Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2010, 30 (5) Published: 15 October 2010
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Study on Optimization of Construction Technology and Construction
Parameters for Advance Large Pipe Roof Support
SUN Guo-Qiang
2010, 30(5): 495-507
Abstract
(
2206
)
PDF
(2112KB) (
1209
)
Analysis on Dynamic Seismic behavior and Stability of Intersection Parts of
Shallowcovered Exit/Entrance Tunnels of Metro Works
ZHANG Hua-Jun, Wang-Zhi-Yong
2010, 30(5): 498-502
Abstract
(
1751
)
PDF
(3851KB) (
1293
)
Study on Ventilation of Extralong Tunnel on West Line of Southtonorth
Water Transfer Project Constructed by TBM
XIAO Yuan-Beng, Li-Yun
2010, 30(5): 503-507
Abstract
(
1967
)
PDF
(1589KB) (
1298
)
Study on Arrangement Rules and Arrangement Optimization of Shield Cutters
YAN Yu-Ru, Huang-Hong-Wei, Cheng-Zhi-Yan, Wang-Ju, Zhou-Xin, Lv-E-Lin
2010, 30(5): 508-512,599
Abstract
(
2349
)
PDF
(6396KB) (
1029
)
Risk Factors and Countermeasures for Metro Stations Constructed by
Enlarging Shieldbored Tunnels
GAO Ai-Lin, JIN Huai
2010, 30(5): 513-517
Abstract
(
2016
)
PDF
(2753KB) (
864
)
Analysis on Adaptability of Cutter Configuration of Largediameter
Slurry Shield in Sandy Cobble Stratum
ZHANG Bing, Li-Jian-Hua
2010, 30(5): 518-521,611
Abstract
(
2205
)
PDF
(1728KB) (
1321
)
Study on Method to Calculate Air Resistance Caused by Single Train
Running through Long Railway Tunnels without Auxiliary adit
SHI Xian-Meng, MO Xiao-Yan, TUN Jian
2010, 30(5): 522-527
Abstract
(
2087
)
PDF
(1887KB) (
1330
)
Calculation and Monitoring Result Analysis of Stress and Deformation of
Rock Anchor Beam of Large Span Underground Power Plant
LIU Wen
2010, 30(5): 528-534,585
Abstract
(
1829
)
PDF
(3485KB) (
1405
)
Nonlinear Regression Analysis on Steady Deformation of Surrounding
Rocks of Tunnel Portal Sections
LI Xian-Min, Liang-Yan-Hui , Wang-Meng-Shu
2010, 30(5): 535-539,568
Abstract
(
2232
)
PDF
(4261KB) (
1281
)
Case Study on Safety Monitoring during Construction of Deep Foundation
Pit of South Anchorage of Nanjing Fourth Yangtze River Bridge
BAI Xue-Meng
2010, 30(5): 540-545,585
Abstract
(
2206
)
PDF
(5605KB) (
1704
)
Design of Shield Arriving Shaft in Complex Environment
XIE Ming, Meng-Wei
2010, 30(5): 546-548,553
Abstract
(
2002
)
PDF
(3931KB) (
1635
)
Fullbreadth Tunnel Invert Construction Technology
HAN Xing-Dun, Fang-Dun-Bei, Lei-Zhi-Jiang, Li-Ji-Guang
2010, 30(5): 549-553
Abstract
(
1632
)
PDF
(1958KB) (
1141
)
Construction Technology for Largespanned Overlapped Tunnel by Mining
Method: Case Study on a Tunnel on Chongqing Rail Transit Line
LI Feng-Guan
2010, 30(5): 554-560
Abstract
(
2235
)
PDF
(5809KB) (
1914
)
Deformation Control Technology for Shallowcovered DoubleTrack
Railway Tunnels underneath Buildings
XU Dai-Hong- , Liu-Cheng-Yu
2010, 30(5): 561-564,595
Abstract
(
2217
)
PDF
(1417KB) (
870
)
Shield Arriving by Simulating Boring under River
ZHOU De-Wu
2010, 30(5): 565-568
Abstract
(
2034
)
PDF
(1173KB) (
873
)
Development of Ventilation Methods for Mountaincrossing
Tunnels during Construction
LI Yong-Sheng
2010, 30(5): 569-572,581
Abstract
(
1818
)
PDF
(1792KB) (
1472
)
Construction Technology for Fault and Fracture
Section of Xiapu Railway Tunnel
WANG Hua-Zhong
2010, 30(5): 573-576
Abstract
(
1933
)
PDF
(4114KB) (
1581
)
Technology of Rebar Connecting by Sleeves and Its
Application in Baotaishan Railway Tunnel
WANG Jin-Zhi, Gong-Guo-Qiang
2010, 30(5): 577-581
Abstract
(
1783
)
PDF
(2144KB) (
1128
)
Construction Technology for Tunnel Invert in Swelling Soil
CHEN Hong, HONG Da-Xin
2010, 30(5): 582-585
Abstract
(
1965
)
PDF
(2396KB) (
1153
)
Application of Safety Monitoring System in High Gas
Concentration Lot of Sanlian Tunnel
LIU Dan-Lei, Luo-Tie-Fu, Shu-Tong-Hua
2010, 30(5): 586-590
Abstract
(
1842
)
PDF
(1709KB) (
1132
)
Application of Liquid Nitrogen Freezing Technology in Maintaining of
Tail Skin Brushes in Stratum with Confined Water
HE Tian-Ming
2010, 30(5): 591-595
Abstract
(
1823
)
PDF
(2406KB) (
961
)
Application of Freezing Method in Recovery of Rivercrossing Tunnel
CHU Yan-Po, Shu-Bang-Yong, Zhang-Ying-Jun, XU Guo-Qiang
2010, 30(5): 596-599
Abstract
(
2476
)
PDF
(3518KB) (
1728
)
Safe "Drill and Blast" Driving Technology for Large Crosssection
Subsea Tunnels under Complex Geological Conditions
LIANG Hai-Jing
2010, 30(5): 600-607
Abstract
(
2182
)
PDF
(3394KB) (
1330
)
Risk Analysis and Risk Control Technology for Shield
Tunneling in Guangzhou Region
ZHOU Zhi-Jiang, Zhong-Xian-Ai, SONG Jin-Liang- , Chen-Xing
2010, 30(5): 608-611
Abstract
(
2127
)
PDF
(1788KB) (
1133
)
Shield Cutterhead Repairing Technology
ZHONG Zhi-Jiang
2010, 30(5): 612-615,620
Abstract
(
2054
)
PDF
(4806KB) (
1700
)
Manufacture of Mobile Shotcreting Platform and Its Application in
Construction of Qinling Extralong Tunnel
ZHANG Dong-Beng
2010, 30(5): 616-620
Abstract
(
1940
)
PDF
(3277KB) (
893
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat