Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2009, 29 (5) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
wenzhang
Feasibility Study on Application of Open Shield in Construction of Beijing
Metro Tunnels in Cobblecontained Ground
GUO Jing-Bo, Wang-Yan-Fang
2009, 29(5): 481-484
DOI:
A
Abstract
(
2890
)
PDF
(872KB) (
1215
)
Suggestions on Health Standards of Working Environment in
Railway Tunnels under Construction
YANG Li-Xin
2009, 29(5): 485-490
DOI:
A
Abstract
(
2402
)
PDF
(373KB) (
1407
)
Rigidsupported Submerged Floating Tunnel
GAO Rong-Jiang
2009, 29(5): 491-495
DOI:
A
Abstract
(
1973
)
PDF
(2656KB) (
838
)
Study on Health Standards of Working Environment in Extralong
Tunnels on West Route of SouthtoNorth Water Transfer Project
LUO ZHan-Fu
2009, 29(5): 496-498,547
DOI:
A
Abstract
(
2100
)
PDF
(1186KB) (
1206
)
Case Study on Design of Construction Ventilation System of Chaohe Tunnel
on Central Route of SouthtoNorth Water Transfer Project
CAI Zhong-Yin, Jiang-Xue-Ying, Li-Hui-An, Yang-Wei-Jiu
2009, 29(5): 499-502,509
DOI:
B
Abstract
(
2256
)
PDF
(686KB) (
1471
)
Analysis on Tunnel Models by Bedrock Seismic Waves
YAN Xi-Shui, DIAO Yong-Qian, SHU Han-Hua, WANG Ying-Chao
2009, 29(5): 503-505,562
DOI:
A
Abstract
(
2289
)
PDF
(916KB) (
1114
)
Study on Undercrossing Existing Metro Station Construction
Scheme of Beijing Metro Line 4 Xuanwumen Station
WANG Zhi-Gang
2009, 29(5): 506-509
DOI:
B
Abstract
(
2579
)
PDF
(1519KB) (
1369
)
Case Study on Characteristics and Prevention and Control Measures of
Rock Bursts in Jinping Auxiliary Tunnel
CAO Qiang, JIA Hai-Bo, LIAO Zhuo
2009, 29(5): 510-512,578
DOI:
B
Abstract
(
2214
)
PDF
(635KB) (
1117
)
Design of a Metro Tunnel Tilting Detection System
LIU Jian, ZHANG Yan-Hong, CHEN Lu
2009, 29(5): 513-516,542
DOI:
A
Abstract
(
2213
)
PDF
(1633KB) (
1108
)
Analysis on Determination of Addition Constants and Proportion Constants of Total Stations
DU Zhi-Gang
2009, 29(5): 517-520
DOI:
A
Abstract
(
1873
)
Case Study on Disease Types and Treatment Measures of Shekoumao Tunnel
ZHAO Xiao-Yong
2009, 29(5): 521-525
DOI:
A
Abstract
(
1899
)
Study on Mechanical Characteristics of Primary Reinforcement of Singlearch #br# Fourlane Highway Tunnels under Different Construction Methods
HUANG Fu, HUANG Bo, YANG Xiao-Li
2009, 29(5): 526-530
DOI:
A
Abstract
(
2334
)
PDF
(1150KB) (
674
)
wenzhang
Analysis on Design of Atrium Structure of a Metro Station in Nanjing Constructed by Cut and Cover Method
LIU Jun, SHEN Xiao-Wei
2009, 29(5): 531-534
DOI:
B
Abstract
(
1911
)
Construction Technology of Long Curved Hoisting Transportation System in Steep Inclined Shafts
LUO Jun-Rong
2009, 29(5): 535-542
DOI:
B
Abstract
(
2450
)
Construction and Cost of ⅠType Slab Ballastless Track in Extralong
Tunnels on ShijiazhuangTaiyuan Passengerdedicated Railway
JIANG Kui, XIAO Qi-Rong, JIANG Ji-Bing
2009, 29(5): 543-547
DOI:
B
Abstract
(
2569
)
Case Study on Arriving Construction Technology of Slurry Shield
Machine with Superlarge Diameter
YANG Ji-Yan
2009, 29(5): 548-551,557
DOI:
B
Abstract
(
2245
)
PDF
(2008KB) (
1566
)
Reassessment and Dynamic Control of Adverse Geological Risks
in Extralong Xuefengshan Railway Tunnel
WANG Jin-Zhi
2009, 29(5): 552-557
DOI:
C
Abstract
(
1822
)
Fullface Advance Grouting for Water Sealing and Reinforcement of Karst Section of Xiangshan Tunnel
HAN Zhi-Huai
2009, 29(5): 558-562
DOI:
B
Abstract
(
2281
)
Technology of GPS Plane Control Survey outside Long |Railway Tunnels
CHEN Xiu-Wen
2009, 29(5): 563-568
DOI:
B
Abstract
(
1860
)
Technology of Topdown Construction of Concrete Lining of Shield
Launching Shaft of Yellow River Crossing Tunnel Project
GAO Jun-Kai, HE Hui-Ping
2009, 29(5): 569-573,581
DOI:
B
Abstract
(
2154
)
PDF
(2574KB) (
1293
)
Optimization of Track Transportation System of Long Steep Inclined Shafts
LI Chang
2009, 29(5): 574-578
DOI:
B
Abstract
(
2003
)
Case Study on Malfunction Diagnosis and Repair of Thrust System of an EPB Shield Machine
WANG Long
2009, 29(5): 579-581
DOI:
B
Abstract
(
2043
)
Application of Multiboom Rock Drilling jumbos in Advance Pre
grouting Hole Drilling during Construction of Mined Tunnels
LOU Zhang-Yin
2009, 29(5): 582-586
DOI:
B
Abstract
(
2442
)
Study on Slurry Gate Repairing Technology of Slurry Shield Machine in Waterrich Soft Ground
LIU Yu-Feng, LI Hai-Bao
2009, 29(5): 587-592
DOI:
B
Abstract
(
2151
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat