Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2012, 32 (5) Published: 20 October 2012
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Development of Decision Analysis System for Design and Execution of Shield Launching and Arrival
ZHU Shiyou,LI Yuanhai,LIN Zhibin
2012, 32(5): 613-618
DOI:
10.3973/j.issn.1672-741X.2012.05.001
Abstract
(
1556
)
PDF
(3485KB) (
1521
)
Prevention and Control of Factors That Have Influence on Occupational Health in Construction of Tunnels and Underground Works
YAO Yunxiao
2012, 32(5): 619-625
DOI:
10.3973/j.issn.1672-741X.2012.05.002
Abstract
(
2524
)
PDF
(1418KB) (
1531
)
Study on Influence of Water Level Fluctuation on Shieldbored Tunnel
LI Chunliang, WANG Yong, ZHANG Wei
2012, 32(5): 626-630
DOI:
10.3973/j.issn.1672-741X.2012.05.003
Abstract
(
2686
)
PDF
(973KB) (
1437
)
Optimization of Construction Order of Metro Tunnel and Adjacent High Building
WANG Chao, WU Xiaoli
2012, 32(5): 631-642
DOI:
10.3973/j.issn.1672-741X.2012.05.004
Abstract
(
1733
)
PDF
(3434KB) (
1613
)
Technology for Geophysical Prospecting of Blasting and Grouting Effects of Bed Rocks
DANG Rujiao
2012, 32(5): 643-648
DOI:
10.3973/j.issn.1672-741X.2012.05.005
Abstract
(
1738
)
PDF
(1586KB) (
1162
)
Studies on Fragmentation Zone Distribution Laws of Deep Tunnel Based on DruckerPrager Yield Criterion
LU Wen, GU Shaofeng, HOU Yirun
2012, 32(5): 649-653
DOI:
10.3973/j.issn.1672-741X.2012.05.006
Abstract
(
1776
)
PDF
(985KB) (
1447
)
Biaxial Tensioning Test on PE Geomembrane
ZHANG Siyun, LU Weitao, JIN Xiangyu
2012, 32(5): 654-657
DOI:
10.3973/j.issn.1672-741X.2012.05.007
Abstract
(
1334
)
PDF
(579KB) (
1227
)
Study on Design of Composite Lining with Its Primary Support as Loadbearing Structure
LUO Zhangbo
2012, 32(5): 658-664
DOI:
10.3973/j.issn.1672-741X.2012.05.008
Abstract
(
3109
)
PDF
(1632KB) (
1447
)
Case Study on Design of Rockfall Protection Structure in Vshaped Gully
LIU Jianhong
2012, 32(5): 665-669
DOI:
10.3973/j.issn.1672-741X.2012.05.009
Abstract
(
1591
)
PDF
(2833KB) (
1457
)
Design and Construction of Underground Ventilation Equipment Chamber of Huayingshan Superlong Highway Tunnel
XIONG Wenliang
2012, 32(5): 670-674
DOI:
10.3973/j.issn.1672-741X.2012.05.010
Abstract
(
1656
)
PDF
(1121KB) (
1705
)
Construction Technology for Deep Foundation Pit of Largescale Passengerdedicated Railway Station Adjacent to CBD Building Group in Urban Area
LIU Gang, LI Lapu
2012, 32(5): 675-681
DOI:
10.3973/j.issn.1672-741X.2012.05.011
Abstract
(
2010
)
PDF
(1778KB) (
1310
)
Dismantling Technology for Temporary Support of Largespan Ventilation Tunnel under Shallow Cover
YANG Huijun, WANG Mengshu
2012, 32(5): 682-685
DOI:
10.3973/j.issn.1672-741X.2012.05.012
Abstract
(
2539
)
PDF
(1505KB) (
1674
)
Application of Nonoriented Traverse in Surveying of Guangzhou Metro
WEI Benxian, JIANG Zongquan
2012, 32(5): 686-689
DOI:
10.3973/j.issn.1672-741X.2012.05.013
Abstract
(
1475
)
PDF
(534KB) (
1791
)
Key Construction Technologies of Superlarge TunnelFoundation Pit Adjacent to Existing Operating Railway
MA Hongjian
2012, 32(5): 690-695
DOI:
10.3973/j.issn.1672-741X.2012.05.014
Abstract
(
1459
)
PDF
(1401KB) (
1507
)
Application of Grouting Consolidation Technology in Sandy Cobble Strata in Chengdu
WANG Guoyi
2012, 32(5): 696-699
DOI:
10.3973/j.issn.1672-741X.2012.05.015
Abstract
(
1717
)
PDF
(2060KB) (
1847
)
Boulder Prospecting Technologies for Seacrossing Shield Tunneling
YANG Yazhang
2012, 32(5): 700-704
DOI:
10.3973/j.issn.1672-741X.2012.05.016
Abstract
(
1627
)
PDF
(2816KB) (
1376
)
Case Study on Blasting Demolition of Waterstopping Wall of Xiangshan Tunnel
ZHAO Dongbo, LI Hongjun
2012, 32(5): 705-708
DOI:
10.3973/j.issn.1672-741X.2012.05.017
Abstract
(
4058
)
PDF
(1336KB) (
1176
)
Application of Raiseboring Method in Construction of Underground Watersealing Caverns
GUO Defu, ZHANG Hui
2012, 32(5): 709-712
DOI:
10.3973/j.issn.1672-741X.2012.05.018
Abstract
(
2165
)
PDF
(722KB) (
1373
)
Technology for Enlarging and Supportreplacing of Deep Foundation Pit of Songshanhu Metro Station
LIN Guangwen , YONG Yi, LI Kai
2012, 32(5): 713-718
DOI:
10.3973/j.issn.1672-741X.2012.05.019
Abstract
(
2012
)
PDF
(3826KB) (
1067
)
Application of Hydrostatic Leveling Technology in Realtime Remote Monitoring
MA Zhaolin, LI Yuanhai, LI Zhu
2012, 32(5): 719-724
DOI:
10.3973/j.issn.1672-741X.2012.05.020
Abstract
(
1587
)
PDF
(1707KB) (
1528
)
Application of Inside/outside Hole Millisecond Blasting Technology in Tunneling underneath Largescale Buildings
YANG Kunpeng, ZHANG Haibo, YANG Bing
2012, 32(5): 725-729
DOI:
10.3973/j.issn.1672-741X.2012.05.021
Abstract
(
1732
)
PDF
(1267KB) (
1427
)
Treatment Technologies for Waterrich Karst Cave under Tunnel Floor
FENG Haibao, QU Lili, YANG Xinpu, ZHANG Jun, MENG Lingde, JIANG Wande
2012, 32(5): 730-734
DOI:
10.3973/j.issn.1672-741X.2012.05.022
Abstract
(
3273
)
PDF
(1521KB) (
1225
)
Risk Monitoring Technology in Launching of Superlarge Diameter Slurry Shield Machine
WEI Linchun, ZHANG Lugen, HOU Yongmao
2012, 32(5): 735-738
DOI:
10.3973/j.issn. 1672-741X.2012.05.023
Abstract
(
1674
)
PDF
(2217KB) (
1367
)
Stationcrossing Technologies of Open TBM: Case Study on No. 6 Line of Chongqing MRT
ZHU Wenhui, WENG Chengxian, CHEN Jing
2012, 32(5): 739-748
DOI:
10.3973/j.issn.1672-741X.2012.05.024
Abstract
(
2392
)
PDF
(2546KB) (
1436
)
Selection of Wearingresistant Submerged Arc Welding Wires for Cutting Tools of Shield Machines
HU Jianping, TANG Liang, MA Zuoqiang
2012, 32(5): 749-751
DOI:
10.3973/j.issn.1672-741X.2012.05.025
Abstract
(
1664
)
PDF
(906KB) (
1218
)
Design of Power and Control System of Super Capacitor Dump Truck
SHEN Guili, WU Chaolai
2012, 32(5): 752-756
DOI:
10.3973/j.issn.1672-741X.2012.05.026
Abstract
(
1512
)
PDF
(924KB) (
1293
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat