| [1] |
PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [2] |
LIU Yongsheng, CHEN Qiao, ZHANG Hepei, LI Shu′ao, LIN Chungang, YIN Long, LI Mengyu.
Open TBM Tunnel Intelligent Construction Technology
[J]. Tunnel Construction, 2025, 45(4): 816-833.
|
| [3] |
WU Senyang, CHEN Xiang, CHEN Peng, ZENG Yuhan.
Construction Risk Control
of Large-Section, Small-Spacing Rectangular Pipe-Jacking Metro Stations: A Case Study of Haibang
Metro Station in Guangzhou, China
[J]. Tunnel Construction, 2025, 45(2): 382-391.
|
| [4] |
WANG Jie, CHENG Guolong, ZHOU Bing, HU Wei, TAN Houjun, XIE Jianhong.
Safety Risk Evaluation of
Long-Distance Small-Diameter Tunnel Bored by Tunnel Boring
Machine
[J]. Tunnel Construction, 2024, 44(S2): 211-223.
|
| [5] |
MA Gang, KANG Zuo, GAO Huyan, YU Wenlong, KANG Jiawei.
Analysis on Safety Risk of Urban Metro Tunnel
Construction in Saturated Soft Loess Stratum and Its Countermeasures
[J]. Tunnel Construction, 2023, 43(S1): 425-433.
|
| [6] |
DU Lijie, ZHANG Zheng, LI Qingwei, ZHANG Weidong, DU Chuanqi, LIU Jiayi, YANG Yalei.
Comparative Analysis on Adaptability and Applications
of DoubleShield Open Tunnel Boring Machines
[J]. Tunnel Construction, 2023, 43(6): 921-928.
|
| [7] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
| [8] |
SUN Jun, JIANG Yu, LI Ning, WANG Bo, FAN Yong.
Surrounding Rock of Haidong Water Conveyance Tunnel of Central Yunnan Water Diversion Project: Risks and Countermeasures
for
Using Ordinary Prestressed Anchor Cables
[J]. Tunnel Construction, 2022, 42(8): 1321-1330.
|
| [9] |
LI Zhijun, CHEN Kui, CHEN Qiao, ZHOU Yi, LI Zeng, YU Jingbo, ZHANG Xiao.
Discussion on Open TBM Excavation Diameter of a
Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(5): 807-816.
|
| [10] |
LONG Bin, LIU Zhihua, XIAO Jing.
Adaptive Design of Tunnel Boring Machine Used in SichuanTibet
Railway Tunnel
under Complex and Severe Conditions
[J]. Tunnel Construction, 2021, 41(S2): 626-633.
|
| [11] |
JIA Jianbo, GAO Guangyi, WEN Xingming.
Comprehensive Treatment Techniques for LargeScale
Water and Mud Outburst in Gaoligongshan Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 394-.
|
| [12] |
ZHANG Jun, ZHANG Liang, YAO Hui.
Application of Clay Cement Slurry in Construction of
Deep Shaft of Gaoligongshan Tunnel
[J]. Tunnel Construction, 2021, 41(S1): 420-.
|
| [13] |
YANG Tengtian, LI Heng, ZHOU Guannan, GUO Wen.
Pregrouting Reinforcement Technology of Open TBM in
Soft Stratum
[J]. Tunnel Construction, 2021, 41(5): 858-864.
|
| [14] |
ZENG Yunchuan, LIU Jianbing, NIE Lichao.
Application of Comprehensive Advanced Forecasting
Technology Carried by TBM in Gaoligongshan Tunnel of
DaliRuili Railway
[J]. Tunnel Construction, 2021, 41(3): 419-426.
|
| [15] |
SI Jingzhao, ZENG Yunchuan, LIU Jianbing.
Challenges and Some Thoughts on OpenTBM
Construction in a Railway Tunnel with Complex
Geologies
[J]. Tunnel Construction, 2021, 41(3): 433-440.
|