Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2014, 34 (1) Published: 20 January 2014
Previous Issue
Next Issue
Back issue
Views on Key Technical Issues of Construction of Taiwan Strait Tunnel
SUN Jun
2014, 34(1): 1-5
DOI:
10.3973/j.issn.1672-741X.2014.01.001
Abstract
(
4783
)
PDF
(984KB) (
1744
)
Experiment on Mechanical Property of Straightwall Semicirclearch Concretefilled Steel Tube Support and its Application
GAO Yanfa, WANG Jun, HUANG Wanpeng, CHEN Binghui, WANG Liang, WANG Chao
2014, 34(1): 6-12
DOI:
10.3973/j.issn.1672-741X.2014.01.002
Abstract
(
2642
)
PDF
(2415KB) (
760
)
Highway Tunnel Surrounding Rock Deformation Prediction Model Based on Support Vector Machine Optimized by Ant Colony Optimization and Its Application
QIU Zhigang
2014, 34(1): 13-18
DOI:
10.3973/j.issn.1672-741X.2014.01.003
Abstract
(
2349
)
PDF
(978KB) (
701
)
Georobotbased Automatic Deformation Monitoring in Tunnel Construction
FAN Ben, ZHENG Jiqiang, ZHU Kundian
2014, 34(1): 19-23
DOI:
10.3973/j.issn.1672-741X.2014.01.004
Abstract
(
2817
)
PDF
(1295KB) (
1447
)
Analysis on Transfer Modes between Existing Doubletrack Metro Stations of Beijing Metro with Longterm Metro Stations
SHI Guangyin
2014, 34(1): 24-31
DOI:
10.3973/j.issn.1672-741X.2014.01.005
Abstract
(
2873
)
PDF
(1574KB) (
1183
)
Case Study on Design of Highway Overcrossing Existing Railway Tunnel
ZHOU Chao
2014, 34(1): 32-40
DOI:
10.3973/j.issn.1672-741X.2014.01.006
Abstract
(
2412
)
PDF
(7140KB) (
801
)
Numerical Analysis on Design of Protection Measures for Ancillary Structures of Wangchengpo Metro Station
WANG Lin, TAN Peilian, WANG Gen
2014, 34(1): 41-47
DOI:
10.3973/j.issn.1672-741X.2014.01.007
Abstract
(
2622
)
PDF
(1605KB) (
820
)
Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park
XI Jun, SUN Yuanguang
2014, 34(1): 48-52
DOI:
10.3973/j.issn.1672-741X.2014.01.008
Abstract
(
2909
)
PDF
(2088KB) (
1924
)
New Technologies Applied in Design and Construction of Shanghai Metro Works
BAI Tinghui
2014, 34(1): 53-59
DOI:
10.3973/j.issn.1672-741X.2014.01.009
Abstract
(
2865
)
PDF
(1916KB) (
1189
)
Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong KongZhuhaiMacau Bridge (HZMB) Project
YIN Haiqing
2014, 34(1): 60-66
DOI:
10.3973/j.issn.1672-741X.2014.01.010
Abstract
(
2956
)
PDF
(2198KB) (
2912
)
Case Study on Ground Penetrating Shield Technology (GPST)
WU Huiming, ZHOU Wenbo, TENG Li
2014, 34(1): 67-72
DOI:
10.3973/j.issn.1672-741X.2014.01.011
Abstract
(
2767
)
PDF
(2518KB) (
1386
)
Key Points in Implementation of Bonded Circumferential Prestressing of Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project
SUN Zhenchuan, ZHONG Shengxing
2014, 34(1): 73-77
DOI:
10.3973/j.issn.1672-741X.2014.01.012
Abstract
(
2335
)
PDF
(1151KB) (
894
)
Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Largediameter Shield
HAN Weifeng, ZHOU Jianjun,LI Fengyuan
2014, 34(1): 78-82
DOI:
10.3973/j.issn.1672-741X.2014.01.013
Abstract
(
2508
)
PDF
(9574KB) (
885
)
Analysis and Control of Grease Consumption of Main Bearing of a Shield
LI Dawei, ZHAO Xinhe
2014, 34(1): 83-87
DOI:
10.3973/j.issn.1672-741X.2014.01.014
Abstract
(
3488
)
PDF
(1107KB) (
1490
)
Case Study on Refurbishment of Cutterhead and Main Drive of Slurry Shield for Xiangjiang River Crossing Tunnel in Changsha, China
BU Zhuangzhi, PU Xiaobo, FENG Peipei
2014, 34(1): 88-94
DOI:
10.3973/j.issn.1672-741X.2014.01.015
Abstract
(
3009
)
PDF
(1787KB) (
863
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat