Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (4) Published: 20 August 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Discussions on Calculation Method for Slurry Treatment
Data in Shield Tunnel Construction
LEI Zhi-Jiang, CENG Chui-Gang
2006, 26(4): 1-2,36
DOI:
A
Abstract
(
2051
)
PDF
(588KB) (
1641
)
Simulating of Tunnel Excavation by means of
Spatial Opposite Loading Method
HU Qiang-An, CUI Gang, JIANG Li-Jun
2006, 26(4): 3-5
DOI:
A
Abstract
(
1668
)
PDF
(526KB) (
1141
)
Threedimensional Analytic Solution for Ultimate Bearing Capacity
of Ground under Complicated Loading Conditions
ZHENG Ai-Yuan
2006, 26(4): 6-9,24
DOI:
A
Abstract
(
1587
)
PDF
(803KB) (
951
)
Discussions on Dewatering Technology for Deep Foundation Pit Works
LEI Zhen-Hua
2006, 26(4): 10-12,27
DOI:
B
Abstract
(
1537
)
PDF
(588KB) (
1907
)
Impact of Overbreak/shortbreak on Tunnel Construction
Cost and Their Control Approaches
WANG Cheng-Shan
2006, 26(4): 13-15
DOI:
B
Abstract
(
1863
)
PDF
(367KB) (
1626
)
Analysis on Insitu Measurement of Biased Pressure
Section of Doublearched Fuxi Tunnel
TUN Jiang, LIU Bao-Guo
2006, 26(4): 16-19,48
DOI:
B
Abstract
(
1790
)
PDF
(664KB) (
1034
)
Comparison of Different Operation Ventilation
Options for Longtan Superlong Highway Tunnel
CHEN Guang-Meng, CHEN Zhang, HU Yi-Hua
2006, 26(4): 20-24
DOI:
B
Abstract
(
2143
)
PDF
(548KB) (
1082
)
Comments on Evd Test Method for
Roadbeds of Passengerdedicated Railways
ZHOU E-Yu, TANG Ge, YU Tian-Jin, JIAO Cang
2006, 26(4): 25-27
DOI:
A
Abstract
(
1632
)
PDF
(399KB) (
1413
)
Design of Architectural Scheme of Panyu Square
Station on Line 3 of Guangzhou Metro
TAO Lan
2006, 26(4): 28-31
DOI:
A
Abstract
(
1874
)
PDF
(1115KB) (
1279
)
Structural Design of Separated Island Metro Station Constructed
by means of PileBeamArch Mining Method
ZHANG Mei-Qin
2006, 26(4): 32-36
DOI:
A
Abstract
(
1734
)
PDF
(1355KB) (
1301
)
Erection, Launching and Arrival Technology
of Slurry Shield Machine in Deep Shafts
TANG Zhong
2006, 26(4): 37-39,71
DOI:
B
Abstract
(
1772
)
PDF
(801KB) (
1060
)
Excavation Technology of Shallowburied Portal Section of
Largespanned Smallspaced Twintube Tunnel in Soft Ground
HUANG Xin-She, CAO Zheng-Chi
2006, 26(4): 40-42,60
DOI:
B
Abstract
(
1939
)
PDF
(953KB) (
1068
)
Several Aspects to Which Attention should be Paid during Construction
of Xiang'an Subsea Tunnel in Xiamen
LI Shun-Rong
2006, 26(4): 43-45
DOI:
B
Abstract
(
2132
)
PDF
(417KB) (
1261
)
Ground Consolidation Technology for Mined Underground
Metro Station Located above Existing Running Tunnel
WANG Xian-Tang
2006, 26(4): 46-48
DOI:
B
Abstract
(
2096
)
PDF
(368KB) (
1041
)
Horizontal Mixing Consolidation Technology Applied in
Ground Consisting of Mud Layers
DENG Jian-Lin
2006, 26(4): 49-51,71
DOI:
B
Abstract
(
1669
)
PDF
(873KB) (
1045
)
Cause Analysis on and Repairing of Lining Cracks of a Railway Tunnel
WANG Meng-Yang
2006, 26(4): 52-53,83
DOI:
B
Abstract
(
1718
)
PDF
(612KB) (
1380
)
Study on Fullface Construction Scheme of
Fractured Section of Dabieshan Tunnel
ZHOU E-Yu
2006, 26(4): 54-57
DOI:
A
Abstract
(
2010
)
PDF
(757KB) (
1071
)
Analysis on Reasons for Quality Defects of Shielddriven
Tunnels and Their Prevention Measures
HUANG Chao
2006, 26(4): 58-60
DOI:
B
Abstract
(
1564
)
PDF
(326KB) (
1137
)
Excavation and Reinforcement Technology for Foundation
Pits in Saturated Fine Silt Sands
LIU Kun-Feng, GUAN Ze-Yang
2006, 26(4): 61-63,67
DOI:
B
Abstract
(
1928
)
PDF
(724KB) (
1156
)
Erection Construction Technology of Largescale
Universal Wedgeshaped Segments
DAI Shi-Min, LI Zhang-Lin, HE Guo-Jun
2006, 26(4): 64-67
DOI:
B
Abstract
(
1956
)
PDF
(548KB) (
1870
)
Study on EPB Shield Machine Construction Technology under Complex
Geological Conditions Achieved in Guangzhou Metro
DU Jian-Hua, CHEN Gong-Yun
2006, 26(4): 68-71
DOI:
B
Abstract
(
1799
)
PDF
(374KB) (
1233
)
Problems in Construction of Bored CastinSitu Concrete
Piles in Karst Region and their Countermeasures
LI Lin-Feng
2006, 26(4): 72-74
DOI:
B
Abstract
(
1558
)
PDF
(334KB) (
764
)
Application of GPS Technology in Monitoring of Pipe Culvert
beneath which Shielddriven Tunnel is Constructed
CANG Yan-Wei, HU Kai, LIU Jian-Guo
2006, 26(4): 75-77
DOI:
B
Abstract
(
3629
)
PDF
(437KB) (
927
)
Application of Monitoring and Measurement in Lined Largespan
Portion of Exit Section of Gaoyangzai Tunnel
WANG Guang-Hui, FANG Dun-Bei
2006, 26(4): 78-80
DOI:
B
Abstract
(
2139
)
PDF
(503KB) (
929
)
Construction Technology for Portal Section of
Shallowburied Tunnel in Soft Ground
YANG Chang-Jing
2006, 26(4): 81-83
DOI:
B
Abstract
(
1950
)
PDF
(515KB) (
1601
)
Design of Thrust System of Shield Machine
ZHENG Zhi-Min
2006, 26(4): 84-87
DOI:
B
Abstract
(
1795
)
PDF
(404KB) (
1789
)
Equipment Preparation for Boring Construction of
Shield Machines Crossing Underneath Rivers
LUO Wei-Xiong
2006, 26(4): 88-90,103
DOI:
B
Abstract
(
1532
)
PDF
(746KB) (
1241
)
Type Selection and Matching of Hoisting System
Applied in Inclined Shaft of Shiya Tunnel
SHI Sai-Feng, HUANG Yong-Hua
2006, 26(4): 91-92
DOI:
B
Abstract
(
1569
)
PDF
(279KB) (
1089
)
Comments on Decentralization and Balance of Legal Person's Governance
Structure of Restructured Stateowned Enterprises
TUN E-Yong, Zhang-Guang-Di
2006, 26(4): 93-96
DOI:
C
Abstract
(
1234
)
PDF
(374KB) (
1054
)
Recommendations on Improvement of China’s Accountancy Criterion System
GU Yu-Dong
2006, 26(4): 97-99
DOI:
C
Abstract
(
1247
)
PDF
(329KB) (
794
)
Comments on Internal Control of Enterprises in China
LI Yan
2006, 26(4): 100-103
DOI:
C
Abstract
(
1145
)
PDF
(395KB) (
937
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat