Experience of Construction of Long Tunnels by Access from Inclined Shafts
LEI Zhi-Jiang, LUO Chi-Jun
2009, 29(增刊2): 1-6
DOI:
B
Abstract
(
2279
)
PDF
(1672KB) (
1438
)
Discussion on Safety Guarantee Measures during Construction of
Long Tunnels in Complicated Geological Conditions
YANG Xiuquan, PING Zhengjie
2009, 29(增刊2): 7-12
DOI:
A
Abstract
(
2247
)
PDF
(449KB) (
1232
)
Analysis on Major Construction Risks of Extralong Xiangshan Tunnel
LI Hongjun, LIU Chengyu
2009, 29(增刊2): 13-17,73
DOI:
B
Abstract
(
2043
)
PDF
(1370KB) (
1874
)
Discussion on Rapid Construction of Large Crosssection Tunnels on
Passengerdedicated Railways Located in Soft Ground
CHEN Qinghuai, JIANG Yongtao
2009, 29(增刊2): 18-23,44
DOI:
B
Abstract
(
2086
)
PDF
(2111KB) (
1257
)
Analysis on Deformation of Surrounding Rock
Mass Occurring during“Top Heading and Bench&rdquo|
Excavation of Tunnels with High Ground Stress and Large Deformation
WANG Mingsheng
2009, 29(增刊2): 24-28,37
DOI:
B
Abstract
(
2450
)
PDF
(1872KB) (
1579
)
Analysis and Optimized Design of Grout Proportion for
Simultaneous Grouting in Shield Tunnelling
YANG Zhuo, CHEN Hongguang
2009, 29(增刊2): 29-32
DOI:
B
Abstract
(
2196
)
PDF
(1316KB) (
1558
)
Study on Construction Ventilation Technology for Yesanguan
YIN Long
2009, 29(增刊2): 33-37
DOI:
B
Abstract
(
1719
)
PDF
(1112KB) (
1248
)
Application of Combined Boltsin Tunnel Construction
QUAN Min
2009, 29(增刊2): 38-44
DOI:
B
Abstract
(
1839
)
PDF
(3969KB) (
1872
)
Problems and Countermeasures for Invertfilling
Concrete under Durability Requirements
XU Jiang
2009, 29(增刊2): 45-47,51
DOI:
A
Abstract
(
1970
)
PDF
(805KB) (
1507
)
Analysis on Systematic Effect of Pumps and Fans
LIU Xiaopeng
2009, 29(增刊2): 48-51
DOI:
A
Abstract
(
1512
)
PDF
(1468KB) (
1312
)
Study on Waterproofing and Drainage Measures of Jiaozhou Bay Subsea Tunnel
WANG Qian, JING Yongjun
2009, 29(增刊2): 52-57
DOI:
B
Abstract
(
2184
)
PDF
(1910KB) (
1599
)
Case Study on Construction Technology of Huge
Inclined Shafts of Extralong Xiangshan Tunnel
GUO Defu, LI Hongjun| ZHOU Shengxi
2009, 29(增刊2): 58-66
DOI:
B
Abstract
(
2549
)
PDF
(2259KB) (
1583
)
Construction Technology for ThreeLane Highway Tunnels with
Large CrossSections Located in Soft Ground
CHEN Qinghuai
2009, 29(增刊2): 67-73
DOI:
B
Abstract
(
1976
)
PDF
(2347KB) (
1344
)
Case Study on Construction Technology for Deep Weathered
Slots of Xiang'an Subsea Tunnel in Xiamen
SUN Zhenchuan
2009, 29(增刊2): 74-81
DOI:
B
Abstract
(
2251
)
PDF
(2257KB) (
1267
)
Rapid Borehole Drilling Technology for Fullface
Grouting by 3boom Hydraulic Rockdrilling Jumbos
ZHU Qinsheng
2009, 29(增刊2): 82-86
DOI:
B
Abstract
(
2035
)
PDF
(958KB) (
1847
)
Advance Geology Forecasting Technology Used in Tunnel Construction
JI Guanghua
2009, 29(增刊2): 87-91
DOI:
B
Abstract
(
2250
)
PDF
(581KB) (
2113
)
Engineering Characteristics of Gypsum Breccia and Construction
Technology for Tunnels in Gypsum Breccia Ground
LI Jianhua, JIAO Ruihu
2009, 29(增刊2): 92-96
DOI:
B
Abstract
(
2215
)
PDF
(678KB) (
1168
)
Safe and Rapid Construction Technology for Qingdao Jiaozhou
Bay Undersea Tunnel Crossing Fault and Fracture Zone
YANG Zugen
2009, 29(增刊2): 97-98,113
DOI:
B
Abstract
(
2228
)
PDF
(561KB) (
1256
)
Construction Technology for Tunnel Portal
Sections in Unsymmetrical Loaded Mountains
LI Fengguo
2009, 29(增刊2): 99-103,132
DOI:
B
Abstract
(
2058
)
PDF
(2825KB) (
1498
)
Machinery Matching and Construction Organization for Rapid Construction
of Inclined Shafts with Trackless Transportation System
WEI Penghua
2009, 29(增刊2): 104-107
DOI:
B
Abstract
(
