Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2007, 27 (6) Published: 20 December 2007
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Analysis on Technical Difficulties of Superlong Underwater
Shieldbored Tunnels with Large Crosssections: Case Study on Shiziyang
Tunnel on GuangzhouShenzhenHong Kong Passengerdedicated Railway
HONG Kai-Rong
2007, 27(6): 1-3,18
DOI:
A
Abstract
(
2355
)
PDF
(929KB) (
2112
)
Key Issues of Applying Muddingtype EPB Shields to
Sandy Cobble Ground in Chengdu, China
HE Chuan, YAN Qi-Xiang
2007, 27(6): 4-6,29
DOI:
B
Abstract
(
1903
)
PDF
(1290KB) (
1597
)
Matching between Thrust Speed of Main Shield
Machine and Capacity of Slurry System
ZHANG Ning-Chuan
2007, 27(6): 7-9
DOI:
B
Abstract
(
1867
)
PDF
(390KB) (
1333
)
Study on Geological Investigation Methods for
Shield Tunneling in Mixed Ground
JU Shi-Jian, DU Wei-Ban
2007, 27(6): 10-14
DOI:
A
Abstract
(
1859
)
PDF
(1790KB) (
1334
)
Mechanical Analysis of Double Screw Conveyors in
Earth Pressure Balance Shield Boring
JIANG Yu-Sheng, CHEN Dong, WANG Chun-He, YANG Zhi-Yong, LIU Pin
2007, 27(6): 15-18
DOI:
A
Abstract
(
2493
)
PDF
(699KB) (
1317
)
Equipment Configuration and Thrust Force Calculation for
Muddingtype EPB Shield Machines in Sandy Cobble Ground
YAN Qi-Xiang, Geng-Ping, HE Chuan
2007, 27(6): 19-21
DOI:
A
Abstract
(
2280
)
PDF
(497KB) (
1087
)
Type Selection of Fullface Tunnel Boring Machines (TBMs)
JU Shi-Han
2007, 27(6): 22-23
DOI:
B
Abstract
(
1984
)
PDF
(289KB) (
950
)
Study on Segment Arrangement on Transition
Curves of Shieldbored Tunnels
HOU Gang
2007, 27(6): 24-25,38
DOI:
A
Abstract
(
2217
)
PDF
(982KB) (
2429
)
Mechanical Analysis on Cutter Failures of Hard Rock TBMs
DONG Tian-Hong
2007, 27(6): 26-29
DOI:
B
Abstract
(
1645
)
PDF
(726KB) (
719
)
Numerical Simulation of Surface Settlement Caused by
Soil Pressure in ShieldTunneling
LIU Jian-Hai
2007, 27(6): 30-32
DOI:
A
Abstract
(
2004
)
PDF
(1093KB) (
1230
)
Study on Realtime Attitude Survey of Shield Machines for Metro Works
WANG Chao-Ling, ZHANG Yong-Chao
2007, 27(6): 33-35,38
DOI:
A
Abstract
(
1867
)
PDF
(849KB) (
1229
)
Study on Design of TBM Assemble Cavern of Drain
Tunnel in JinpingⅡ Hydropower Project
SU Li-Jun, Liu-Li-Xin
2007, 27(6): 36-38
DOI:
B
Abstract
(
1884
)
PDF
(804KB) (
1176
)
Shield Construction Technology for Rivercrossing Tunnel of Shenyang Metro
XIE Kang-Kai
2007, 27(6): 39-42
DOI:
B
Abstract
(
2250
)
PDF
(979KB) (
1169
)
Slurry Shield Construction Technology for Launching Section of
South Railway Station~Provincial Stadium
Running Tunnel of Chengdu Metro
YANG Shu-Jiang
2007, 27(6): 43-46
DOI:
B
Abstract
(
1947
)
PDF
(1412KB) (
1054
)
Costefficient Regeneration of Bore Slurry for Driving of Weser Tunnel
HE Er-Mu-Te-·Ge-Luo-Shi
2007, 27(6): 47-51
DOI:
B
Abstract
(
1677
)
PDF
(2509KB) (
857
)
Construction Technology for EPB Shield Crossing Xinzaohai
under Complex Geological Conditions
WANG Meng-Qing, XU Jun-Zhe, Ni-Bing-Yu
2007, 27(6): 52-56,62
DOI:
B
Abstract
(
2234
)
PDF
(1547KB) (
1106
)
On Shield Construction Technology for Yellow River Crossing Tunnel of
Middle Line of SouthNorth Water Transferring Project
CA Hui, LI Rong-Zhi
2007, 27(6): 57-62
DOI:
B
Abstract
(
1916
)
PDF
(1732KB) (
1186
)
Application of Fiberreinforced Foamed Urethane (FFU) in Shield Tunneling
ZHANG Jun, HE Zhen-Hua
2007, 27(6): 63-65,75
DOI:
B
Abstract
(
1779
)
PDF
(1415KB) (
1039
)
Application of Slurry Treatment Technology in Construction of
Tunnels Bored by Slurry Shield Machines
BAO Li
2007, 27(6): 66-70,104
DOI:
B
Abstract
(
1801
)
PDF
(2422KB) (
2242
)
Refurbishment of S259 Slurry Balanced Shield Machine
CHEN Jian, ZHANG Ning-Chuan, LV Jian-Le
2007, 27(6): 71-75
DOI:
B
Abstract
(
2600
)
PDF
(1714KB) (
1206
)
Brief Discussion on Cutter Head Vibration of Type 803E TBM
ZHANG Gong-Xing, ZHANG Ning-Chuan
2007, 27(6): 76-78,111
DOI:
A
Abstract
(
1641
)
PDF
(1829KB) (
1223
)
Improvement and Application of Disc Cutter
CHAO Huan-Qing, WANG Han-Zhang
2007, 27(6): 79-82
DOI:
B
Abstract
(
1601
)
PDF
(1142KB) (
1033
)
Tunnel Boring Machine (TBM) Repairing Technology
DONG Tian-Hong
2007, 27(6): 83-85,104
DOI:
B
Abstract
(
2080
)
PDF
(582KB) (
1441
)
Practical Technology for Status Monitoring and Malfunction
Diagnosis of Equipment of TBMs and Shield Machines
LIU Hong-Zhi
2007, 27(6): 86-88,97
DOI:
B
Abstract
(
2177
)
PDF
(854KB) (
1679
)
Analysis and Study on Wearing of Cutting Tools of
Shield Machines Used in Chengdu Metro Construction
LIU Gao-Feng, Song-Tian-Tian
2007, 27(6): 89-93
DOI:
A
Abstract
(
2166
)
PDF
(3094KB) (
1617
)
Practice of and Comments on Tunnel Boring
Machines (TBMs) Manufacturing Supervision
HUANG Beng-Hua
2007, 27(6): 94-97
DOI:
B
Abstract
(
1940
)
PDF
(820KB) (
1332
)
Practice of Risk Identification and Assessment of
Shield Tunnelling in Chengdu Metro
XU Run-Ze, SONG Tian-Tian
2007, 27(6): 98-100,104
DOI:
A
Abstract
(
2278
)
PDF
(1264KB) (
1462
)
Analysis on Chinese Construction Enterprises’Shield
Tunnelling Technology Development Strategy
JIN Shi-He
2007, 27(6): 101-104
DOI:
C
Abstract
(
1975
)
PDF
(475KB) (
1048
)
Cost Budgeting and Quota Analysis for Shield Tunneling
Works in Different Cities in China
JIANG Hong-Jun
2007, 27(6): 105-107,111
DOI:
C
Abstract
(
2388
)
PDF
(713KB) (
1810
)
Preparation of Estimated Total Cost for TBMdriven Tunnel Works
TUN Wen-Juan, WANG Yong
2007, 27(6): 108-111
DOI:
C
Abstract
(
1684
)
PDF
(1015KB) (
1651
)
Transportation of Large Parts of TBMs
TAO Xin-Chang
2007, 27(6): 112-113
DOI:
B
Abstract
(
1683
)
PDF
(287KB) (
1377
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat