Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2008, 28 (6) Published: 20 December 2008
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Comments on Application and Development of
TBM/Shield Tunneling Technology
GUO Shan-Yun
2008, 28(6): 631-637
DOI:
A
Abstract
(
1915
)
PDF
(1937KB) (
1152
)
Study on Cutting Torque Calculation of Cutterhead of Hard Rock TBMs
ZHANG Ning-Chuan
2008, 28(6): 638-641,645
DOI:
A
Abstract
(
1915
)
PDF
(1392KB) (
1423
)
Study and Application of Blast Forming Technology in
Excavation of Rockbolted Crane Girder
XU Cheng-Guang
2008, 28(6): 642-645
Abstract
(
1825
)
PDF
(891KB) (
787
)
Analysis on Funnel Viscosity of Slurry used in
Slurry Balanced Shield Machines
WANG Guang-Hui, Ca-Jun-Feng
2008, 28(6): 646-649
DOI:
A
Abstract
(
1863
)
PDF
(714KB) (
1103
)
Case Study on Invert Insitu Casting Technology Applied in No. 2
TBM Bored Contract Section of Dahuofang Water Diversion Project
SHU Wen-Hui
2008, 28(6): 650-655
DOI:
B
Abstract
(
1882
)
PDF
(1748KB) (
1128
)
Numerical Analysis on Grouted Roof Pipes of Largespan
Shallowburied Tunnel in Fine Silt Sand Ground
LI Li
2008, 28(6): 656-659
DOI:
A
Abstract
(
1761
)
PDF
(1495KB) (
880
)
Cost Analysis on Different Excavation Modes of Hard Rock Tunnels
JIANG Zhi-Yong, Song-Yi
2008, 28(6): 660-664
DOI:
A
Abstract
(
1989
)
PDF
(1264KB) (
1120
)
Application of RMR Method in Tunnel Construction
TANG Gong-Ning
2008, 28(6): 665-667,671
DOI:
B
Abstract
(
1630
)
PDF
(543KB) (
3482
)
Discussion on Electric Flux Test Method for Durability of Concrete in
Passengerdedicated Railway Works
HU Jiang, CHEN Hong-Guang
2008, 28(6): 668-671
DOI:
A
Abstract
(
1828
)
PDF
(830KB) (
1025
)
Experimental Study on Optimization of Admixtures for
Concrete Used in Chloriderich Area
CHENG Xiao-Meng, Shang-Yong-Luo, ZHOU Zhong-He
2008, 28(6): 672-676
DOI:
A
Abstract
(
1512
)
PDF
(1604KB) (
833
)
Application of VBA in Processing of Civil Engineering Data
LIU Jin-Gang, JI Xiao-Xu, MI Yan
2008, 28(6): 677-679,684
DOI:
A
Abstract
(
2029
)
PDF
(596KB) (
1671
)
Method to Calculate Settlement of Diaphragm
Wall by Mindlin Stress Solution
WANG Xue-Liang
2008, 28(6): 680-684
DOI:
A
Abstract
(
1830
)
PDF
(661KB) (
863
)
Application of Modern Quality Control Concept in
Ventilation Design of Extralong Highway Tunnels
TUN Qi-Yong, MAO Wei-Yun, YANG Ji-Qiong, SUN Qiang-Yun
2008, 28(6): 685-687,696
DOI:
B
Abstract
(
2106
)
PDF
(958KB) (
966
)
Economic Comparison and Contrast between Fixed Dry Dock Option and
Movable Dry Dock Option: Case Study on an Immersed Tunnel in Guangzhou
DAN Liu
2008, 28(6): 688-690,735
DOI:
B
Abstract
(
1991
)
PDF
(754KB) (
1084
)
Case Study on Monitoring System of Luntou
ShengwudaoUniversity Town Immersed Tunnel
CHEN Qian
2008, 28(6): 692-696
DOI:
B
Abstract
(
2165
)
PDF
(2404KB) (
840
)
Key Technologies of Shield Boring of Beijing Rail Transit Line Project
Chen-Qiang-Fu, HUANG Hua-Jun
2008, 28(6): 697-703,730
DOI:
B
Abstract
(
2228
)
PDF
(3580KB) (
1265
)
Construction Technology for Vault of Tailrace Surge
Chamber of Jinping Hydropower Station (I)
HU Xiang-Wei, Zhang-Kai-Xiong
2008, 28(6): 704-706
DOI:
B
Abstract
(
2225
)
PDF
(947KB) (
808
)
Technology for Treatment of Water Gushing in
No.4 Inclined Shaft of Xiangshan Tunnel
DIAO Chi-Bin
2008, 28(6): 707-710,715
DOI:
B
Abstract
(
2068
)
PDF
(1381KB) (
1391
)
Application of GFRP in Construction of Retaining
Structures of Shieldlaunching Shafts
YANG Gong-Jun
2008, 28(6): 711-715
DOI:
B
Abstract
(
1805
)
PDF
(2977KB) (
1843
)
Study on Construction Scheme of Tunnelling Through Karst and Gob Area
DIAO Geng-Liang, WEN Fu-Yuan
2008, 28(6): 716-719
DOI:
B
Abstract
(
2152
)
PDF
(1671KB) (
1009
)
Discussion on Protection Methods for Building/Structure Foundations
Underneath Which Metro Tunnels Pass
LI Li
2008, 28(6): 720-723
DOI:
B
Abstract
(
1839
)
PDF
(1495KB) (
954
)
Construction Technology for Metro Stations: Conversion from
Opencut Method to Mining Method
ZHANG Shuai-Jun, QIU Gao-Wen
2008, 28(6): 724-727
DOI:
B
Abstract
(
1864
)
PDF
(1170KB) (
908
)
Application of Rotary Drilling Rig in Bored Pile Construction: Case Study
on No. 4 Contract Section of Line 3 of Guangzhou Metro
SHAO Jian-Li, CHEN Xia
2008, 28(6): 728-730
DOI:
B
Abstract
(
1771
)
PDF
(370KB) (
868
)
Application of Excel in Survey Calculations in Jiping Highway in Qingdao
WANG Jun
2008, 28(6): 731-735
DOI:
A
Abstract
(
1670
)
PDF
(1964KB) (
1126
)
Diagnosis and Maintenance of Malfunctions of
Hydraulic Drive Systems of Construction Machinery
MA Li-Min
2008, 28(6): 736-739
DOI:
B
Abstract
(
1777
)
PDF
(363KB) (
1341
)
Maintenance Technology of Tail Skin Brushes of EPB Shield Machines
CHEN Zhi-Ning
2008, 28(6): 740-741,745
DOI:
B
Abstract
(
1629
)
PDF
(845KB) (
1754
)
Implementation of Safety Production Responsibility System with the
Core of “One Position with Two Responsibilities”
LEI Hong-Liang
2008, 28(6): 742-745
DOI:
C
Abstract
(
1584
)
PDF
(335KB) (
1474
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat