Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2010, 30 (3) Published:
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Analysis on Fluctuation Rules of Ground Water Levels outside Axial Dry
Docks during Water Filling Period and Water Discharging Period
LI Feng-Guan
2010, 30(3): 221-224
Abstract
(
2577
)
PDF
(1421KB) (
898
)
Study on Thermal Insulation of Tunnels in Permafrost
Soil on QinghaiTibet Railway
LIU Xiao-Gang
2010, 30(3): 225-230
Abstract
(
2198
)
PDF
(5636KB) (
1235
)
Design and Development of Analysis and Management System of Tunnel Monitoring Data
FANG Yu, Liu-Kai-Yun
2010, 30(3): 231-234,245
Abstract
(
2217
)
PDF
(1965KB) (
1306
)
Study on Anchoring Technology of Screw Bolts in Soils
LIN Yun-Hong, LUO Wen-Jing, LIN Fei
2010, 30(3): 235-237,256
Abstract
(
2620
)
PDF
(1137KB) (
1204
)
Study on Timedependent Variation Rules of Internal Force of
Tunnel Lining under Influence of Several Factors
XU Ling, Huang-Hong-Wei
2010, 30(3): 238-241
Abstract
(
2465
)
PDF
(968KB) (
1006
)
Influence of Coverspan ratios and Heightspan ratios of Metro Tunnels on Ground Surface Settlement
MAO Wei-Zhong, Wang-Yun-Long, Zhang-Nian
2010, 30(3): 242-245
Abstract
(
3082
)
PDF
(2457KB) (
1190
)
Discussion on Construction Technology for Halfburied Tunnel Portal Section in Extremely AsymmetricallyLoaded Condition
WANG Xue-Ji, YIN Dong-Mei
2010, 30(3): 246-250,284
Abstract
(
2336
)
PDF
(8228KB) (
876
)
Design of Test Methods for Restrained Tensile
Creep of Structural Concrete at Early Age
GAO Sen, LIU Xian, YUAN Yong, HOU Jing-Feng
2010, 30(3): 251-256
Abstract
(
2158
)
PDF
(1577KB) (
1172
)
Application of Comprehensive Fuzzy Evaluation Method in
Waterbearing Forecast in Tunnel Works
BANG Ling-Xing, SHU Zi-Jiang, MI Shi-Wen
2010, 30(3): 257-261
Abstract
(
2213
)
PDF
(619KB) (
743
)
Application of Optical Fiber Sensing Technology in
Monitoring of Urban Metro Works
ZHANG Shuai-Jun, LI Yun
2010, 30(3): 262-267
Abstract
(
2101
)
PDF
(2502KB) (
1268
)
Selection of Architecture Mode of Metro Stations
CAO Dong-Qian, DIAO Xiao-Dong
2010, 30(3): 268-270,280
Abstract
(
1463
)
PDF
(615KB) (
1503
)
Case Study on Design and Construction of Assembly
Chamber for 12.43m Largediameter TBM in Construction
of Diversion Tunnel of Jinping Hydropower Station
DENG Yong
2010, 30(3): 271-275,303
Abstract
(
3089
)
PDF
(1599KB) (
1599
)
Study and Application of Grouting Reinforcement Technology in
Coping with F11 Fault of Qiyueshan Tunnel
DONG Yu-Guo
2010, 30(3): 276-280
Abstract
(
2673
)
PDF
(1335KB) (
1032
)
Establishment of Grouting Standard for Xiangshan
Extralong Tunnel on LongyanXiamen Railway
JIN Jiang-Guo
2010, 30(3): 281-284
Abstract
(
2349
)
PDF
(429KB) (
1035
)
Key Construction Technology for Qiyueshan Tunnel on YichangWanzhou
Railway in Fault Containing Rich Highpressure Water
SHANG Chong-Lun
2010, 30(3): 285-291
Abstract
(
2222
)
PDF
(2345KB) (
916
)
Application of Freezing Consolidation Technology in Construction of
Long Connecting Tunnels of Metro Works
DIAO Gong-Guang, ZHANG Yang-Gen
2010, 30(3): 292-297,316
Abstract
(
2250
)
PDF
(2363KB) (
1419
)
Case Study on Shield Advancing through Mined
Tunnel Section of Urban Metro Work
DIAO Gang-Ling, Wang-Li-Chuan
2010, 30(3): 298-303
Abstract
(
2860
)
PDF
(1980KB) (
1428
)
Discussion on Design and Execution of Grouting for F11 Highpressure
and Waterrich Fault of Qiyueshan Tunnel
SUN Guo-Qiang
2010, 30(3): 304-308
Abstract
(
2307
)
PDF
(1596KB) (
997
)
Key Construction Technology for Long Smallspaced
Verticaloverlapped Shieldbored Tunnels
FANG Dong-Meng, Li-Beng-An
2010, 30(3): 309-312
Abstract
(
2336
)
PDF
(1393KB) (
1075
)
Technology of Roof Ripping Between Large CrossSectional Inclined
Shaft and Main Tunnel: Case Study on Baojiashan Tunnel
SHI Zhen-Yu
2010, 30(3): 313-316
Abstract
(
2427
)
PDF
(967KB) (
1301
)
Discussion on Prevention and Control of Delayed Settlement Induced by
Shield Tunneling in Waterrich Sandy Cobble Stratum in Chengdu
LUO Song, ZHANG Gao-Ran
2010, 30(3): 317-319,335
Abstract
(
2584
)
PDF
(2951KB) (
1431
)
Application of Doublearch Tunnels with Straight Composite Center
Pillars in Complex Topographic Conditions
CEN Dao-Yong
2010, 30(3): 320-323
Abstract
(
2717
)
PDF
(918KB) (
954
)
Analysis on and Treatment of Malfunction of Cutterhead Drive Hydraulic
System of Shield Machines: Case Study on a Shield
Machine Manufactured by Herrenknecht AG
GU Yao-Wei
2010, 30(3): 324-326
Abstract
(
2680
)
PDF
(1629KB) (
1721
)
Selection of Lining Formworks for Fullcircular Crosssection Tunnels of
Water Conservancy and Hydropower Projects
YANG Yan-Ling, TUN Fa-Zhan, XU Xiao-Li
2010, 30(3): 327-330,343
Abstract
(
1989
)
PDF
(1243KB) (
1156
)
Gas Pipeline Protection Technology in Phase Ⅱ
Project of Line 4 of Shenzhen Metro
WANG Jian-Xin, CHEN Shou-Gen, WANG Jing-Hua
2010, 30(3): 331-335
Abstract
(
2555
)
PDF
(1362KB) (
1193
)
Case Study on Construction Ventilation Mode of No. 3
Inclined Shaft Working Lot of Baojiashan Tunnel
MU Qian-Xiang, CAO Qi-Cai, XIAO Yuan-Beng
2010, 30(3): 336-338,343
Abstract
(
2617
)
PDF
(956KB) (
887
)
Procedure of Replacing of Cutting Teeth under
Atmospheric Pressure and Its Optimization
WANG Zhi-Cheng
2010, 30(3): 339-343
Abstract
(
2241
)
PDF
(1884KB) (
1338
)
Case Study on Operation Management Technology of Qinling
Zhongnanshan Superlong Highway Tunnel
DIAO Chao-Zhi, HU Beng
2010, 30(3): 344-347,350
Abstract
(
3133
)
PDF
(2164KB) (
1452
)
Causes and Countermeasures for Hollowing of
Steel Bottom Plates of Immersed Tubes
LI Yun-Chao, CHEN Xia
2010, 30(3): 348-350
Abstract
(
2151
)
PDF
(603KB) (
1082
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat