Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2011, 31 (6) Published: 20 December 2011
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Energy Saving, Carbon Emission Reduction and Environment Protection in Underground Space/Rail Transit Works in Urban Area
SUN Jun
2011, 31(6): 643-647
Abstract
(
6327
)
PDF
(910KB) (
1555
)
Comments on Risk Management in Construction of Tunnels and Underground Works
GUO Shanyun
2011, 31(6): 648-651
Abstract
(
3348
)
PDF
(1572KB) (
1250
)
Geological Conditions and Construction Countermeasures of Weisanlu Rivercrossing Shieldbored Tunnel in Nanjing
SHI Xindong, WU Quanli
2011, 31(6): 652-656
Abstract
(
2746
)
PDF
(1250KB) (
1403
)
Application of Marine Seismic Reflection CDP Stacking Technology in Detection of Weathered Granite Boulder: Case Study onWater Intake Tunnels of Taishan Nuclear Power Station
LIU Hongyue, LIANG Kuisheng, DUAN Jianzhuang
2011, 31(6): 657-661
Abstract
(
2009
)
PDF
(1235KB) (
1173
)
Seismic Calculation for Immersed Tunnels in Stratum Subject to Serious Liquefaction
HE Weiguo
2011, 31(6): 662-667
Abstract
(
1897
)
PDF
(3757KB) (
1250
)
Study on Key Technologies for Structural Design of Largespan Forked Tunnel
BI Qiang, WU Jingang
2011, 31(6): 668-677
Abstract
(
1913
)
PDF
(1519KB) (
1211
)
Key Technology of Mucking by Continuous Conveyor Belt: Case Study on West Qinling Extralong Tunnel
XU Jinlin, XU Zan, WANG Yanbo
2011, 31(6): 678-685
Abstract
(
2125
)
PDF
(1291KB) (
1566
)
Interpretation of Interfering Factors in Detection by Geological Radar
LU Jianbang
2011, 31(6): 686-689
Abstract
(
1458
)
PDF
(691KB) (
1056
)
Mechanisms and Countermeasures for Tunnel Damping and Slipping: Case Study on Baojiashan Tunnel
ZHU Xufei, LEI Jia, HU Ping
2011, 31(6): 690-692
Abstract
(
1893
)
PDF
(440KB) (
1155
)
Case Study on Design of Semi Cover and Cut Construction of Metro Station
RUAN Guoyong
2011, 31(6): 693-700
Abstract
(
1847
)
PDF
(1137KB) (
1106
)
Key Technology for Manufactory Prefabrication of Tube Elements of Largescale Immersed Tunnels
XIAO Xiaochun
2011, 31(6): 701-705
Abstract
(
1594
)
PDF
(815KB) (
1206
)
TBM Tunneling Technology in Weak Phyllite Section
ZHANG Xuejun, HU Bifei
2011, 31(6): 706-711
Abstract
(
1890
)
PDF
(954KB) (
1308
)
Driving Methods of Inclined Shafts
MU Qianxiang
2011, 31(6): 712-716
Abstract
(
4136
)
PDF
(748KB) (
1276
)
Technology for Manufacturing and Hoisting of Rebar Cages for Extremelydeep Diaphragm Walls
LI Shaoli
2011, 31(6): 717-721
Abstract
(
1945
)
PDF
(885KB) (
1503
)
Case Study on Shield Boring Underneath and in Close Proximity to Large Sewage Pipeline
LIU Shuquan, GUAN Lijuan
2011, 31(6): 722-727
Abstract
(
2439
)
PDF
(1064KB) (
1163
)
Construction Technology for Connection Section between Inclined Shaft and Main Tunnel: Case Study on Taoshuping Tunnel
ZHANG Xuewen, WANG Meng,ZHAO Xupeng
2011, 31(6): 728-732
Abstract
(
1864
)
PDF
(773KB) (
1204
)
Technology for TBM Tunneling Through Jointdenselydeveloped Granite Sections
DENG Qingli
2011, 31(6): 733-736
Abstract
(
1810
)
PDF
(598KB) (
1246
)
Technology for Assembling of New Type of Lining Formwork Trolley in Tunnel
XING Bo, YAO Yu
2011, 31(6): 737-742
Abstract
(
1963
)
PDF
(2378KB) (
1154
)
Optimization of Construction Schemes of “Stationbridgecombined” Metro Station Constructed by Cover and Cut Method
LIU Suming, SHI Daqiang
2011, 31(6): 743-748
Abstract
(
2026
)
PDF
(940KB) (
1234
)
TBM Stepping Technology: Case Study on West Qinling Tunnel
LI Nanchuan
2011, 31(6): 749-754
Abstract
(
1877
)
PDF
(903KB) (
1311
)
Development of DongfanghongWZJ300 Tunnel Heading and Loading Machine
LUAN Xinli, HU Bo
2011, 31(6): 755-759
Abstract
(
3008
)
PDF
(807KB) (
1198
)
Improving Reliability of Communication of Control Systems of Shield Machines Based on CAN Bus
ZHANG Hepei, HAN Weifeng, ZHANG Bing
2011, 31(6): 760-764
Abstract
(
1501
)
PDF
(784KB) (
1199
)
Design of Automatic Belt Releasing and Withdrawing Device and ItsApplication Result
WANG Yanbo
2011, 31(6): 765-769
Abstract
(
2082
)
PDF
(985KB) (
1185
)
Key Points of Construction and Routine Maintenance of Invert Segment Precasting Plants
XU Zan, HU Bifei
2011, 31(6): 770-776
Abstract
(
1719
)
PDF
(1069KB) (
1153
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat