Study on Transfer Schemes between Liyuan Station and OCT Branch Line of Wuhan Metro

TAO Lan, LI Shenkui   

  1. (China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China)
  • Received:2015-03-12 Revised:2015-04-27 Online:2015-06-20 Published:2015-06-25

Abstract:

According to the planning, No. 8 Line of Wuhan Metro should be extended to OCT. As a result, a “Y”shaped Metro line is designed, with Liyuan station as the transfer station between the main line and the OCT branch line. In this paper, the transfer schemes between Liyuan station and OCT branch line are studied on basis of three station types, i.e, separatefloor island station, oneisland and onesideplatform station and twoisland station, and by analyzing such factors as the train operation organization mode, the station scale, the transfer efficiency, the construction cost, the influence on Dong Lake scenic area, the traffic evacuation and the construction risk. Conclusion is drawn that the transfer scheme based on oneisland and onesideplatform station can meet the requirements of the coverage rate and development of the Metro line. The paper can provide reference for similar projects in the future. 

Key words: Wuhan Metro, transfer, separatefloor island station, oneisland and onesideplatform station, twoisland station