Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2008, 28 (1) Published: 20 February 2008
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Considerations in Construction of Passenger Dedicated Railway
Tunnels with Large Crosssections in Soft Rock Mass
Zhang Wei
2008, 28(1): 6-10
DOI:
A
Abstract
(
1836
)
PDF
(549KB) (
820
)
New Austrian Tunneling Method and its Development
ZHU Hanhua,YANG Jianhui,SHANG Yuequan
2008, 28(1): 11-14
DOI:
A
Abstract
(
1562
)
PDF
(479KB) (
1704
)
Study on CRD Construction Method for Longdistance
Fullyheavily Weathered Ground of Subsea Tunnel
SUN Zhenchuan
2008, 28(1): 15-18
DOI:
B
Abstract
(
1942
)
PDF
(832KB) (
1247
)
Effect Analysis on Application of Largediameter
Ducts in Ventilation of Underground Caverns
WANG Li, XIE Xianping, HE Sunwen, LI Xuelin
2008, 28(1): 19-21
DOI:
A
Abstract
(
1581
)
PDF
(298KB) (
917
)
Design of Fireresistant Asphalt Pavements for Highway Tunnels
DING Qingjun, LIU Xinquan, HU Shuguang, FANG Yang
2008, 28(1): 22-24,92
DOI:
A
Abstract
(
1803
)
PDF
(871KB) (
1127
)
Technical Optimization and Profit of Urban Metro
Cutandcover and Mining Works Based on Lump Sum Contract
GUO Weishe
2008, 28(1): 25-28,33
DOI:
B
Abstract
(
1912
)
PDF
(1435KB) (
1280
)
Waterproofing and Drainage Design of Jiaozhouwan
Subsea Tunnel in Qingdao, China
TAN Zhiwen
2008, 28(1): 29-33
DOI:
B
Abstract
(
2150
)
PDF
(1293KB) (
1179
)
Geotechnical Investigations for Chengdu Metro Works
LI Jianqiang
2008, 28(1): 34-39
DOI:
A
Abstract
(
2479
)
PDF
(812KB) (
1344
)
Energysaving Design of Electrical Systems of Metro Works
YANG Yunguang
2008, 28(1): 40-42
DOI:
B
Abstract
(
1658
)
PDF
(339KB) (
843
)
Several Detailed Issues in Design of Water Supply and
Drainage Systems of Metro Stations
SU Juqin
2008, 28(1): 43-45,65
DOI:
B
Abstract
(
1848
)
PDF
(1743KB) (
1751
)
Design and Construction of Tunnels by means of ADECORS Approach
ZHAI Jinying, YANG Huijun, WANG Lili
2008, 28(1): 46-50,55
DOI:
B
Abstract
(
2302
)
PDF
(1666KB) (
3490
)
Key Construction Technology for Largespanned Highway
Tunnels under Complex Environment
GAO Haihong
2008, 28(1): 51-55
DOI:
B
Abstract
(
2515
)
PDF
(1950KB) (
1178
)
Waterproofing and Drainage Technology of
Xiang’an Subsea Tunnel in Xiamen
MU Song, LI Jianbin
2008, 28(1): 56-60,73
DOI:
B
Abstract
(
1896
)
PDF
(1770KB) (
1180
)
Case Study on Construction Technology for Rock Anchor
Beam of Xiaowan Underground Powerhouse
XU Ping, ZHU Baofan
2008, 28(1): 61-65
DOI:
B
Abstract
(
1759
)
PDF
(1390KB) (
1139
)
Tunneling across Deep Weathered Channel: Case Study on
Xiang’an Subsea Tunnel in Xiamen, China
ZHAO Taidong
2008, 28(1): 66-69,81
DOI:
B
Abstract
(
1766
)
PDF
(2363KB) (
1426
)
Case Study on Design and Construction Technology for Track
Haulage Hoist System of Huge Inclined Shaft
ZHONG Youxin, GUO Defu, LUO Caoyuan
2008, 28(1): 70-73
DOI:
B
Abstract
(
2085
)
PDF
(1005KB) (
1214
)
Study on Key Technologies for Fast and Safe
Construction of Deepburied Long Tunnels
HOU Yonghe, HU Weidong, CHEN Shougen
2008, 28(1): 74-77
DOI:
B
Abstract
(
2420
)
PDF
(862KB) (
2005
)
Construction and Quality Control of Excavation and
Primary support of Huge Highway Tunnels
WANG Yujun, CAI Zhenyu
2008, 28(1): 78-81
DOI:
B
Abstract
(
2286
)
PDF
(564KB) (
1549
)
Protective Measures for Construction of Metro
Station Located above Existing Metro Line
ZHAI Yunming
2008, 28(1): 82-84,92
DOI:
B
Abstract
(
1723
)
PDF
(1781KB) (
955
)
Case Study on Construction Joint Waterproofing
Methods of Beijing Metro Works
MENG Haifeng
2008, 28(1): 85-88
DOI:
B
Abstract
(
1913
)
PDF
(667KB) (
1038
)
Construction Plan of Collapse Treatment of Nama Tunnel
SHI Lei
2008, 28(1): 89-92
DOI:
B
Abstract
(
1862
)
PDF
(956KB) (
1081
)
Application of TMS in Construction Survey of Tunnel Transition Sections
ZHANG Xueqiang
2008, 28(1): 93-96
DOI:
B
Abstract
(
1349
)
PDF
(2006KB) (
964
)
Establishment and Practice of Quality Control/detection System of
Construction Process of Long and Huge Tunnels
CAO Jianping, WANG Rongjin,CAO Daming
2008, 28(1): 97-101
DOI:
C
Abstract
(
2318
)
PDF
(1880KB) (
1012
)
Construction Quality Control of Castinsitu Bored Piles
DING Wenyi
2008, 28(1): 102-104,113
DOI:
B
Abstract
(
1851
)
PDF
(716KB) (
1252
)
Translation and Reinforcement of Left Tgirder of Existing Wenfan
Bridge on WuKang Doubletrack Railway Project
SONG Haitao
2008, 28(1): 105-109
DOI:
B
Abstract
(
2169
)
PDF
(1569KB) (
1819
)
Construction Technology for Start Element of Castinsitu Continuous
Tshaped Girder of Daqiaoxiang Bridge
DU Zhongqiu
2008, 28(1): 110-113
DOI:
B
Abstract
(
1807
)
PDF
(671KB) (
1050
)
Discussion on Quality Control of Lime Improved Soil
ZHANG Xun, NIU Tianpei
2008, 28(1): 114-116
DOI:
B
Abstract
(
1703
)
PDF
(345KB) (
1684
)
Comments on Contractor’s Material Supply and Management
GUO Guangxu
2008, 28(1): 117-119,122
DOI:
C
Abstract
(
1773
)
PDF
(867KB) (
1356
)
Simple Analysis on Importance of Safety Culture Establishing in Enterprises
YANG Yanping
2008, 28(1): 120-122
DOI:
C
Abstract
(
1514
)
PDF
(337KB) (
878
)
Comments on Influences on Tendering Imposed by
Characteristic Enterprise Cultures
YANG Changjiao
2008, 28(1): 123-125
DOI:
C
Abstract
(
1079
)
PDF
(341KB) (
889
)
Modernization Management of File Information Resources
PANG Ran
2008, 28(1): 126-127
DOI:
C
Abstract
(
889
)
PDF
(408KB) (
820
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat