Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2009, 29 (增刊2) Published: 30 September 2009
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Experience of Construction of Long Tunnels by Access from Inclined Shafts
LEI Zhi-Jiang, LUO Chi-Jun
2009, 29(增刊2): 1-6
DOI:
B
Abstract
(
2234
)
PDF
(1672KB) (
1361
)
Discussion on Safety Guarantee Measures during Construction of
Long Tunnels in Complicated Geological Conditions
YANG Xiuquan, PING Zhengjie
2009, 29(增刊2): 7-12
DOI:
A
Abstract
(
2182
)
PDF
(449KB) (
1186
)
Analysis on Major Construction Risks of Extralong Xiangshan Tunnel
LI Hongjun, LIU Chengyu
2009, 29(增刊2): 13-17,73
DOI:
B
Abstract
(
1979
)
PDF
(1370KB) (
1626
)
Discussion on Rapid Construction of Large Crosssection Tunnels on
Passengerdedicated Railways Located in Soft Ground
CHEN Qinghuai, JIANG Yongtao
2009, 29(增刊2): 18-23,44
DOI:
B
Abstract
(
2018
)
PDF
(2111KB) (
1143
)
Analysis on Deformation of Surrounding Rock
Mass Occurring during“Top Heading and Bench&rdquo|
Excavation of Tunnels with High Ground Stress and Large Deformation
WANG Mingsheng
2009, 29(增刊2): 24-28,37
DOI:
B
Abstract
(
2401
)
PDF
(1872KB) (
1448
)
Analysis and Optimized Design of Grout Proportion for
Simultaneous Grouting in Shield Tunnelling
YANG Zhuo, CHEN Hongguang
2009, 29(增刊2): 29-32
DOI:
B
Abstract
(
2119
)
PDF
(1316KB) (
1483
)
Study on Construction Ventilation Technology for Yesanguan
YIN Long
2009, 29(增刊2): 33-37
DOI:
B
Abstract
(
1646
)
PDF
(1112KB) (
1104
)
Application of Combined Boltsin Tunnel Construction
QUAN Min
2009, 29(增刊2): 38-44
DOI:
B
Abstract
(
1774
)
PDF
(3969KB) (
1705
)
Problems and Countermeasures for Invertfilling
Concrete under Durability Requirements
XU Jiang
2009, 29(增刊2): 45-47,51
DOI:
A
Abstract
(
1925
)
PDF
(805KB) (
1320
)
Analysis on Systematic Effect of Pumps and Fans
LIU Xiaopeng
2009, 29(增刊2): 48-51
DOI:
A
Abstract
(
1447
)
PDF
(1468KB) (
1262
)
Study on Waterproofing and Drainage Measures of Jiaozhou Bay Subsea Tunnel
WANG Qian, JING Yongjun
2009, 29(增刊2): 52-57
DOI:
B
Abstract
(
2130
)
PDF
(1910KB) (
1328
)
Case Study on Construction Technology of Huge
Inclined Shafts of Extralong Xiangshan Tunnel
GUO Defu, LI Hongjun| ZHOU Shengxi
2009, 29(增刊2): 58-66
DOI:
B
Abstract
(
2491
)
PDF
(2259KB) (
1498
)
Construction Technology for ThreeLane Highway Tunnels with
Large CrossSections Located in Soft Ground
CHEN Qinghuai
2009, 29(增刊2): 67-73
DOI:
B
Abstract
(
1924
)
PDF
(2347KB) (
1186
)
Case Study on Construction Technology for Deep Weathered
Slots of Xiang'an Subsea Tunnel in Xiamen
SUN Zhenchuan
2009, 29(增刊2): 74-81
DOI:
B
Abstract
(
2180
)
PDF
(2257KB) (
1166
)
Rapid Borehole Drilling Technology for Fullface
Grouting by 3boom Hydraulic Rockdrilling Jumbos
ZHU Qinsheng
2009, 29(增刊2): 82-86
DOI:
B
Abstract
(
1969
)
PDF
(958KB) (
1674
)
Advance Geology Forecasting Technology Used in Tunnel Construction
JI Guanghua
2009, 29(增刊2): 87-91
DOI:
B
Abstract
(
2176
)
PDF
(581KB) (
1912
)
Engineering Characteristics of Gypsum Breccia and Construction
Technology for Tunnels in Gypsum Breccia Ground
LI Jianhua, JIAO Ruihu
2009, 29(增刊2): 92-96
DOI:
B
Abstract
(
2146
)
PDF
(678KB) (
1087
)
Safe and Rapid Construction Technology for Qingdao Jiaozhou
Bay Undersea Tunnel Crossing Fault and Fracture Zone
YANG Zugen
2009, 29(增刊2): 97-98,113
DOI:
B
Abstract
(
2156
)
PDF
(561KB) (
1104
)
Construction Technology for Tunnel Portal
Sections in Unsymmetrical Loaded Mountains
LI Fengguo
2009, 29(增刊2): 99-103,132
DOI:
B
Abstract
(
1994
)
PDF
(2825KB) (
1375
)
Machinery Matching and Construction Organization for Rapid Construction
