Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2011, 31 (5) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
刚性支承潜浮隧道
GAO Rongjiang
2011, 31(5): 529-535
Abstract
(
1802
)
PDF
(2294KB) (
1043
)
Research on “Bridge in South and Tunnel in North” Option for Bohai
宋克志,姜爱国,王梦恕
2011, 31(5): 536-542
Abstract
(
2108
)
PDF
(3091KB) (
1298
)
Study on Tunnel Ventilation Safety Information System Based on Eclipse RCP
李少利
2011, 31(5): 543-546
Abstract
(
1708
)
PDF
(1476KB) (
1126
)
Some Issues on Thirdparty Measurement: Case Study on Urban Rail Transit Works
王建
2011, 31(5): 547-549
Abstract
(
2250
)
PDF
(1121KB) (
1169
)
Geological Characteristics and Noxious Gas Control: Case Study on Meilingguan Tunnel on LanzhouChongqing Railway
郝俊锁
2011, 31(5): 550-554
Abstract
(
2181
)
PDF
(2277KB) (
1120
)
Secondary Cleaning Technology of Boreholes Made by Normal Circulation
张涛
2011, 31(5): 555-558
Abstract
(
1867
)
PDF
(1475KB) (
1243
)
Analysis on Safety Risks in Construction of Zhongyixueyuan Station of Chengdu Metro
陈海勇,石达强
2011, 31(5): 559-565
Abstract
(
2215
)
PDF
(2923KB) (
1101
)
Study on Planimetric Alignment Consistency of Portal Sections of Highway Tunnels
庞小冲, 唐学军
2011, 31(5): 566-568
Abstract
(
2103
)
Design of Test Platform of Simultaneous Grouting System of Shield
李博,舒启林,王军,张大伟
2011, 31(5): 569-572
Abstract
(
2690
)
PDF
(1539KB) (
1251
)
Rules of Chloride Iron Ingression in Concrete under Marine Environment
孙朋朋,赵铁军,金祖权,高祥壮,徐建光
2011, 31(5): 573-576
Abstract
(
2171
)
PDF
(1546KB) (
1088
)
Case Study on Widening Options of Jinjishan Tunnel
陈七林
2011, 31(5): 577-582
Abstract
(
2092
)
PDF
(2824KB) (
1138
)
Application of Micro Steel Pipe Piles in Underpinning in Guangzhou
魏玉省
2011, 31(5): 583-587
Abstract
(
1536
)
PDF
(1913KB) (
1269
)
Design of Water Pumping Stations in Running Tunnels of Urban Rail Transit Works
刘宗洲
2011, 31(5): 588-592
Abstract
(
2126
)
PDF
(1533KB) (
1045
)
Case Study on Developing Multiple Working Faces from Vertical Shaft of Metro Station
张金伟,张美琴,董长明
2011, 31(5): 593-597
Abstract
(
2256
)
PDF
(1723KB) (
1154
)
Key Construction Technology for Connecting between New Structureand Operating Metro Station
陈进山,李海龙
2011, 31(5): 598-604
Abstract
(
1796
)
PDF
(5648KB) (
1014
)
Risk Factor Analysis and Countermeasures for Shield Tunneling: Case Study on Shiziyang Tunnel
ZHENG Qingjun
2011, 31(5): 605-609
Abstract
(
2125
)
PDF
(2215KB) (
1248
)
Technology for Rapid Construction of Parallel Adit in Soft Surrounding Rock with Trackless Transportation System
LIU Chuan,LIU Yancang
2011, 31(5): 610-614
Abstract
(
2085
)
PDF
(2206KB) (
1149
)
Shield Stepping Technology for Metro Tunnels
WANG Zhufeng, CHEN Kui
2011, 31(5): 615-619
Abstract
(
2466
)
PDF
(1838KB) (
1189
)
Application and Analysis of Connection Triangle Orientation in Shielddriven Metro Tunnels
MO Zhongsheng
2011, 31(5): 620-623
Abstract
(
2494
)
PDF
(1261KB) (
1144
)
A New Type of Steel Rib Installing Machine Used in Tunneling
KANG Baosheng
2011, 31(5): 624-628
Abstract
(
2542
)
PDF
(2829KB) (
1259
)
Application of Overturning Technology in Invert Block Prefabrication
LIU Qingquan
2011, 31(5): 629-633
Abstract
(
1782
)
PDF
(2395KB) (
983
)
A New Type of Waterproofing Membrane Laying Machine Based on PLC and Remote Control
LIN Fulong, ZHANG Yongsheng
2011, 31(5): 639-642
Abstract
(
2159
)
PDF
(1531KB) (
1188
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat