Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2012, 32 (4) Published: 20 August 2012
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Study on Relationship between Increased Resistance of Selfdrive Excavating Machine and Launchingout Area of Resistant Block
LU Qingguo, MA Junpeng, ZHANG Yanqin
2012, 32(4): 437-440
DOI:
10.3973/j.issn.1672-741X.2012.04.001
Abstract
(
1846
)
PDF
(927KB) (
1198
)
Study on Influence of Primary Support on Plastic Zone and Displacement of Surrounding Rocks
YANG Jianhui, CHEN Zihai, WEN Xianmin, ZHU Hanhua
2012, 32(4): 441-447
DOI:
10.3973/j.issn.1672-741X.2012.04.002
Abstract
(
2576
)
PDF
(1729KB) (
1281
)
Study on Grounding Conditioning by Bentonite Slurry in Shield Tunneling in Loess Strata
HE Sijin
2012, 32(4): 448-453
DOI:
10.3973/j.issn.1672-741X.2012.04.003
Abstract
(
2466
)
PDF
(873KB) (
2091
)
Application of and Economical Analysis on Tunnel Excavation by Hydraulic Rock Drilling Jumbos
WEI Zhihong
2012, 32(4): 454-458
DOI:
10.3973/j.issn.1672-741X.2012.04.004
Abstract
(
1698
)
PDF
(693KB) (
1318
)
Application of Geological Radar in Quality Detection of Railway Tunnel Lining
LU Gang
2012, 32(4): 459-463
DOI:
10.3973/j.issn.1672-741X.2012.04.005
Abstract
(
1559
)
PDF
(1512KB) (
1622
)
Fireresistant Performance of Concrete Flue Slabs in Tunnel
LIU Xueyong
2012, 32(4): 464-466
DOI:
10.3973/j.issn.1672-741X.2012.04.006
Abstract
(
1444
)
PDF
(1286KB) (
1369
)
Analysis on Tensioning Length Test on Prestressed Rock Bolt in Construction of Underground Powerhouse of Jinping I Hydropower Station
ZHANG Chuan-Gong
2012, 32(4): 467-473
DOI:
10.3973/j.issn.1672-741X.2012.04.007
Abstract
(
1652
)
PDF
(1096KB) (
1187
)
Calculation of Reduction Coefficient of Water Pressure on Underwater Tunnel Lining
HENG Bo, WANG Jianyu, WU Jian
2012, 32(4): 474-478
DOI:
10.3973/j.issn.1672-741X.2012.04.008
Abstract
(
1815
)
PDF
(1439KB) (
1214
)
Analysis on Numerical Simulation of Excavation and Support of Deep Foundation Pit with Irregular Crosssection
LV Ruihu, LI Jianhua, YU Shaohui
2012, 32(4): 479-485
DOI:
10.3973/j.issn.1672-741X.2012.04.009
Abstract
(
2403
)
PDF
(1981KB) (
1442
)
Study on Rockburst Tendency of Complex Surrounding Rock Combination in a Deepburied Tunnel
TIAN Ning
2012, 32(4): 486-489
DOI:
10.3973/j.issn.1672-741X.2012.04.010
Abstract
(
1453
)
PDF
(1900KB) (
1111
)
Study on Appropriate Control Parameters of Grouting Circle of Guanjiao Tunnel in Waterrich Area
TIAN Shixiong, WANG Yonggang
2012, 32(4): 490-494
DOI:
10.3973/j.issn.1672-741X.2012.04.011
Abstract
(
1575
)
PDF
(778KB) (
1145
)
Study on Simulation of Air Distribution in Gas Fire Extinguishing Room of A Metro Station in Shenyang
CHEN Lei, CHEN Xi, LIU Changlin
2012, 32(4): 495-501
DOI:
10.3973/j.issn.1672-741X.2012.04.012
Abstract
(
2047
)
PDF
(2887KB) (
1049
)
Study on Propagation Rules of Vibration Waves Induced by Blasting of Adjacent Tunnel
Cong Shucui, Wang Hailiang
2012, 32(4): 502-505
DOI:
10.3973/j.issn.1672-741X.2012.04.013
Abstract
(
1712
)
PDF
(4013KB) (
1326
)
Analysis on Seismic Response of Adjacent Underground Structures
CHEN Jianmin, XIANG Yanyong
2012, 32(4): 506-513
DOI:
10.3973/j.issn.1672-741X.2012.04.014
Abstract
(
1540
)
PDF
(2071KB) (
1173
)
Discussion on Rebar Calculation of Metro Station Constructed by Cut and Cover Method
SONG Yi
2012, 32(4): 514-517
DOI:
10.3973/j.issn.1672-741X.2012.04.015
Abstract
(
1609
)
PDF
(862KB) (
1590
)
Safety Risk Assessment of Yemaliang Extralong Tunnel in Design Phase
LIU Jianhai
2012, 32(4): 518-522
DOI:
10.3973/j.issn.1672-741X.2012.04.016
Abstract
(
1473
)
PDF
(1287KB) (
1387
)
Rehabilitation Design of Tunnel in Urban Area under Complex Conditions
LIU Ting, XU Xueshen
2012, 32(4): 523-530
DOI:
10.3973/j.issn.1672-741X.2012.04.017
Abstract
(
1431
)
PDF
(1948KB) (
1260
)
Launching Technologies for Shield Machine on Curve with Small Radius in Soil Consolidated by Horizontal Freezing Method
LI Yihua, LI Zhijun, MENG Haifeng
2012, 32(4): 531-536
DOI:
10.3973/j.issn.1672-741X.2012.04.018
Abstract
(
1665
)
PDF
(4496KB) (
2244
)
Application of Largediameter Micro Steel Pipe Pile Underpinning Technology in Construction of Metro Works
XIE Yongsheng
2012, 32(4): 537-543
DOI:
10.3973/j.issn.1672-741X.2012.04.019
Abstract
(
2741
)
PDF
(1883KB) (
1251
)
Analysis and Control of Risks in Tunneling in Sandy Cobble Strata by Mining Method: Case Study on XidanLingjing Bystreet Section of Beijing Metro
ZHANG Yongjun
2012, 32(4): 544-551
DOI:
10.3973/j.issn.1672-741X.2012.04.020
Abstract
(
2203
)
PDF
(2276KB) (
1165
)
Technology for Deformation Monitoring of Retaining Structures of Deep Foundation Pits Based on Robot Total Station
PANG Hongjun, WEI Jiandong,HUANG Weiran
2012, 32(4): 552-556
DOI:
10.3973/j.issn.1672-741X.2012.04.021
Abstract
(
1903
)
PDF
(1180KB) (
1450
)
Pretreatment of Bedrock and Boulders before Shield Boring
YANG Zhigang
2012, 32(4): 557-560
DOI:
10.3973/j.issn.1672-741X.2012.04.022
Abstract
(
3153
)
PDF
(935KB) (
1260
)
Application of Wireless Adhoc Network in Monitoring of Steel Support Stress: Case Study on Construction of Deep Foundation Pit of Guangxi University Metro Station
HUANG Weihua
2012, 32(4): 561-565
DOI:
10.3973/j.issn.1672-741X.2012.04.023
Abstract
(
1874
)
PDF
(1295KB) (
1520
)
Application of Deephole Loosening Blasting Technology in Shield Tunneling through Longdistance Hard Rocks
ZENG Liang, LI Lu
2012, 32(4): 566-570
DOI:
10.3973/j.issn. 1672-741X.2012.04.024
Abstract
(
1703
)
PDF
(1986KB) (
1315
)
Treatment of Boulders Encountered in Shield Tunneling under Different Geological Conditions
WANG Penghua
2012, 32(4): 571-575
DOI:
10.3973/j.issn.1672-741X.2012.04.025
Abstract
(
2184
)
PDF
(1275KB) (
2070
)
Application of Liquid Nitrogen Freezing Technology in Secondary Watersealing of Working Shaft of Tunnels
WANG Zhenwei, WANG Xingtong
2012, 32(4): 576-580
DOI:
10.3973/j.issn.1672-741X.2012.04.026
Abstract
(
1790
)
PDF
(971KB) (
1960
)
Realtime Monitoring and Feedback Technologies for Open TBM Transferring along Intermediate Ceiling of Metro Station
LI Hui
2012, 32(4): 581-586
DOI:
10.3973/j.issn.1672-741X.2012.04.027
Abstract
(
2093
)
PDF
(3198KB) (
1102
)
Study on Damage of Hard Rock TBM Induced by Tunneling Through Jointdenselydeveloped Hard Rock Section and Countermeasures
HUANG Wenpeng
2012, 32(4): 587-593
DOI:
10.3973/j.issn.1672-741X.2012.04.028
Abstract
(
1453
)
PDF
(2067KB) (
1401
)
Development of Foam Generating System of EPB Shield
ZHENG Yangrui, LIN Shiyou
2012, 32(4): 594-597
DOI:
10.3973/j.issn.1672-741X.2012.04.029
Abstract
(
1675
)
PDF
(2484KB) (
1635
)
Development of Virtual Reality System of Shield Machine and Boring
HAN Weifeng, LI Fengyuan, CHEN Qiwei
2012, 32(4): 598-603
DOI:
10.3973/j.issn.1672-741X.2012.04.030
Abstract
(
2020
)
PDF
(1599KB) (
1398
)
Tunnelling Projects in London: Olympic City 2012
Martin C. Knights
2012, 32(4): 604-612
Abstract
(
1909
)
PDF
(5064KB) (
1285
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat