Loading...
ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Current Issue
2006, 26 (4) Published: 20 August 2006
Previous Issue
Next Issue
Back issue
wenzhang
wenzhang
Discussions on Calculation Method for Slurry Treatment
Data in Shield Tunnel Construction
LEI Zhi-Jiang, CENG Chui-Gang
2006, 26(4): 1-2,36
DOI:
A
Abstract
(
2046
)
PDF
(588KB) (
1634
)
Simulating of Tunnel Excavation by means of
Spatial Opposite Loading Method
HU Qiang-An, CUI Gang, JIANG Li-Jun
2006, 26(4): 3-5
DOI:
A
Abstract
(
1665
)
PDF
(526KB) (
1135
)
Threedimensional Analytic Solution for Ultimate Bearing Capacity
of Ground under Complicated Loading Conditions
ZHENG Ai-Yuan
2006, 26(4): 6-9,24
DOI:
A
Abstract
(
1582
)
PDF
(803KB) (
950
)
Discussions on Dewatering Technology for Deep Foundation Pit Works
LEI Zhen-Hua
2006, 26(4): 10-12,27
DOI:
B
Abstract
(
1533
)
PDF
(588KB) (
1897
)
Impact of Overbreak/shortbreak on Tunnel Construction
Cost and Their Control Approaches
WANG Cheng-Shan
2006, 26(4): 13-15
DOI:
B
Abstract
(
1859
)
PDF
(367KB) (
1621
)
Analysis on Insitu Measurement of Biased Pressure
Section of Doublearched Fuxi Tunnel
TUN Jiang, LIU Bao-Guo
2006, 26(4): 16-19,48
DOI:
B
Abstract
(
1782
)
PDF
(664KB) (
1028
)
Comparison of Different Operation Ventilation
Options for Longtan Superlong Highway Tunnel
CHEN Guang-Meng, CHEN Zhang, HU Yi-Hua
2006, 26(4): 20-24
DOI:
B
Abstract
(
2138
)
PDF
(548KB) (
1079
)
Comments on Evd Test Method for
Roadbeds of Passengerdedicated Railways
ZHOU E-Yu, TANG Ge, YU Tian-Jin, JIAO Cang
2006, 26(4): 25-27
DOI:
A
Abstract
(
1627
)
PDF
(399KB) (
1408
)
Design of Architectural Scheme of Panyu Square
Station on Line 3 of Guangzhou Metro
TAO Lan
2006, 26(4): 28-31
DOI:
A
Abstract
(
1865
)
PDF
(1115KB) (
1276
)
Structural Design of Separated Island Metro Station Constructed
by means of PileBeamArch Mining Method
ZHANG Mei-Qin
2006, 26(4): 32-36
DOI:
A
Abstract
(
1724
)
PDF
(1355KB) (
1281
)
Erection, Launching and Arrival Technology
of Slurry Shield Machine in Deep Shafts
TANG Zhong
2006, 26(4): 37-39,71
DOI:
B
Abstract
(
1768
)
PDF
(801KB) (
1053
)
Excavation Technology of Shallowburied Portal Section of
Largespanned Smallspaced Twintube Tunnel in Soft Ground
HUANG Xin-She, CAO Zheng-Chi
2006, 26(4): 40-42,60
DOI:
B
Abstract
(
1930
)
PDF
(953KB) (
1063
)
Several Aspects to Which Attention should be Paid during Construction
of Xiang'an Subsea Tunnel in Xiamen
LI Shun-Rong
2006, 26(4): 43-45
DOI:
B
Abstract
(
2125
)
PDF
(417KB) (
1255
)
Ground Consolidation Technology for Mined Underground
Metro Station Located above Existing Running Tunnel
WANG Xian-Tang
2006, 26(4): 46-48
DOI:
B
Abstract
(
2090
)
PDF
(368KB) (
1039
)
Horizontal Mixing Consolidation Technology Applied in
Ground Consisting of Mud Layers
DENG Jian-Lin
2006, 26(4): 49-51,71
DOI:
B
Abstract
(
1665
)
PDF
(873KB) (
1040
)
Cause Analysis on and Repairing of Lining Cracks of a Railway Tunnel
WANG Meng-Yang
2006, 26(4): 52-53,83
DOI:
B
Abstract
(
1714
)
PDF
(612KB) (
1374
)
Study on Fullface Construction Scheme of
Fractured Section of Dabieshan Tunnel
ZHOU E-Yu
2006, 26(4): 54-57
DOI:
A
Abstract
(
2004
)
PDF
(757KB) (
1069
)
Analysis on Reasons for Quality Defects of Shielddriven
Tunnels and Their Prevention Measures
HUANG Chao
2006, 26(4): 58-60
DOI:
B
Abstract
(
1561
)
PDF
(326KB) (
1128
)
Excavation and Reinforcement Technology for Foundation
Pits in Saturated Fine Silt Sands
LIU Kun-Feng, GUAN Ze-Yang
2006, 26(4): 61-63,67
DOI:
B
Abstract
(
1922
)
PDF
(724KB) (
1152
)
Erection Construction Technology of Largescale
Universal Wedgeshaped Segments
DAI Shi-Min, LI Zhang-Lin, HE Guo-Jun
2006, 26(4): 64-67
DOI:
B
Abstract
(
1950
)
PDF
(548KB) (
1864
)
Study on EPB Shield Machine Construction Technology under Complex
Geological Conditions Achieved in Guangzhou Metro
DU Jian-Hua, CHEN Gong-Yun
2006, 26(4): 68-71
DOI:
B
Abstract
(
1793
)
PDF
(374KB) (
1213
)
Problems in Construction of Bored CastinSitu Concrete
Piles in Karst Region and their Countermeasures
LI Lin-Feng
2006, 26(4): 72-74
DOI:
B
Abstract
(
1551
)
PDF
(334KB) (
758
)
Application of GPS Technology in Monitoring of Pipe Culvert
beneath which Shielddriven Tunnel is Constructed
CANG Yan-Wei, HU Kai, LIU Jian-Guo
2006, 26(4): 75-77
DOI:
B
Abstract
(
3624
)
PDF
(437KB) (
924
)
Application of Monitoring and Measurement in Lined Largespan
Portion of Exit Section of Gaoyangzai Tunnel
WANG Guang-Hui, FANG Dun-Bei
2006, 26(4): 78-80
DOI:
B
Abstract
(
2133
)
PDF
(503KB) (
925
)
Construction Technology for Portal Section of
Shallowburied Tunnel in Soft Ground
YANG Chang-Jing
2006, 26(4): 81-83
DOI:
B
Abstract
(
1946
)
PDF
(515KB) (
1597
)
Design of Thrust System of Shield Machine
ZHENG Zhi-Min
2006, 26(4): 84-87
DOI:
B
Abstract
(
1793
)
PDF
(404KB) (
1784
)
Equipment Preparation for Boring Construction of
Shield Machines Crossing Underneath Rivers
LUO Wei-Xiong
2006, 26(4): 88-90,103
DOI:
B
Abstract
(
1525
)
PDF
(746KB) (
1232
)
Type Selection and Matching of Hoisting System
Applied in Inclined Shaft of Shiya Tunnel
SHI Sai-Feng, HUANG Yong-Hua
2006, 26(4): 91-92
DOI:
B
Abstract
(
1565
)
PDF
(279KB) (
1086
)
Comments on Decentralization and Balance of Legal Person's Governance
Structure of Restructured Stateowned Enterprises
TUN E-Yong, Zhang-Guang-Di
2006, 26(4): 93-96
DOI:
C
Abstract
(
1230
)
PDF
(374KB) (
1048
)
Recommendations on Improvement of China’s Accountancy Criterion System
GU Yu-Dong
2006, 26(4): 97-99
DOI:
C
Abstract
(
1243
)
PDF
(329KB) (
791
)
Comments on Internal Control of Enterprises in China
LI Yan
2006, 26(4): 100-103
DOI:
C
Abstract
(
1142
)
PDF
(395KB) (
931
)
Online System
Submit a paper
Peer review
Editor center
Chief editor center
WeChat