Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2010, 30 (3) Published: 10 June 2010
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Analysis on Fluctuation Rules of Ground Water Levels outside Axial Dry
Docks during Water Filling Period and Water Discharging Period
LI Feng-Guan
2010, 30(3): 221-224
Abstract
(
2528
)
PDF
(1421KB) (
881
)
Study on Thermal Insulation of Tunnels in Permafrost
Soil on QinghaiTibet Railway
LIU Xiao-Gang
2010, 30(3): 225-230
Abstract
(
2132
)
PDF
(5636KB) (
1129
)
Design and Development of Analysis and Management System of Tunnel Monitoring Data
FANG Yu, Liu-Kai-Yun
2010, 30(3): 231-234,245
Abstract
(
2162
)
PDF
(1965KB) (
1278
)
Study on Anchoring Technology of Screw Bolts in Soils
LIN Yun-Hong, LUO Wen-Jing, LIN Fei
2010, 30(3): 235-237,256
Abstract
(
2542
)
PDF
(1137KB) (
1140
)
Study on Timedependent Variation Rules of Internal Force of
Tunnel Lining under Influence of Several Factors
XU Ling, Huang-Hong-Wei
2010, 30(3): 238-241
Abstract
(
2394
)
PDF
(968KB) (
974
)
Influence of Coverspan ratios and Heightspan ratios of Metro Tunnels on Ground Surface Settlement
MAO Wei-Zhong, Wang-Yun-Long, Zhang-Nian
2010, 30(3): 242-245
Abstract
(
3011
)
PDF
(2457KB) (
1100
)
Discussion on Construction Technology for Halfburied Tunnel Portal Section in Extremely AsymmetricallyLoaded Condition
WANG Xue-Ji, YIN Dong-Mei
2010, 30(3): 246-250,284
Abstract
(
2266
)
PDF
(8228KB) (
860
)
Design of Test Methods for Restrained Tensile
Creep of Structural Concrete at Early Age
GAO Sen, LIU Xian, YUAN Yong, HOU Jing-Feng
2010, 30(3): 251-256
Abstract
(
2076
)
PDF
(1577KB) (
1142
)
Application of Comprehensive Fuzzy Evaluation Method in
Waterbearing Forecast in Tunnel Works
BANG Ling-Xing, SHU Zi-Jiang, MI Shi-Wen
2010, 30(3): 257-261
Abstract
(
2115
)
PDF
(619KB) (
716
)
Application of Optical Fiber Sensing Technology in
Monitoring of Urban Metro Works
ZHANG Shuai-Jun, LI Yun
2010, 30(3): 262-267
Abstract
(
2013
)
PDF
(2502KB) (
1238
)
Selection of Architecture Mode of Metro Stations
CAO Dong-Qian, DIAO Xiao-Dong
2010, 30(3): 268-270,280
Abstract
(
1420
)
PDF
(615KB) (
1388
)
Case Study on Design and Construction of Assembly
Chamber for 12.43m Largediameter TBM in Construction
of Diversion Tunnel of Jinping Hydropower Station
DENG Yong
2010, 30(3): 271-275,303
Abstract
(
3042
)
PDF
(1599KB) (
1244
)
Study and Application of Grouting Reinforcement Technology in
Coping with F11 Fault of Qiyueshan Tunnel
DONG Yu-Guo
2010, 30(3): 276-280
Abstract
(
2606
)
PDF
(1335KB) (
965
)
Establishment of Grouting Standard for Xiangshan
Extralong Tunnel on LongyanXiamen Railway
JIN Jiang-Guo
2010, 30(3): 281-284
Abstract
(
2295
)
PDF
(429KB) (
974
)
Key Construction Technology for Qiyueshan Tunnel on YichangWanzhou
Railway in Fault Containing Rich Highpressure Water
SHANG Chong-Lun
2010, 30(3): 285-291
Abstract
(
2150
)
PDF
(2345KB) (
886
)
Application of Freezing Consolidation Technology in Construction of
Long Connecting Tunnels of Metro Works
DIAO Gong-Guang, ZHANG Yang-Gen
2010, 30(3): 292-297,316
Abstract
(
2223
)
PDF
(2363KB) (
1373
)
Case Study on Shield Advancing through Mined
Tunnel Section of Urban Metro Work
DIAO Gang-Ling, Wang-Li-Chuan
2010, 30(3): 298-303
Abstract
(
2734
)
PDF
(1980KB) (
1388
)
Discussion on Design and Execution of Grouting for F11 Highpressure
and Waterrich Fault of Qiyueshan Tunnel
SUN Guo-Qiang
2010, 30(3): 304-308
Abstract
(
2247
)
PDF
(1596KB) (
949
)
Key Construction Technology for Long Smallspaced
Verticaloverlapped Shieldbored Tunnels
FANG Dong-Meng, Li-Beng-An
2010, 30(3): 309-312
Abstract
(
2275
)
PDF
(1393KB) (
1044
)
Technology of Roof Ripping Between Large CrossSectional Inclined
Shaft and Main Tunnel: Case Study on Baojiashan Tunnel
SHI Zhen-Yu
2010, 30(3): 313-316
Abstract
(
2369
)
PDF
(967KB) (
1255
)
Discussion on Prevention and Control of Delayed Settlement Induced by
Shield Tunneling in Waterrich Sandy Cobble Stratum in Chengdu
LUO Song, ZHANG Gao-Ran
2010, 30(3): 317-319,335
Abstract
(
2526
)
PDF
(2951KB) (
1312
)
Application of Doublearch Tunnels with Straight Composite Center
Pillars in Complex Topographic Conditions
CEN Dao-Yong
2010, 30(3): 320-323
Abstract
(
2618
)
PDF
(918KB) (
906
)
Analysis on and Treatment of Malfunction of Cutterhead Drive Hydraulic
System of Shield Machines: Case Study on a Shield
Machine Manufactured by Herrenknecht AG
GU Yao-Wei
2010, 30(3): 324-326
Abstract
(
2618
)
PDF
(1629KB) (
1674
)
Selection of Lining Formworks for Fullcircular Crosssection Tunnels of
Water Conservancy and Hydropower Projects
YANG Yan-Ling, TUN Fa-Zhan, XU Xiao-Li
2010, 30(3): 327-330,343
Abstract
(
1929
)
PDF
(1243KB) (
1054
)
Gas Pipeline Protection Technology in Phase Ⅱ
Project of Line 4 of Shenzhen Metro
WANG Jian-Xin, CHEN Shou-Gen, WANG Jing-Hua
2010, 30(3): 331-335
Abstract
(
2475
)
PDF
(1362KB) (
1142
)
Case Study on Construction Ventilation Mode of No. 3
Inclined Shaft Working Lot of Baojiashan Tunnel
MU Qian-Xiang, CAO Qi-Cai, XIAO Yuan-Beng
2010, 30(3): 336-338,343
Abstract
(
2536
)
PDF
(956KB) (
845
)
Procedure of Replacing of Cutting Teeth under
Atmospheric Pressure and Its Optimization
WANG Zhi-Cheng
2010, 30(3): 339-343
Abstract
(
2167
)
PDF
(1884KB) (
1299
)
Case Study on Operation Management Technology of Qinling
Zhongnanshan Superlong Highway Tunnel
DIAO Chao-Zhi, HU Beng
2010, 30(3): 344-347,350
Abstract
(
2941
)
PDF
(2164KB) (
1224
)
Causes and Countermeasures for Hollowing of
Steel Bottom Plates of Immersed Tubes
LI Yun-Chao, CHEN Xia
2010, 30(3): 348-350
Abstract
(
2070
)
PDF
(603KB) (
1031
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat