Abstract: The entrance section of Zhongtianshan tunnel on TurpanKorla railway in South Xinjiang passes through jointdenselydeveloped granite rock mass. In order to ensure the safe and successful boring of the TBM, advance selfdrilling bolts are installed through the cutterhead of the TBM, new type of polyurethane chemical grout is injected through the bolts and radial grouting is executed after the rock mass leaves the shield. In this way, the deformation and collapse of the rock mass have been brought under effective control and the availability of the equipment is improved. In the end, the TBM passes through the jointdenselydeveloped granite rock mass safely and efficiently.
Key words: open TBM, jointdenselydeveloped section, polyurethane grout, advance selfdrilling bolt, radial grouting
DENG Qingli. Technology for TBM Tunneling Through Jointdenselydeveloped Granite Sections[J]. Tunnel Construction, 2011, 31(6): 733-736.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I6/733