of Inclined Shafts with Trackless Transportation System
WEI Penghua
2009, 29(增刊2): 104-107
DOI:
B
Abstract
(
2312
)
PDF
(515KB) (
3102
)
Construction Technology for Steep and Curved Inclined
Shaft with Large Crosssection in Waterrich Ground
XIN Guoping, LI Jiguang, LIU Hanhong
2009, 29(增刊2): 108-113
DOI:
B
Abstract
(
1994
)
PDF
(2742KB) (
1122
)
Application of Corekeeping Ring Cut Method in Yangtaishan Tunnel
KANG Tiejun
2009, 29(增刊2): 114-116,176
DOI:
B
Abstract
(
1719
)
PDF
(1487KB) (
1485
)
Grouting Technology for Water/sand Leakage Control in No. 2
Vertical Shaft Section of Shenmu Water Transfer Project
YANG Jianxiong
2009, 29(增刊2): 117-119,188
DOI:
B
Abstract
(
1727
)
PDF
(1171KB) (
1245
)
Safe Construction Technology for |Extralong Tunnels Running
Through Ancient Coal Mines and Coal Mined Goaf
GUO Hai-Po
2009, 29(增刊2): 120-124
DOI:
B
Abstract
(
3085
)
PDF
(1194KB) (
1262
)
Rapid Construction Organization for Long Singletrack Railway
Tunnels with Railbound Transportation System
SHI Wenlin
2009, 29(增刊2): 125-132
DOI:
B
Abstract
(
2005
)
PDF
(2393KB) (
1043
)
Discussion on Conversion of Track Transportation System into
Trackless Transportation System in Long Tunnels
ZHOU Guolong
2009, 29(增刊2): 133-136
DOI:
B
Abstract
(
2133
)
PDF
(1062KB) (
1273
)
Threebench Sixstep Rapid Construction Technology for
Large Span Tunnels in New Loess Ground
ZHU Yangjun, YANG Youquan
2009, 29(增刊2): 137-143,210
DOI:
B
Abstract
(
1925
)
PDF
(2252KB) (
1116
)
Rapid Construction Technology for Tunnels in Fully/Heavilyweathered
Waterrich Sandstone and Waterbearing Sand Strata
GE Quping , LIU Chuanwen
2009, 29(增刊2): 144-147
DOI:
B
Abstract
(
2443
)
PDF
(1489KB) (
1112
)
Fullface Pregrouting to Control Sudden Water Gushing in
Steep Inclined Shaft of Heluoshan Tunnel
ZHOU Guolong
2009, 29(增刊2): 148-152,170
DOI:
B
Abstract
(
1916
)
PDF
(2066KB) (
1152
)
Construction of Yangjiao Tunnel with Large CrossSection
by Double Side Drift Tunneling method
LAN Yang
2009, 29(增刊2): 153-157
DOI:
B
Abstract
(
1833
)
PDF
(857KB) (
1188
)
Construction Technology for Service Tube of Xiang’an
Subsea Tunnel in Xiamen Crossing F1 Deep Weathered Slot
JING Yong-Jun
2009, 29(增刊2): 157-162,183
DOI:
B
Abstract
(
2396
)
PDF
(2066KB) (
1001
)
Construction Technology for Tunnels with Small
Clearance Spacing Located in Soft Ground
HE Haiwei, HU Rusheng
2009, 29(增刊2): 163-166
DOI:
B
Abstract
(
1919
)
PDF
(1161KB) (
1069
)
Construction Technology for ExtraShallow Covered Mined
Tunnel on No.3 Line of Chongqing MRT System
DAI Yong, WANG Meng
2009, 29(增刊2): 167-170
DOI:
B
Abstract
(
2226
)
PDF
(1401KB) (
2254
)
Treatment Technology for Sulfureted Hydrogen
Contained Ground in Yufengshan Tunnel
ZHU Yufeng, WANG Jing
2009, 29(增刊2): 171-176
DOI:
B
Abstract
(
1831
)
PDF
(1242KB) (
1078
)
Optimization of Construction Scheme for Xiangshan Railway
Tunnel in Fully Weathered Granitic Porphyry Ground
ZHANG Huashuang
2009, 29(增刊2): 177-180
DOI:
B
Abstract
(
2198
)
PDF
(1253KB) (
1085
)
Discussion on Rapid Construction Technology of Xingwangmao Tunnel
Gao Pan, Pei Zhimin
2009, 29(增刊2): 181-183
DOI:
B
Abstract
(
2046
)
PDF
(551KB) (
974
)
Construction Schemes of Tunnels with Small Clear
Spacing Located in Different Geology Conditions
CHAI Xilin
2009, 29(增刊2): 184-188
DOI:
B
Abstract
(
2007
)
PDF
(1858KB) (
1095
)
Application of Automatic Grouting Recorder in Grouting
Construction of Tunnel Works
GAO Guangyi, SUN Guoqing
2009, 29(增刊2): 189-192,216
DOI:
B
Abstract
(
1802
)
PDF
(1866KB) (
1735
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat