PAN Yue, XIE Tao, LIU Yongsheng, GAO Pan, YANG Zhenxing.
Intelligent Identification and Prevention of TBM Jamming in Hard-Rock Fractured Zones
[J]. Tunnel Construction, 2026, 46(2): 383-393.
|
| [2] |
LIU Yongsheng, CHEN Qiao, ZHANG Hepei, LI Shu′ao, LIN Chungang, YIN Long, LI Mengyu.
Open TBM Tunnel Intelligent Construction Technology
[J]. Tunnel Construction, 2025, 45(4): 816-833.
|
| [3] |
DU Lijie, ZHANG Zheng, LI Qingwei, ZHANG Weidong, DU Chuanqi, LIU Jiayi, YANG Yalei.
Comparative Analysis on Adaptability and Applications
of DoubleShield Open Tunnel Boring Machines
[J]. Tunnel Construction, 2023, 43(6): 921-928.
|
| [4] |
WEN Bin.
Key Technology and Application of Efficient Tunneling
of an Extra-Long Tunnel
Bored by Two Tunnel Boring Machines
[J]. Tunnel Construction, 2022, 42(S1): 433-441.
|
| [5] |
LI Zhijun, CHEN Kui, CHEN Qiao, ZHOU Yi, LI Zeng, YU Jingbo, ZHANG Xiao.
Discussion on Open TBM Excavation Diameter of a
Plateau Railway Tunnel
[J]. Tunnel Construction, 2022, 42(5): 807-816.
|
| [6] |
YANG Tengtian, LI Heng, ZHOU Guannan, GUO Wen.
Pregrouting Reinforcement Technology of Open TBM in
Soft Stratum
[J]. Tunnel Construction, 2021, 41(5): 858-864.
|
| [7] |
SI Jingzhao, ZENG Yunchuan, LIU Jianbing.
Challenges and Some Thoughts on OpenTBM
Construction in a Railway Tunnel with Complex
Geologies
[J]. Tunnel Construction, 2021, 41(3): 433-440.
|
| [8] |
WANG Yafeng, ZENG Jing, JIANG Jiayun.
Construction Technology of Open TBM in Gaoligongshan
Tunnel Crossing a
HighPressure WaterRich WeakFracture Altered Structural Belt
[J]. Tunnel Construction, 2021, 41(3): 449-457.
|
| [9] |
WANG Haijun.
Application of Stepping without Load Technology of Open TBM to Songhua River Water Diversion Project
[J]. Tunnel Construction, 2019, 39(9): 1500-1506.
|
| [10] |
LIU Feixiang, YU Yang.
TBM Technologies in Bad Geology of a Tunnel Project
[J]. Tunnel Construction, 2019, 39(9): 1515-1522.
|
| [11] |
XUE Jingpei.
Construction Technology of Open TBM Safely and Rapidly Pass through Strong Rockburst Formation of Lingnan Section on Qinling Tunnel of Hanjiang RiverWeihe River Water Conveyance Project
[J]. Tunnel Construction, 2019, 39(6): 989-997.
|
| [12] |
ZHANG Zhaotai, YOU Sheng, FENG Guangliang, CHEN Zhu, CHEN Bingrui.
Construction Technologies of Open TBM in Deepburied Rockburst Section with Soft and Hard Alternant Strata
[J]. Tunnel Construction, 2019, 39(5): 843-850.
|
| [13] |
XU Hucheng.
Analysis of Jam Treatment and Releasing Technologies for Open TBM in Fault Fracture Zone
[J]. Tunnel Construction, 2018, 38(S1): 156-160.
|
| [14] |
SONG Faliang, ZHAO Hailei.
Study of Key Construction Technologies of Open TBM in Complex Geological Conditions: Case Study of Gaoligongshan Tunnel
[J]. Tunnel Construction, 2017, 37(S1): 128-133.
|
| [15] |
YANG Jianxi, ZHANG Jin, LI Shimin, ZHANG Duo.
Key Technologies for Synchronous Construction of Inverted Arch Lining of Tunnel Bored by Open TBM
[J]. Tunnel Construction, 2017, 37(5): 622-629.
|