2361
)
PDF
(515KB) (
3160
)
Construction Technology for Steep and Curved Inclined
Shaft with Large Crosssection in Waterrich Ground
XIN Guoping, LI Jiguang, LIU Hanhong
2009, 29(增刊2): 108-113
DOI:
B
Abstract
(
2047
)
PDF
(2742KB) (
1274
)
Application of Corekeeping Ring Cut Method in Yangtaishan Tunnel
KANG Tiejun
2009, 29(增刊2): 114-116,176
DOI:
B
Abstract
(
1779
)
PDF
(1487KB) (
1694
)
Grouting Technology for Water/sand Leakage Control in No. 2
Vertical Shaft Section of Shenmu Water Transfer Project
YANG Jianxiong
2009, 29(增刊2): 117-119,188
DOI:
B
Abstract
(
1790
)
PDF
(1171KB) (
1372
)
Safe Construction Technology for |Extralong Tunnels Running
Through Ancient Coal Mines and Coal Mined Goaf
GUO Hai-Po
2009, 29(增刊2): 120-124
DOI:
B
Abstract
(
3170
)
PDF
(1194KB) (
1349
)
Rapid Construction Organization for Long Singletrack Railway
Tunnels with Railbound Transportation System
SHI Wenlin
2009, 29(增刊2): 125-132
DOI:
B
Abstract
(
2083
)
PDF
(2393KB) (
1113
)
Discussion on Conversion of Track Transportation System into
Trackless Transportation System in Long Tunnels
ZHOU Guolong
2009, 29(增刊2): 133-136
DOI:
B
Abstract
(
2207
)
PDF
(1062KB) (
1422
)
Threebench Sixstep Rapid Construction Technology for
Large Span Tunnels in New Loess Ground
ZHU Yangjun, YANG Youquan
2009, 29(增刊2): 137-143,210
DOI:
B
Abstract
(
1985
)
PDF
(2252KB) (
1302
)
Rapid Construction Technology for Tunnels in Fully/Heavilyweathered
Waterrich Sandstone and Waterbearing Sand Strata
GE Quping , LIU Chuanwen
2009, 29(增刊2): 144-147
DOI:
B
Abstract
(
2504
)
PDF
(1489KB) (
1174
)
Fullface Pregrouting to Control Sudden Water Gushing in
Steep Inclined Shaft of Heluoshan Tunnel
ZHOU Guolong
2009, 29(增刊2): 148-152,170
DOI:
B
Abstract
(
1986
)
PDF
(2066KB) (
1276
)
Construction of Yangjiao Tunnel with Large CrossSection
by Double Side Drift Tunneling method
LAN Yang
2009, 29(增刊2): 153-157
DOI:
B
Abstract
(
1888
)
PDF
(857KB) (
1259
)
Construction Technology for Service Tube of Xiang’an
Subsea Tunnel in Xiamen Crossing F1 Deep Weathered Slot
JING Yong-Jun
2009, 29(增刊2): 157-162,183
DOI:
B
Abstract
(
2462
)
PDF
(2066KB) (
1157
)
Construction Technology for Tunnels with Small
Clearance Spacing Located in Soft Ground
HE Haiwei, HU Rusheng
2009, 29(增刊2): 163-166
DOI:
B
Abstract
(
1962
)
PDF
(1161KB) (
1099
)
Construction Technology for ExtraShallow Covered Mined #br# Tunnel on No.3 Line of Chongqing MRT System
DAI Yong, WANG Meng
2009, 29(增刊2): 167-170
DOI:
B
Abstract
(
2291
)
PDF
(1401KB) (
2498
)
wenzhang
Treatment Technology for Sulfureted Hydrogen
Contained Ground in Yufengshan Tunnel
ZHU Yufeng, WANG Jing
2009, 29(增刊2): 171-176
DOI:
B
Abstract
(
1908
)
PDF
(1242KB) (
1299
)
Optimization of Construction Scheme for Xiangshan Railway
Tunnel in Fully Weathered Granitic Porphyry Ground
ZHANG Huashuang
2009, 29(增刊2): 177-180
DOI:
B
Abstract
(
2271
)
PDF
(1253KB) (
1180
)
Discussion on Rapid Construction Technology of Xingwangmao Tunnel
Gao Pan, Pei Zhimin
2009, 29(增刊2): 181-183
DOI:
B
Abstract
(
2108
)
PDF
(551KB) (
1071
)
Construction Schemes of Tunnels with Small Clear
Spacing Located in Different Geology Conditions
CHAI Xilin
2009, 29(增刊2): 184-188
DOI:
B
Abstract
(
2071
)
PDF
(1858KB) (
1247
)
Application of Automatic Grouting Recorder in Grouting
Construction of Tunnel Works
GAO Guangyi, SUN Guoqing
2009, 29(增刊2): 189-192,216
DOI:
B
Abstract
(
1850
)
PDF
(1866KB) (
1872
)
Application of Automatic Grouting Recorder in Grouting#br# Construction of Tunnel Works
FENG Liang
2009, 29(增刊2): 214-216
Abstract
(
1215
)
PDF
(499KB) (
1898
)