF
(26453KB) (
1061
)
Development and Application of Automatic Laser Measuring and Lofting System for Tunnel Engineering
WANG Wei, XIE Shuang, LIU Baoxu, SHI Xindong
2019, 39(7): 1175-1179
DOI:
10.3973/j.issn.2096-4498.2019.07.015
Abstract
(
591
)
PDF
(1642KB) (
736
)
Key Construction Technologies of Shield in Opencut Utility Tunnel and Their Applications
YAN Yangyi, XIAO Wei, YANG Juhui, SHI Wei, CHEN Ping
2019, 39(7): 1180-1186
DOI:
10.3973/j.issn.2096-4498.2019.07.016
Abstract
(
364
)
PDF
(1871KB) (
376
)
并联式泥水/土压双模式盾构施工技术与冷冻刀盘开舱技术的创新与实践
朱劲锋, 廖鸿雁, 袁守谦, 易觉, 朱宝石
2019, 39(7): 1187-1200
DOI:
10.3973/j.issn.2096-4498.2019.07.017
Abstract
(
703
)
PDF
(27992KB) (
800
)
Innovative Design and Application of Caiyun TBM to Gaoligongshan Railway Tunnel
XIE Chengtao, ZHAO Hailei
2019, 39(7): 1201-1208
DOI:
10.3973/j.issn.2096-4498.2019.07.018
Abstract
(
458
)
PDF
(6922KB) (
606
)
Shield Type Selection for Urban Metro and Regionalization Study of Key Parameters
HUANG Xinmiao, ZHANG Junwei, LI Xue, ZHU Quanbing, REN Yueqin
2019, 39(7): 1209-1216
DOI:
10.3973/j.issn.2096-4498.2019.07.019
Abstract
(
383
)
PDF
(959KB) (
446
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat