隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (S1): 404-412.DOI: 10.3973/j.issn.2096-4498.2020.S1.053

• 施工机械 • 上一篇    下一篇

6 680 mm盾构在狭小暗挖隧道内解体技术研究

寇鼎涛1, 2, 孙健1, 2   

  1. 1. 北京市轨道交通建设管理有限公司, 北京 100068; 2. 城市轨道交通全自动运行系统与安全监控北京市重点实验室, 北京 100068)

  • 出版日期:2020-08-30 发布日期:2020-09-14
  • 作者简介:寇鼎涛(1978—),男,陕西商洛人,2003年毕业于中国矿业大学,安全工程专业,硕士,高级工程师,现从事城市轨道交通建设管理和技术创新等工作。E-mail: 18590414@qq.com。

Study on Dismantle Technology of  6 680 mm Shield in Narrow Mined Tunnel

KOU Dingtao1, 2, SUN Jian1, 2   

  1. 1. Beijing MTR Construction Administration Corporation, Beijing 100068, China;2. Beijing Key Laboratory of Fully Automatic Operation and Safety Monitoring for Urban Rail Transit, Beijing 100068, China)

  • Online:2020-08-30 Published:2020-09-14

摘要: 为解决盾构在狭小空间内受接收端头尺寸限制无法正常接收的问题,在暗挖隧道内需采取辅助措施将主要部件解体后沿原盾构隧道倒运回始发井吊出。北京地铁19号线1期工程平安里站—积水潭站区间左线工程采用6 680 mm盾构进行施工,通过对接收端尺寸及预埋设计、暗挖空间内解体方案及顺序、解体过程中辅助吊装工艺、工期管理等方面进行研究,总结盾构在狭小暗挖空间内的解体方案及卡控要点,分析解体重难点及关键技术。研究结果表明: 盾构在狭小暗挖隧道内解体技术,可保证工程施工安全和进度,解决盾构在暗挖狭小空间内施工的技术难题和安全问题。

关键词: 盾构, 狭小暗挖空间, 盾构拆除方案, 盾构解体, 盾构接收

Abstract: In order to solve the problem that the shield cannot receive normally due to size restriction of the receiving end in narrow space, it is necessary to take auxiliary measures to disassemble the main parts and then transport them back to launching shaft along the original shield tunnel and lift them out. A 6 680 mm shield is adopted in the left line between Pinganli Station and Jishuitan Station of Beijing Metro Line 19 Phase Project, through the study on the size and embedded design of the receiving end, the disassembly scheme and sequence in mined space, the auxiliary hoisting technology during the disassembly process, the construction period management and other aspects, the shield disassembly scheme and control points in narrow and mined space are summarized, and the emphasis and difficulties and key technologies of disassembly are analyzed. The results show that the technology ensures the construction safety and progress, solves the technical and safety problems for shield construction in narrow and mined space.

Key words: shield, narrow and mined space, shield dismantle plan, shield disassembly, shield receiving